Search

CN-117468416-B - Flood prevention flood control dam diversion canal

CN117468416BCN 117468416 BCN117468416 BCN 117468416BCN-117468416-B

Abstract

The invention relates to the technical field of diversion channels, in particular to a flood prevention and flood prevention dam diversion channel, which comprises a dam, wherein a diversion channel is arranged on the dam, a hinging block is fixedly arranged at one end of the dam facing downstream, a supporting block is fixedly arranged at one end of the dam facing upstream, guide connecting rods are fixedly arranged at the lower ends of the supporting blocks, two supporting blocks are distributed on two sides of one diversion channel, hydraulic rods are hinged to two sides of the inside of the diversion channel, a gate is driven to rotate in the downstream direction under the action of the hydraulic rods to open the gate, at the moment, along with the rotation of the gate, a fork frame is driven to rotate, and a connecting cylinder on the fork frame is spliced in a smooth connecting frame on a garbage baffle plate along with the opening of the gate, so that the garbage baffle plate is driven to move downwards, the part provided with a water through hole is spliced in water, and upstream garbage is prevented from flowing to the downstream along with the water.

Inventors

  • WU LIRONG
  • LING LANG
  • YANG WENHUA
  • LIU ZHIYANG

Assignees

  • 福建省华舜水利水电工程有限公司

Dates

Publication Date
20260505
Application Date
20230320

Claims (4)

  1. 1. The utility model provides a flood control dam reposition of redundant personnel ditch, includes the dam, is provided with reposition of redundant personnel ditch on the dam, its characterized in that: the dam is fixedly provided with a hinging block at one end facing downstream, a supporting block is fixedly arranged at one end facing upstream on the dam, a guide connecting rod is fixedly arranged at the lower end of the supporting block, the two supporting blocks are in a group, the two supporting blocks are distributed at two sides of a diversion canal, hydraulic rods are hinged at two sides of the inside of the diversion canal, a gate is hinged at the other end of the hydraulic rods, the upper end of the gate is hinged on the hinging block, the gate is positioned at one end of the diversion canal at the downstream, a fork frame is fixedly arranged at the end face of the gate facing upstream, a connecting cylinder is symmetrically and fixedly arranged at two sides of the end face of the fork frame, an upstream garbage blocking and collecting mechanism is connected with an upstream garbage baffle plate, the upstream garbage baffle plate blocking and collecting mechanism comprises a garbage baffle plate, a rotary shaft, a water squeezing pressing plate, a reset spring and a spring protecting sleeve, two smooth connecting frames are symmetrically and fixedly arranged at the upper side of one end of the garbage baffle plate facing downstream, connecting cylinders are connected in the smooth connecting frames, the diameter of the connecting cylinders is equal to the inside of the smooth connecting frames, guide connecting holes are symmetrically arranged at two sides of the baffle plate, the guide connecting holes are symmetrically arranged at the two sides of the baffle plate, the end faces are positioned at one end face of the guide connecting holes, the guide connecting cylinders, the end faces are positioned at one end face of the guide connecting cylinders, the end faces are positioned at the two end faces and are matched with the two jack holes and are positioned at the downstream end faces, and are matched with the two jack holes, and are positioned at the downstream end faces, and are matched with the two jack plate holes and move and are positioned at the downstream end face plate and move side and are arranged at the downstream side and are arranged, the utility model provides a garbage collection box, including the baffle, the mounting hole has been seted up to the one end that keeps away from the baffle on the straight grillage, the grafting fly leaf is pegged graft in the removal jack, and the fixed restriction riser that is provided with in one end downside of grafting fly leaf, restriction riser is in one side of baffle upstream, the spacing hole has been seted up to the one end that is close to restriction riser on the grafting fly leaf, peg graft in the spacing hole and have spacing round bar, the fixed box that is provided with in lower extreme of restriction riser, the side opening of box contacts with the terminal surface of dustbin is concentrated to rubbish, the rubbish entry has been seted up to the terminal surface upside that two dustbin are relative, the inside bilateral symmetry of box has been seted up and has been moved the spout, and peg graft in the rubbish is concentrated the box in the rubbish and is gone up the promotion, the bilateral symmetry of rubbish push pedal is provided with spacing slider, spacing slider is pegged graft in moving the spout, the upper end of rubbish push pedal is fixedly provided with the connection long plate, it has the articulated plate to articulate on the long plate, the upper end of articulated plate articulates on the articulated slab, the both ends of rotation axis push-and-pull bearing has been cup jointed the bearing, bearing mounting is in the mounting hole, the rotation axis center position department has the impeller, the impeller fixed circular cylinder fixed cylinder, the rotation axis is provided with the fixed cylinder roller, the rotation end is fixed in the rotation of the cylinder, the cylinder is fixed.
  2. 2. The flood control flood dam diversion canal according to claim 1, wherein the garbage baffle is symmetrically and fixedly arranged on two sides of the upstream end face, the garbage can is positioned on the lower side of the matched jack, a movable round hole is formed in the upper end of the garbage can, a box door is movably arranged on the end face, far away from the garbage baffle, of the garbage can, a limiting baffle is fixedly arranged on the lower side of the opposite end faces of the two garbage cans, and a first water leakage hole is formed in the lower end face of the garbage can.
  3. 3. The flood control dam diversion canal according to claim 2, wherein the squeezing water pressure plate is inserted into the dustbin, a movable inserted rod is fixedly arranged at the upper end of the squeezing water pressure plate, a bending connecting rod is fixedly arranged at the upper end of the movable inserted rod, the bending connecting rod is inserted into the matched insertion hole, and the diameter of the bending connecting rod is larger than that of the movable inserted rod.
  4. 4. The flood control flood dam diversion canal according to claim 3, wherein one end of the bent connecting rod, which is far away from the squeezing pressure plate, is fixedly provided with a rectangular upright post, the rectangular upright post is positioned on one side of the garbage baffle, which faces downstream, the lower end of the rectangular upright post is fixedly provided with an L-shaped pressed plate, the movable inserted rod is sleeved with a reset spring, the spring protection sleeve is welded at the upper end of the garbage can, and the reset spring is positioned in the spring protection sleeve.

Description

Flood prevention flood control dam diversion canal Technical Field The invention relates to the technical field of diversion channels, in particular to a flood prevention and flood control dam diversion channel. Background The flood control dam is a dam built for preventing flood from overflowing and endangering life and property safety of people, the flood control dam is built as an important component of urban infrastructure construction, has an important role in guaranteeing development of urban economy, can meet basic requirements of flood control work, can play a role in resisting flood, relates to life and property safety of people, relates to stable development of urban economy, can improve uneven water resource distribution in an area, increases surface runoff, improves regional microclimate, has a certain elimination effect on the heat island effect of the city, and has the main functions of guaranteeing effective flood resistance in a flood period, guaranteeing important life and property safety and normal production life of downstream residents and has significance for regional economic development. The flood control dam is provided with the diversion canal, the diversion canal is a canal for diverting water, the current diversion canal is simpler in structure when the flood control dam is used for opening the gate and discharging water, and garbage accumulated at the upstream can flow to the downstream along with water flow to cause environmental pollution at the downstream once the flood control dam is closed. Disclosure of Invention The invention aims to provide a diversion canal of a flood control and flood control dam so as to solve the problems in the background technology. In order to achieve the above purpose, the present invention provides the following technical solutions: the utility model provides a flood control dam reposition of redundant personnel ditch, includes the dam, be provided with the reposition of redundant personnel ditch on the dam, the fixed articulated piece that is provided with towards the one end of low reaches on the dam, and the fixed supporting shoe that is provided with of one end towards the upper reaches on the dam, the fixed guide connecting rod that is provided with of lower extreme of supporting shoe, and two supporting shoes are a set of, distribute in the both sides of reposition of redundant personnel ditch, the inside both sides of reposition of redundant personnel ditch are articulated to have the hydraulic stem, the other end of hydraulic stem articulates there is the gate, the upper end of gate articulates on the articulated piece, and the gate is in the one end of reposition of redundant personnel ditch low reaches, the fixed fork frame that is provided with on the terminal surface of gate orientation upper reaches, the fixed connection cylinder that is provided with of tip bilateral symmetry of fork frame, and fork frame is connected with upstream rubbish and blocks collection mechanism. Preferably, the upstream garbage blocking and collecting mechanism comprises a garbage baffle plate, an inserting movable plate, a rotating shaft, a squeezing pressing plate, a reset spring and a spring protection sleeve, wherein two smooth connecting frames are symmetrically and fixedly arranged at the upper side of one end of the garbage baffle plate, which faces downstream, connecting cylinders are inserted in the smooth connecting frames, and the diameter of each connecting cylinder is equal to the inner height of each smooth connecting frame. Preferably, the both sides symmetry of rubbish baffle has seted up the direction connecting hole, it has the direction connecting rod to peg graft in the direction connecting hole, two remove jacks have been seted up to the symmetry on the terminal surface of rubbish baffle, the welding has spacing round bar in the removal jack, and has seted up the cooperation jack on the rubbish baffle of removal jack one side, and two remove jacks are in between two cooperation jacks. Preferably, the garbage baffle is provided with the dustbin towards the two symmetrical sides of the upstream end face, the dustbin is positioned at the lower side of the matched jack, the upper end of the dustbin is provided with a movable round hole, the end face, far away from the garbage baffle, of the dustbin is movably provided with a box door, the upper sides of the two opposite end faces of the dustbin are provided with garbage inlets, the lower side of the end face is fixedly provided with a limiting baffle, and the lower end face of the dustbin is provided with a first water leakage hole. Preferably, the end face of the garbage baffle facing the upstream is fixedly provided with a hinged plate, the hinged plate is positioned between the two movable jacks, the lower end of the garbage baffle is provided with a water through hole, the water through hole is positioned at the lower side of the garbage can, the end face of the garbage baffle facing t