CN-116244789-B - Coal preparation plant multi-specialized construction drawing entrusted resource lifting method and device

CN116244789BCN 116244789 BCN116244789 BCN 116244789BCN-116244789-B

Abstract

The disclosure relates to the technical field of building information model design, in particular to a multi-specialty construction drawing commission fund lifting method and device for a coal preparation plant. The multi-specialty construction drawing commission and fund drawing method for the coal preparation plant comprises the steps of obtaining a construction drawing commission design task, calling a fund drawing library to draw according to drawing standard configuration according to the construction drawing commission design task to obtain at least one type of specialized corresponding fund drawing file, and generating a target fund drawing corresponding to the construction drawing commission design task according to the at least one type of specialized corresponding fund drawing file if the at least one type of specialized corresponding fund drawing file meets the inspection condition. By adopting the method and the device, the fund-providing period can be shortened, the fund-providing efficiency can be improved, and the error rate can be reduced.

Inventors

  • Yao kaixuan
  • ZHANG ZHENBIN
  • LU JUN
  • Yin Pengxuan
  • Xu Hubiao
  • TAN XINGFU
  • XIAO MIN
  • XU SHENG
  • LI ZHIYONG
  • Yao Manxi
  • LI JIAN
  • LIU MIN
  • SUN RUIKE

Assignees

  • 中煤科工集团北京华宇工程有限公司

Dates

Publication Date
20260508
Application Date
20221220

Claims (8)

  1. 1. The method for entrusting and providing the investment for the multi-specialized construction drawing of the coal preparation plant is characterized by comprising the following steps of: Obtaining a construction drawing entrusted design task; according to the construction drawing entrusted design task, invoking an fund drawing library to draw referring to drawing standard configuration, and obtaining at least one specialized corresponding fund drawing file; If the at least one type of special resource file meets the checking condition, generating a target resource drawing corresponding to the construction drawing entrusted design task according to the at least one type of special resource file; When the construction drawing entrusting design task comprises a civil engineering main frame collaborative design task, a device professional lofting collaborative design task and a professional pipeline collaborative design task, according to the construction drawing entrusting design task, invoking an investment drawing library to draw referring to drawing standard configuration, and obtaining at least one investment drawing file corresponding to a professional, wherein the method comprises the following steps: Respectively calling a lifting gallery to refer to drawing standard configuration for drawing according to the civil engineering main frame collaborative design task, the equipment professional lofting collaborative design task and the professional pipeline collaborative design task to obtain a first lifting file corresponding to the civil engineering main frame collaborative design task, and a second lifting file corresponding to the equipment professional lofting collaborative design task and a third lifting file corresponding to the professional pipeline collaborative design task; Determining a fourth funding file according to the second funding file and the third funding file; according to the summarizing rule, summarizing the fourth fund-raising file by taking the floor as a unit to obtain a fifth fund-raising file; and generating a target fund drawing corresponding to the construction drawing entrusted design task according to the first fund file and the fifth fund file.
  2. 2. The method according to claim 1, wherein the step of calling the funding gallery to draw referring to the drawing standard configuration according to the construction drawing commission design task to obtain at least one specialized corresponding funding file further comprises: Determining the design authority corresponding to the construction drawing entrusted design task and at least one professional corresponding funding template; And calling a fund drawing library, and drawing according to the design authority and the fund drawing template corresponding to the at least one specialty to obtain the fund drawing file corresponding to the at least one specialty.
  3. 3. The method of claim 1, further comprising, after said obtaining at least one specialized corresponding funding file: Checking and marking the at least one professional corresponding fund file to obtain at least one checking report corresponding to the at least one professional corresponding fund file, wherein the checking report corresponds to the fund file one by one; And if any one of the at least one inspection report does not meet the inspection condition, issuing a file modification instruction, wherein the file modification instruction is used for indicating the modification of the funding file corresponding to the any one inspection report.
  4. 4. The method of claim 1, wherein generating the target funding drawing corresponding to the construction drawing commission design task according to the funding file corresponding to the at least one specialty comprises: generating an initial fund drawing corresponding to the construction drawing entrusted design task according to the fund file corresponding to the at least one specialty; if the initial funding drawing meets the funding condition, determining that the initial funding drawing is a target funding drawing corresponding to the construction drawing entrusted design task.
  5. 5. The method of claim 4, further comprising, after the generating the initial funding drawing corresponding to the work drawing commission design task according to the funding file corresponding to the at least one specialty: performing structure checking and collision checking on the initial funding drawing; And if the initial funding drawing does not meet the structure checking and collision checking conditions, sending a drawing modification instruction, wherein the drawing modification instruction is used for indicating the modification of the initial funding drawing.
  6. 6. The utility model provides a coal preparation factory multi-major construction drawing entrusts and carries resource device which characterized in that includes: The task acquisition unit is used for acquiring a construction drawing entrusted design task; the file drawing unit is used for entrusting a design task according to the construction drawing, calling a fund drawing library to draw referring to drawing standard configuration, and obtaining at least one specialized corresponding fund drawing file; The drawing generation unit is used for generating a target fund drawing corresponding to the construction drawing entrusted design task according to the fund file corresponding to the at least one specialty if the fund file corresponding to the at least one specialty meets the checking condition; When the construction drawing entrusting design task comprises a civil engineering main frame collaborative design task, a device professional lofting collaborative design task and a professional pipeline collaborative design task, according to the construction drawing entrusting design task, invoking an investment drawing library to draw referring to drawing standard configuration, and obtaining at least one investment drawing file corresponding to a professional, wherein the method comprises the following steps: Respectively calling a lifting gallery to refer to drawing standard configuration for drawing according to the civil engineering main frame collaborative design task, the equipment professional lofting collaborative design task and the professional pipeline collaborative design task to obtain a first lifting file corresponding to the civil engineering main frame collaborative design task, and a second lifting file corresponding to the equipment professional lofting collaborative design task and a third lifting file corresponding to the professional pipeline collaborative design task; Determining a fourth funding file according to the second funding file and the third funding file; according to the summarizing rule, summarizing the fourth fund-raising file by taking the floor as a unit to obtain a fifth fund-raising file; and generating a target fund drawing corresponding to the construction drawing entrusted design task according to the first fund file and the fifth fund file.
  7. 7. A terminal, comprising: At least one processor, and A memory communicatively coupled to the at least one processor, wherein, The memory stores instructions executable by the at least one processor to enable the at least one processor to perform the method of any one of claims 1-5.
  8. 8. A non-transitory computer readable storage medium storing computer instructions for causing the computer to perform the method of any one of claims 1-5.

Description

Coal preparation plant multi-specialized construction drawing entrusted resource lifting method and device Technical Field The disclosure relates to the technical field of building information model design, in particular to a multi-specialty construction drawing commission fund lifting method and device for a coal preparation plant. Background The engineering construction diagram design of coal preparation plants is mainly pipelined operation at present, and professional design contents have strong correlation and are required to mutually carry out the investment of construction diagram entrusted data. However, in the related coal-dressing plant construction drawing commission fund-raising process, after the design of the upstream professional is completed, the corresponding data commission can be submitted to the downstream professional, so that the fund-raising period is longer. Meanwhile, due to the fact that the investment-providing standards of all professions are not uniform, a large number of operations such as deleting, adjusting patterns, checking design proportions and the like are generated by downstream professions, the investment-providing efficiency is low, and the error rate is high. Disclosure of Invention The present disclosure provides a method and a device for entrusting and providing resources for multi-professional construction drawings of coal preparation plants, which mainly aims to shorten the resource providing period, improve the resource providing efficiency and reduce the error rate. According to one aspect of the disclosure, there is provided a coal preparation plant multi-specialty construction drawing commission fund raising method, including: Obtaining a construction drawing entrusted design task; according to the construction drawing entrusted design task, invoking an fund drawing library to draw referring to drawing standard configuration, and obtaining at least one specialized corresponding fund drawing file; and if the at least one type of the specialization corresponding fund drawing file meets the checking condition, generating a target fund drawing corresponding to the construction drawing entrusted design task according to the at least one type of the specialization corresponding fund drawing file. Optionally, according to the task of entrusting the construction drawing, invoking the funding gallery to draw referring to the drawing standard configuration to obtain at least one specialized corresponding funding file, including: Determining the design authority corresponding to the construction drawing entrusted design task and at least one professional corresponding funding template; And calling a fund drawing library, and drawing according to the design authority and the fund drawing template corresponding to the at least one specialty to obtain the fund drawing file corresponding to the at least one specialty. Optionally, the job drawing commission design task includes a civil engineering main frame collaborative design task, an equipment professional lofting collaborative design task, and a professional pipeline collaborative design task, and according to the job drawing commission design task, the resource drawing gallery is called to draw referring to drawing standard configuration to obtain at least one resource drawing file corresponding to a professional, including: Respectively calling a lifting gallery to refer to drawing standard configuration for drawing according to the civil engineering main frame collaborative design task, the equipment professional lofting collaborative design task and the professional pipeline collaborative design task to obtain a first lifting file corresponding to the civil engineering main frame collaborative design task, and a second lifting file corresponding to the equipment professional lofting collaborative design task and a third lifting file corresponding to the professional pipeline collaborative design task; and determining a fourth fund providing file according to the second fund providing file and the third fund providing file. Optionally, the generating, according to the at least one specially-corresponding fund drawing file, a fund drawing corresponding to the construction drawing entrusted design task includes: according to the summarizing rule, summarizing the fourth fund-raising file by taking the floor as a unit to obtain a fifth fund-raising file; and generating a target fund drawing corresponding to the construction drawing entrusted design task according to the first fund file and the fifth fund file. Optionally, after the obtaining at least one professional corresponding funding file, the method further includes: Checking and marking the at least one professional corresponding fund file to obtain at least one checking report corresponding to the at least one professional corresponding fund file, wherein the checking report corresponds to the fund file one by one; And if any one of the at least one inspection rep