CN-117432200-B - Construction method and construction equipment for roof overhanging flyover structure decoration dual-purpose frame
Abstract
The application discloses a construction method and construction equipment for a dual-purpose frame for decoration of a roof overhanging flyplate structure, wherein a scaffold is erected on one side of a building construction position, and the top of the scaffold extends to the lower part of the construction position of a overhanging flyplate structure layer; and erecting a pouring template of the cantilever floating plate structure layer on the top of the scaffold, pouring the cantilever floating plate structure layer, providing supporting force for the construction of the cantilever floating plate structure layer by the scaffold, and finishing the decoration construction of the outer elevation of the building by using the scaffold. The scaffold has no damage to the building structure, omits the related repair work after the cantilever support frame is disassembled, does not occupy the indoor space of the building structure in the construction process, reduces the material leasing cost of I-steel, unloading steel wire ropes and the like, and avoids the material waste caused by electric welding to cut out round steel lantern rings after the scaffold is disassembled.
Inventors
- QIU JUNXIN
- LI YONGWEN
- ZHANG FUSEN
- LIU WENHUA
- ZHANG JIAHENG
- XIAO HUIFENG
- PENG YITING
- WEI ZHIQI
Assignees
- 广东省第四建筑工程有限公司
Dates
- Publication Date
- 20260505
- Application Date
- 20231014
Claims (2)
- 1. The construction method of the dual-purpose frame for the decoration of the roof overhanging flyer plate structure adopts the construction equipment of the dual-purpose frame for the decoration of the roof overhanging flyer plate structure, and is characterized by comprising the following steps: s1, building a scaffold (3) on one side of a building construction position, wherein the top of the scaffold (3) extends to the lower part of the construction position of the cantilever floating plate structure layer (2); S2, erecting a pouring template of the cantilever floating plate structure layer (2) on the top of the scaffold (3), and performing pouring construction of the cantilever floating plate structure layer (2), wherein the scaffold (3) provides supporting force for the construction of the cantilever floating plate structure layer (2); S3, finishing building outer elevation decoration construction by using the scaffold (3); In the step S2, before the construction of the roof overhanging flyer plate structure layer (2), the scaffold (3) is firstly modified, and horizontal rods (32) are additionally arranged among a plurality of vertical rods (31) positioned in the same horizontal row in the scaffold (3) so as to reduce the step pitch of the scaffold (3); In the S2, after the roof overhanging flyer plate structure layer (2) is constructed, all horizontal rods (32) are removed, and then the building structure outer elevation decoration construction is carried out; A connecting piece (33) is arranged between the adjacent horizontal rods (32); The construction equipment for the dual-purpose frame for the decoration of the roof overhanging flyer plate structure comprises a box body (4), wherein the box body (4) slides along the length direction of a horizontal rod (32), and the box body (4) is used for placing the dismantled horizontal rod (32); Pulley assemblies (5) are arranged on two sides of the box body (4), and the pulley assemblies (5) are used for being connected with a horizontal rod (32) in a sliding mode; The novel pulley assembly is characterized in that sliding blocks (54) are longitudinally and slidably connected to two sides of the box body (4), the sliding blocks (54) are in one-to-one correspondence with the pulley assemblies (5), the pulley assemblies (5) are rotatably connected to the sliding blocks (54), the rotation axes of the pulley assemblies (5) are vertically arranged, the pulley assemblies (5) comprise a plurality of pulley monomers (53), the pulley monomers (53) are circumferentially distributed on the rotation axes of the pulley assemblies (5), annular grooves (531) used for being clamped with horizontal rods (32) are formed in the peripheral walls of the pulley monomers (53), and elastic pieces (55) used for driving the pulley assemblies (5) to move towards the directions of the horizontal rods (32) are arranged on the box body (4), and the pulley assemblies (5) roll along the length directions of the horizontal rods (32).
- 2. The dual-purpose frame construction equipment for roof overhanging flyer structure decoration of claim 1, wherein the pulley assembly (5) further comprises a rotating shaft (51) and a cross rotating frame (52), the rotating shaft (51) is vertically arranged on a sliding block (54), the cross rotating frame (52) is rotationally connected with the rotating shaft (51), and four pulley monomers (53) are respectively rotationally connected with four end points of the cross rotating frame (52).
Description
Construction method and construction equipment for roof overhanging flyover structure decoration dual-purpose frame Technical Field The application relates to the field of building construction, in particular to a construction method and construction equipment for a dual-purpose frame for decoration of a roof overhanging flyover structure. Background The cantilever inclined flyer plate roof is a common building roof structural design, the building flyer plate has a plurality of structures, the supporting height is higher, and the formwork supporting construction is more complicated and difficult. The formwork support construction is realized by conventionally using a pre-buried round steel compression ring, erecting overhanging I-steel on an overhanging support frame, or adopting a reserved groove to add diagonal bracing rods and unloading steel wire ropes. The conventional overhanging I-steel is erected to construct a formwork support, the I-steel occupies large indoor space, the processes of secondary structure, decoration and the like in the later period are affected to perform cross construction, the later period repair quality of the reserved I-steel is difficult to guarantee, and after the frame is disassembled in construction, a round steel sleeve ring is required to be cut off by electric welding, so that material waste is caused. And add bracing ram + draw and hang wire rope construction, then need set up the scaffold frame outside add a row of pole setting as operation platform and protection railing, and need reserve bracing ram recess, add and unload reinforcing means such as wire rope draw and hang and add horizontal pull rod, construction steps are more loaded down with trivial details, therefore still have room for improvement. Disclosure of Invention The application provides a construction method and construction equipment for a dual-purpose frame for decorating a roof overhanging flyover structure, which aims to reduce the damage of a supporting system to a building structure, reduce the indoor occupied space of the building and reduce the construction cost. The application provides a construction method and construction equipment for a dual-purpose frame for decoration of a roof overhanging flyplate structure, which adopts the following technical scheme: a construction method of a dual-purpose frame for decoration of a roof overhanging flyplate structure comprises the following steps: S1, building a scaffold on one side of a building construction position, wherein the top of the scaffold extends to the lower part of the construction position of the cantilever floating plate structure layer; S2, erecting a pouring template of the cantilever floating plate structure layer on the top of the scaffold, and performing pouring construction of the cantilever floating plate structure layer, wherein the scaffold provides supporting force for the construction of the cantilever floating plate structure layer; and S3, finishing the building outer elevation decoration construction by using the scaffold. By adopting the technical scheme, the scaffold on the outer side of the building can be used as a supporting structure for construction of a roof cantilever floating plate structure layer, can be used as a construction platform for decoration and fitment construction of an outer elevation of the building structure, is basically free of damage to the building structure, can effectively prevent hidden quality hazards such as leakage of an outer wall, and omits related repair work after the cantilever support frame is disassembled, and omits a great amount of manual repair cavity cost. Preferably, in the step S2, before the construction of the cantilever plate structure layer of the roof, the scaffold is reformed, and horizontal rods are additionally arranged between a plurality of vertical rods positioned in the same horizontal row in the scaffold, so as to reduce the step pitch of the scaffold. The step distance of the scaffold is the distance between the upper horizontal transverse rod shaft line and the lower horizontal transverse rod shaft line, and the scaffold needs to serve as a supporting structure to provide supporting force for construction of the roof cantilever floating plate structure layer, so that the requirement on the structural strength of the scaffold is also improved. Preferably, in the step S2, after the deck structure layer of the overhanging deck structure of the roof is constructed, all the horizontal rods are removed, and then the building structure outer elevation decoration construction is performed. By adopting the technical scheme, the scaffold is restored to the decoration scaffold with the conventional step distance, so that the influence of the horizontal rod on the walking of constructors on the scaffold is reduced. Preferably, a connecting piece is arranged between the adjacent horizontal rods. Through adopting above-mentioned technical scheme to improve the connection ste