CN-117552551-B - Assembled building shear wall assembly connection structure

CN117552551BCN 117552551 BCN117552551 BCN 117552551BCN-117552551-B

Abstract

The invention relates to an assembled building shear wall assembly connection structure, wherein a plurality of embedded bars are arranged in a floor slab, a plurality of pouring grooves corresponding to the embedded bars are arranged at the bottom of a prefabricated shear wall, the pouring grooves are opened at the bottom of the prefabricated shear wall, communication grooves are formed in the upper parts of the pouring grooves, operation grooves are formed in the upper parts of the communication grooves, the operation grooves are opened at the side surfaces of the prefabricated shear wall, the communication grooves are arranged between the operation grooves and the pouring grooves so as to be vertically communicated, an extension screw rod is arranged in the pouring grooves, a limit nut is arranged at the upper part of the extension screw rod, the extension screw rod comprises a steel bar sleeve joint connected with the embedded bars, a screw rod piece is integrally connected to the upper part of the steel bar sleeve joint, the limit nut comprises an inner threaded sleeve, an outer hexagonal end is arranged at the top of the inner threaded sleeve, a limit flange is arranged at the bottom of the inner threaded sleeve, and the outer hexagonal end, the inner threaded sleeve and the limit flange are vertically communicated.

Inventors

  • LIAO SHIWAN
  • ZHANG SHUAI
  • LIN RENXING
  • HUANG XINXIAO

Assignees

  • 中建海峡建设发展有限公司
  • 中建海峡(厦门)建设发展有限公司

Dates

Publication Date
20260508
Application Date
20231221

Claims (6)

  1. 1. The assembled building shear wall assembled connection structure comprises a floor slab (1) and a precast shear wall (2) vertically arranged on the upper portion of the floor slab (1), and is characterized in that a plurality of embedded bars (11) are arranged inside the floor slab (1), the top ends of the embedded bars (11) penetrate out of the top surface of the floor slab (1), a plurality of pouring grooves (5) corresponding to the embedded bars (11) in position are arranged at the bottom of the precast shear wall (2), the pouring grooves (5) are opened at the bottom of the precast shear wall (2), a communication groove (4) is arranged at the upper portion of the pouring grooves (5), an operation groove (3) is arranged at the side surface of the precast shear wall (2), the operation groove (3) is opened at the side surface of the precast shear wall (2), the communication groove (4) is arranged between the operation groove (3) and the pouring grooves (5) so as to enable the top and bottom to be communicated, an extension screw (6) is arranged in the pouring groove (5), a limit nut (7) is arranged at the upper portion of the extension screw (6), the extension screw (6) is arranged at the lower portion of the precast shear wall, the lower portion, the limit nut (7) is provided with a limit nut (72) and comprises a sleeve (61), the top of internal thread sleeve pipe (72) is provided with outer hexagonal end (71), and the bottom of internal thread sleeve pipe (72) is provided with spacing flange (73), and outer hexagonal end (71), internal thread sleeve pipe (72) and spacing flange (73) link up from top to bottom, and internal thread sleeve pipe (72) and screw rod piece (62) threaded connection.
  2. 2. The assembled building shear wall assembly connection structure of claim 1, wherein the embedded bars (11) are uniformly distributed in the area corresponding to the prefabricated shear wall (2) on the floor slab (1), and the embedded bars (11) are connected with the top surface of the floor slab (1) in a vertical structure.
  3. 3. The assembled shear wall assembly connection structure for the fabricated building is characterized in that a steel bar sleeve joint (61) is sleeved at the top end of the embedded steel bar (11), and the steel bar sleeve joint (61) is welded with the embedded steel bar (11) downwards.
  4. 4. The assembled connecting structure of the fabricated building shear wall is characterized in that the cross section of the communicating groove (4) is smaller than that of the pouring groove (5), and the communicating groove (4) and the pouring groove (5) form a step-shaped groove structure together.
  5. 5. The assembled building shear wall assembly connection structure according to claim 1, wherein the outer diameter of the internally threaded sleeve (72) of the limit nut (7) is smaller than the inner diameter of the communicating groove (4).
  6. 6. The assembled shear wall assembly connection structure of claim 1, wherein the edge ring row of the limiting flange (73) is provided with a plurality of openings which are concrete channels (74).

Description

Assembled building shear wall assembly connection structure Technical Field The invention relates to an assembled building shear wall assembly connection structure, which is applied to the technical field of assembled shear wall assembly. Background As is known, prefabricated building is mainly referred to as a building formed by directly transporting prefabricated building elements to a construction site of a project and through a specific element connection mode, and compared with a traditional building, the connection mode of the building and the stability of the building have strict requirements. Compared with the cast-in-situ construction method, the assembly structure is beneficial to green construction, because the assembly construction can better meet the requirements of land saving, energy saving, material saving, water saving, environmental protection and the like of the green construction, reduces the negative influence on the environment, including noise reduction, dust emission prevention, environmental pollution reduction, clean transportation, site interference reduction, water saving, electricity, material and other resources and energy sources, and follows the principle of sustainable development. Because its bottom surface can not guarantee completely when prefabricated shear force wall is prefabricated to be leveled, the top surface of floor simultaneously probably has the burr pothole equally, need carry out vertical positioning and fixed connection through certain connection structure with the floor that has installed when prefabricated shear force wall is installed, and current operation mode is through the adjustment of wall position and straightness that hangs down is carried out to crane hoist and mount shear force wall and by means of instrument such as simple and easy crowbar of manual operation, and not only the operation degree of difficulty is big, and the efficiency of construction is low moreover. The application patent with the publication number of CN106760052A discloses a horizontal seam type steel welding connection device for an assembled prefabricated shear wall, and particularly discloses a horizontal seam type steel welding connection device which mainly comprises an upper connecting steel bar, a lower connecting steel bar, an upper steel bar, a lower steel bar, an upper connecting steel plate and a lower connecting steel plate, wherein the connection of the steel bars and the connecting steel bars and the manufacture of the prefabricated shear wall are all manufactured in factories in advance, and the assembly of the upper and lower prefabricated shear walls can be completed by only hoisting and splicing the upper and lower prefabricated shear walls on site and temporarily fixing the upper and lower steel bars. And after the field welding is finished, the prefabricated shear wall can be assembled upwards continuously. However, on the one hand, the above solution is complicated in structure and inconvenient to operate, and on the other hand, the above solution does not solve the technical problem proposed by the present application. Disclosure of Invention In order to solve the technical problems, the invention provides an assembled connecting structure for a shear wall of an assembled building, which solves the problems of high position and perpendicularity adjusting operation difficulty and low construction efficiency of the traditional prefabricated shear wall, and can ensure that concrete pouring completely fills a cavity in the shear wall so as to ensure the finishing quality of the prefabricated shear wall. The technical scheme of the invention is as follows: the assembled building shear wall assembly connection structure comprises a floor slab and a precast shear wall vertically arranged on the upper portion of the floor slab, wherein a plurality of embedded bars are arranged in the floor slab, the top ends of the embedded bars penetrate out of the top surface of the floor slab, a plurality of pouring grooves corresponding to the embedded bars are arranged at the bottom of the precast shear wall, the pouring grooves are formed in the bottom of the precast shear wall and are provided with communication grooves, an operation groove is arranged on the upper portion of each communication groove, the operation groove is formed in the side surface side of the precast shear wall and is open, the communication grooves are arranged between the operation groove and the pouring grooves so as to be vertically communicated, an extension screw is arranged in each pouring groove, a limit nut is arranged on the upper portion of each extension screw, each extension screw comprises a steel bar sleeve joint connected with the embedded bars, the upper portion of each steel bar sleeve joint is integrally connected with a screw member, each limit nut comprises an inner threaded sleeve, the top of each inner threaded sleeve is provided with an outer hexagonal end, each inner threaded