CN-116905557-B - Assembled earthing brick wall structure and construction method thereof
Abstract
The application discloses an assembled earthing brick wall structure and a construction method thereof, wherein the assembled earthing brick wall structure comprises a main frame, a wall foundation, a wall body and a pressing roof, the wall body comprises a main wall body and a buffer supporting layer, the main frame comprises vertical beams arranged along the vertical direction and ring beams arranged along the horizontal direction, a plurality of vertical beams and ring beams are uniformly distributed on the inner side and the outer side of the main wall body and the thickness of the vertical beams is gradually increased from top to bottom along the vertical direction, and a large number of prefabricated members are adopted for construction of the assembled earthing brick wall structure. Compared with the existing tank wall or tank wall protection structure and construction method, the assembled earthing brick wall structure can better adapt to the changes of the internal earthing tank pressure and the external earthing layer pressure, improves the bearing capacity and the protection capacity, greatly improves the construction efficiency, shortens the construction period and ensures the construction quality, and in addition, adopts prefabricated members for construction, reduces the emission of pollutants in the process of field treatment of construction raw materials, and improves the environmental protection of the whole construction process.
Inventors
- CAO GUANG
- ZHANG CHENGHE
- SHI WEILONG
- GENG PENG
- Sang Zhongzhen
- DENG RONGRONG
- GONG JIE
- LI WENXIU
- SHI XIAOFANG
Assignees
- 山东京博装备制造安装有限公司
Dates
- Publication Date
- 20260508
- Application Date
- 20230605
Claims (8)
- 1. The assembled earthing brick wall structure is arranged on the outer side of an earthing tank and is characterized by comprising a wall foundation, a wall body and a pressing roof, wherein the wall body comprises a main wall body and a buffer supporting layer, and the buffer supporting layer is arranged on one side of the main wall body facing the earthing tank or on two sides of the main wall body; the main frame is connected with the wall foundation and comprises a vertical beam and a ring beam which are arranged along the vertical direction, wherein the vertical beam and the ring beam are respectively provided with a plurality of ring beams which are uniformly distributed on the inner side and the outer side of the main wall; the main wall body comprises a wall body frame and brick wall units, wherein the wall body frame is provided with a plurality of mounting grids, the brick wall units are fixedly mounted in the mounting grids, each brick wall unit comprises a prefabricated framework and brick bodies built on the prefabricated framework, the side parts of the prefabricated framework are provided with matched parts and locking parts which can be mutually adapted, the two brick wall units are connected through the matched fit joint between the matched parts and the locking parts, the prefabricated framework is also provided with first through pipes which are arranged in the vertical direction and/or the horizontal direction, the first through pipes in the two adjacent brick wall units are mutually communicated, the wall body frame is provided with first through holes corresponding to the first through pipes, and reinforcing steel bars can penetrate the first through holes and the first through pipes to connect the brick wall units which are arranged in the adjacent mounting grids; The vertical beam and the ring beam are provided with a first connecting part on one side facing the main wall body, a wall body frame and/or a brick wall unit are provided with a second connecting part which is adaptive to the first connecting part on one side facing the main frame, the brick wall unit further comprises a fastener which is respectively connected with the first connecting part and the second connecting part, and the first connecting part and the second connecting part are in locking connection through the fastener so that the main frame is fixedly connected with the main wall body.
- 2. The fabricated earthing brick wall structure of claim 1, wherein the wall frame, the vertical beams and the ring beams are all in reinforced concrete structure, the first connecting part and the second connecting part are all connecting holes, and the fastening piece is an expansion bolt matched with the connecting holes; Or the wall body frame, the vertical beams and the ring beams are all made of profile steel, the first connecting parts are first connecting plates protruding out of the surfaces of the vertical beams and the ring beams, the second connecting parts protrude out of the second connecting plates arranged on the surfaces of the wall body frame, the first connecting plates are arranged in parallel with the second connecting plates or the second connecting plates are arranged perpendicular to the second connecting plates, and the first connecting plates are fixedly welded with the second connecting plates or the first connecting plates are fixedly connected with the second connecting plates through bolts.
- 3. The fabricated earthing brick wall structure as set forth in claim 1, wherein the support member is made of elastic metal material, the buffer layer is made of non-metal material, and the buffer layer fills the gap between the main wall body and the earthing tank for absorbing and buffering the interaction force between the main wall body and/or the main frame and the earthing tank.
- 4. The fabricated earthing brick wall structure of claim 3, wherein the capping takes the shape of an arch, and comprises an arch body and a right angle connection part circumferentially arranged at the edge of the arch body, wherein the arch body comprises an arch frame and an arch unit arranged on the arch frame, the right angle connection part comprises a horizontal part and a vertical part, the horizontal part extends away from the arch body in the horizontal direction and has an extension distance not smaller than the horizontal thickness of the main frame, and the vertical part extends downwards in the vertical direction and is connected with one end of the horizontal part away from the arch body.
- 5. The fabricated earthing brick wall structure according to claim 4, wherein the horizontal part is arranged at the upper parts of the main frame and the wall body, the lower part of the horizontal part is provided with a connecting rod extending towards the main frame and the wall body, the extending direction of the connecting rod is deviated to the earthing tank relative to the vertical direction, and the main frame and/or the upper part of the wall body are/is provided with a first assembling hole corresponding to the connecting rod; The vertical part is provided with a second perforation penetrating through the vertical part along the horizontal direction, the side wall of the upper part of the main frame is provided with a second assembly hole corresponding to the second perforation, a fastening bolt penetrates through the second perforation and stretches into the second assembly hole so as to lock and fix the vertical part and the main frame, a filling space is reserved between one end, far away from the main frame, of the fastening bolt and the opening of the second perforation along the horizontal direction, and waterproof sealing materials are filled in the filling space.
- 6. The fabricated earthing brick wall structure of claim 5, wherein the arch frame comprises an arch base net and an arch steel frame arranged at the upper part of the arch base net; The arch crown unit is prefabricated members formed by prefabricating concrete and a steel reinforcement framework, and is fixedly connected to the arch steel frame, or the arch steel frame is provided with a pouring groove, and the arch crown unit is directly poured into the pouring groove by adopting concrete.
- 7. The fabricated earthing brick wall structure as set forth in claim 6, wherein the upper part of the coping is provided with a waterproof layer comprising anticorrosive paint coated on the upper surface of the coping and/or EPS plates provided on the upper part of the coping, and the EPS plates are adhered on the upper part of the coping.
- 8. A method of constructing an assembled earthing brick wall structure in accordance with any one of claims 1-7, comprising the steps of: s1, preparing materials, selecting prefabricated parts, metal profiles and structural members and the number and the size of the prefabricated parts according to the structure and the size of a soil covering tank, and conveying the prefabricated parts to a construction site, wherein the prefabricated parts comprise wall foundations, brick wall units and vault units, and the metal profiles comprise wall frames, vertical beams, ring beams, supporting pieces, arched steel frames, fasteners and other assembly accessories; S2, fixing a prefabricated wall foundation, digging a foundation trench on the foundation around the earthing tank according to the size of the wall foundation, hoisting the wall foundation after digging the foundation trench, inserting the wall foundation into the foundation trench, pouring concrete into the foundation trench, and fixing the wall foundation in the foundation trench; s3, constructing a single-layer main frame, firstly fixing a layer of ring beams on the inner side and the outer side of the upper part of a wall foundation, and then fixing a plurality of vertical beams matched with the layer of ring beams on the preset connection positions of the bottom layer of ring beams at uniform intervals along the circumferential direction; S4, constructing a single-layer main wall, arranging wall frames between the fixed main frames, installing brick wall units on the wall frames, and connecting the first connecting part and the second connecting part through bolt fasteners to fixedly connect the wall frames and the brick wall units on the main frames; S5, constructing a single-layer buffer supporting layer, connecting a supporting piece made of a constant elastic alloy material on one side of the fixed main frame facing the earthing tank, and filling fine sand between the fixed main wall body and the earthing tank to form the buffer layer; s6, building a new layer of main frame upwards on the basis of the lower layer of main frame along the vertical direction from bottom to top, and repeating the steps S4 and S5 until the heights of the main frame, the main wall body and the buffer supporting layer are flush with or higher than the height of the earthing tank; s7, installing a capping, namely after the step S6 is completed, firstly hoisting a bottom net and a prefabricated arch steel frame to the upper parts of the main frame, the main wall body and the buffer support layer at the uppermost layer, assembling and connecting the bottom net and the prefabricated arch steel frame through assembly accessories, and then pouring concrete into a pouring groove of the arch steel frame to form the capping; And S8, paving a waterproof layer, coating anti-corrosion paint on the upper surface of the coping after the step S7 is completed, and then bonding an EPS board on the upper part of the coping to enable the EPS board to cover the upper surface of the coping.
Description
Assembled earthing brick wall structure and construction method thereof Technical Field The invention belongs to the technical field of earthing tanks, and particularly relates to an assembled earthing brick wall structure and a construction method thereof. Background The storage tank is arranged in an underground shelter which consists of a protective wall and a top cover. The protective wall is prefabricated by bricks, stones and concrete or is formed by casting concrete in situ, and the storage tank in the form is commonly called a earthing tank or an earthing storage tank. Compared with a storage tank directly exposed to the external environment, the use of the earthing storage tank can reduce evaporation loss and delay deterioration of petrochemical products stored in the tank. Because the earthing storage tank has good tightness, and the top and the periphery are covered with soil with the thickness of not less than 0.5m, the indoor air temperature of the tank is stable, the influence of the atmospheric environment temperature is small, the breathing volatilization loss of the storage tank is reduced, and the deterioration of petrochemical products is delayed. The earthing tank has certain protection capacity for hiding effect on air, and is safe, and the earthing tank can hide the storage tank well through earthing and vegetation covering, so that the possibility of enemy detection and enemy detection is reduced. In addition, the storage tank chamber protection body has certain protection capability, not only can resist certain attack of enemies, but also can prevent open overflow after the storage tank fires and explodes, and lighten the influence degree on the adjacent storage tank. The construction process of the prior art earthing tank usually comprises the steps of firstly excavating a certain space downwards on a flat land or a hillside, constructing a storage tank, then constructing a tank room retaining wall, casting a protective body vault, and the like, assembling storage tank accessories, and finally carrying out earthing treatment. However, in the two ways of constructing the earthing tank in the prior art, a simple combined construction structure is adopted for the tank wall or the tank wall protection wall, and the construction way is also an on-site construction way, on one hand, the structure and the construction way are adopted, the cyclic processes of repeated construction, quality detection, quality acceptance and continuous construction are required in the construction process, the problems of different front and back construction quality and low construction efficiency are very easy to occur, various construction raw materials are piled on a construction site, the problem of complex management is easy to occur, in addition, pollution such as dust, waste water and waste residues is also caused when the construction raw materials are treated on the construction site, the environment protection is not facilitated, the simple combined construction structure is adopted, the bearing capacity of the tank wall or the tank wall protection wall in the horizontal direction is consistent and cannot be adjusted from top to bottom in the vertical direction, and the pressure of the earthing tank or the external earthing structure is gradually lifted from top to bottom in the vertical direction through actual technical monitoring, so that the existing tank wall or the tank wall protection wall is easy to have uneven stress or collapse under the pressure effect on the inner side and outer side. It follows that there are numerous drawbacks of the prior art that further improvements and enhancements are needed. Disclosure of Invention The invention provides an assembled earthing brick wall structure and a construction method thereof, which aim to solve at least one technical problem of the technical problems. The technical scheme adopted by the invention is as follows: The invention provides an assembled earthing brick wall structure which is arranged on the outer side of an earthing tank and comprises a wall foundation, a wall body and a pressing top, wherein the wall body comprises a main wall body and a buffer supporting layer, the buffer supporting layer is arranged on one side of the main wall body facing the earthing tank or on two sides of the main wall body, the assembled earthing brick wall structure further comprises a main frame used for arranging the main wall body, the main frame is connected with the wall foundation and comprises a plurality of vertical beams and ring beams, the vertical beams and the ring beams are arranged in the vertical direction, the ring beams are uniformly distributed on the inner side and the outer side of the main wall body, the buffer supporting layer comprises a buffer layer and a supporting piece, one end of the supporting piece is connected with the main frame and used for supporting the buffer layer, and the other end of the supporting piece is in contac