CN-115237953-B - Highway engineering cost compiling method and device, electronic equipment and storage medium

CN115237953BCN 115237953 BCN115237953 BCN 115237953BCN-115237953-B

Abstract

The invention provides a highway engineering cost compiling method, a highway engineering cost compiling device, an electronic device and a storage medium, wherein the to-be-processed information is obtained based on a to-be-processed engineering quantity table by obtaining the to-be-processed engineering quantity table, the to-be-processed information comprises current project key information and current construction method information, and based on the current project key information and the current construction method information, determining current quota information from a preset quota retrieval library, determining a current price setting scheme from a preset price setting scheme library based on the current quota information, selecting a current project section from a preset project section library based on the current project key information, and generating an original data table capable of importing cost software based on the current price setting scheme and the current project section. The method can quickly generate the original data table capable of leading in the cost software without manually establishing the corresponding relation between the quantity table and the budget book, thereby improving the accuracy and efficiency of engineering cost budget book programming and improving the rationality of the price combining scheme.

Inventors

  • HOU JIE
  • QUE YUNLONG
  • WANG LIYAO
  • WEI KANG

Assignees

  • 中交公路规划设计院有限公司

Dates

Publication Date
20260508
Application Date
20220706

Claims (9)

  1. 1. A method of constructing a highway construction cost, the method comprising: acquiring an engineering quantity table to be processed; Obtaining information to be processed based on the engineering quantity table to be processed, wherein the information to be processed comprises current project key information and current construction method information, and the step of obtaining the information to be processed comprises the following steps: Identifying a row header and a list header of the engineering quantity table to be processed, wherein the list header supports a top-to-bottom or bottom-to-top reading sequence, and the row header supports a left-to-right or right-to-left reading sequence; The information corresponding to the list head and the information corresponding to the list head are connected in series to form a key information chain, and key information of the current project is determined based on a preset list head key word library by utilizing the key information chain; determining current construction method information based on a preset construction method library; Determining current quota information from a preset quota retrieval library based on the current project key information and the current construction method information; Determining a current price setting scheme from a preset price setting scheme library based on the current quota information; Selecting a current project section from a preset project section library based on the current project key information; And generating an original data table capable of importing cost software based on the current price setting scheme and the current project section.
  2. 2. The method according to claim 1, characterized in that the information to be processed further comprises current parameter information and/or a current action list; the step of determining the current quota information from a preset quota search library based on the current project key information and the current construction method information comprises the following steps: Determining current quota information from a preset quota search library based on the current project key information, the current construction method information and the current parameter information, and/or, And determining current quota information from a preset quota retrieval library based on the current project key information, the current construction method information and the current measure list.
  3. 3. The method according to claim 1, wherein the preset price group scheme library comprises a rated engineering quantity picking scheme and a sub-engineering price group scheme, and the preset price group scheme library comprises a corresponding relation between the sub-engineering price group scheme and the rated engineering quantity picking scheme; The step of determining the current price setting scheme from a preset price setting scheme library based on the current quota information comprises the following steps: Determining a current sub project group price scheme based on the current quota information and a preset group price scheme library; Under the condition that the engineering quantity corresponding to the current sub engineering price-setting scheme does not meet the preset engineering quantity condition, determining a current quota engineering quantity extraction scheme based on the current sub engineering price-setting scheme and a preset price-setting scheme library; And determining a current price grouping scheme based on the current sub-project price grouping scheme and the current quota project quantity extraction scheme.
  4. 4. A method according to claim 3, wherein after the step of determining a current itemized engineering group price scheme based on the current quota information and a preset group price scheme library, the method further comprises: And under the condition that the engineering quantity corresponding to the current sub engineering price-setting scheme meets the preset engineering quantity condition, taking the current sub engineering price-setting scheme as a current price-setting scheme.
  5. 5. The method according to claim 3, wherein the preset group price scheme library comprises a corresponding relation between a sub scheme and rated engineering quantity information; The step of determining the current quota engineering quantity extraction scheme based on the current sub-engineering price combination scheme and a preset price combination scheme library comprises the following steps: Determining that a sub-scheme of the corresponding engineering quantity does not exist in the current sub-engineering group price scheme as a current sub-scheme; and determining the current quota engineering quantity information corresponding to the current sub-scheme based on the current sub-scheme and a preset price group scheme library, and taking the current quota engineering quantity information as a current quota engineering quantity extraction scheme.
  6. 6. The method according to any one of claims 1-5, wherein prior to the step of determining current rating information from a preset rating search pool based on the current project key information and the current work method information, the method further comprises: generating rated search keywords based on standard project key information, standard measure list, standard construction method information and standard parameter keywords of a standard quantity table; Determining quota adjustment condition information based on the pre-acquired quota item adjustment information; And generating the quota search library based on the quota search keyword and the quota adjustment condition information.
  7. 7. A highway construction cost programming device, said device comprising: The first acquisition module is used for acquiring an engineering quantity table to be processed; the second obtaining module is configured to obtain information to be processed based on the number of projects to be processed, where the information to be processed includes current project key information and current construction method information, and the step of obtaining the information to be processed includes: Identifying a row header and a list header of the engineering quantity table to be processed, wherein the list header supports a top-to-bottom or bottom-to-top reading sequence, and the row header supports a left-to-right or right-to-left reading sequence; The information corresponding to the list head and the information corresponding to the list head are connected in series to form a key information chain, and key information of the current project is determined based on a preset list head key word library by utilizing the key information chain; determining current construction method information based on a preset construction method library; The first determining module is used for determining current quota information from a preset quota searching library based on the current project key information and the current construction method information; The second determining module is used for determining a current price setting scheme from a preset price setting scheme library based on the current quota information; the selection module is used for selecting a current project section from a preset project section library based on the current project key information; The first generation module is used for generating an original data table into which the cost software can be imported based on the current price combination scheme and the current project section.
  8. 8. An electronic device comprising a memory, a processor and a computer program stored on the memory and executable on the processor, characterized in that the processor implements the steps of the road construction cost formulation method according to any one of claims 1 to 6 when the program is executed by the processor.
  9. 9. A non-transitory computer readable storage medium having stored thereon a computer program, wherein the computer program when executed by a processor implements the steps of the road construction cost formulation method according to any one of claims 1 to 6.

Description

Highway engineering cost compiling method and device, electronic equipment and storage medium Technical Field The present invention relates to the field of construction technology for highway construction, and more particularly, to a construction method, apparatus, electronic device, and storage medium for highway construction. Background In recent years, the well blowout type of highway projects is increased, and the highway projects have the characteristics of large project quantity, long route, large number of structures, short construction period and the like. The current construction method of highway engineering project usually adopts a man-machine conversation mode, so that the efficiency is low, and the input human resources are large. For example, the co-looking engineering cost management software has an engineering quantity acquisition function, and a cost worker is required to manually set a rated price in the co-looking engineering cost management software, and the engineering quantity table is imported into the software, so that the cost worker fills the engineering quantity into a budget book, namely, the co-looking engineering cost management software requires the cost worker to manually establish the corresponding relation between the quantity table and the budget book. When the items in the quantity table need to be changed, the corresponding relation between the quantity table and the budget book needs to be re-established by the cost personnel, and the efficiency improvement and the application conditions are very limited. How to quickly and intelligently compile highway engineering cost is an important problem to be solved in the industry at present. Disclosure of Invention The invention provides a highway engineering cost programming method, a highway engineering cost programming device and electronic equipment, which are used for solving the defect that the prior art cannot quickly and intelligently program the engineering cost and realizing the quick and intelligent programming of the highway engineering cost. The invention provides a highway engineering cost programming method, which comprises the following steps: acquiring an engineering quantity table to be processed; acquiring information to be processed based on the engineering quantity table to be processed, wherein the information to be processed comprises current project key information and current construction method information; Determining current quota information from a preset quota retrieval library based on the current project key information and the current construction method information; Determining a current price setting scheme from a preset price setting scheme library based on the current quota information; Selecting a current project section from a preset project section library based on the current project key information; And generating an original data table capable of importing cost software based on the current price setting scheme and the current project section. Optionally, the information to be processed further includes current parameter information and/or a current measure list; the step of determining the current quota information from a preset quota search library based on the current project key information and the current construction method information comprises the following steps: Determining current quota information from a preset quota search library based on the current project key information, the current construction method information and the current parameter information, and/or, And determining current quota information from a preset quota retrieval library based on the current project key information, the current construction method information and the current measure list. Optionally, the preset price-setting scheme library comprises a quota engineering quantity extraction scheme and a sub-project price-setting scheme, wherein the preset price-setting scheme library comprises a corresponding relation between the sub-project price-setting scheme and the quota engineering quantity extraction scheme; The step of determining the current price setting scheme from a preset price setting scheme library based on the current quota information comprises the following steps: Determining a current sub project group price scheme based on the current quota information and a preset group price scheme library; Under the condition that the engineering quantity corresponding to the current sub engineering price-setting scheme does not meet the preset engineering quantity condition, determining a current quota engineering quantity extraction scheme based on the current sub engineering price-setting scheme and a preset price-setting scheme library; And determining a current price grouping scheme based on the current sub-project price grouping scheme and the current quota project quantity extraction scheme. Optionally, after the step of determining the current sub project group price scheme based on the c