Abstract
The invention relates to a construction method for combining a river channel crossing a site with a permanent drainage pipeline, firstly, adopting earthwork slope excavation to measure the trend and the slope of the river channel crossing the site, paying off and positioning; secondly, adopting a concrete box culvert structure with a transverse cross section in a shape like a Chinese character 'pin', along with river construction, adding a secondary recovery pool structure at water points in the field to meet the water demand in the field, and finally backfilling and compacting earthwork and hardening the pavement after the construction of the structure is finished. The cross section of the invention can be backfilled and hardened after the construction of the transverse cross section 'V' -shaped concrete box culvert structure is completed, thereby improving the river crossing commute efficiency and reducing the risk of personnel falling into the river.
Inventors
- WANG SHENSONG
- WANG ZHENXING
- LI CHAO
- LI ZHENGPENG
- Liang Gaojiong
- GAO GUOMING
Assignees
- 上海宝冶集团有限公司
Dates
- Publication Date
- 20260508
- Application Date
- 20240828
Claims (3)
- 1. A construction method for combining a river channel crossing a site and a permanent drainage pipeline is characterized by firstly adopting earthwork slope excavation to measure the trend and the gradient of the river channel to carry out line setting and positioning, secondly adopting a transverse cross section 'V' -shaped concrete box culvert structure to carry out river construction, then adding a secondary recovery pool structure at water points in the site to meet the water requirement in the site, and finally carrying out earthwork backfill compaction and pavement hardening treatment after the structure construction is finished; The integral rainwater and sewage combined diversion is solved through a concrete box culvert with a transverse cross section in a shape like a Chinese character 'pin', one side is provided with a special river water circulating channel, the other side is divided into 2 layers, the upper part is provided with a rainwater drainage channel, and the lower part is provided with a sewage drainage channel; the upper rainwater channel is led in and discharged through a rainwater pipeline in one side field, and an overflow port is arranged at the other side of the rainwater channel, so that when the amount of rainwater in the field is overlarge, the rainwater overflows to the river channel to be discharged, and the drainage effect is effectively enhanced; The secondary recovery tank is arranged at the side of the transverse 'V' -shaped concrete box culvert, and the water for greening and car washing in the rainwater recovery and river secondary water supplementing supply field is utilized.
- 2. The construction method combining a river channel crossing a site and a permanent drainage pipeline according to claim 1, wherein the inverted V-shaped concrete box culvert is prefabricated or cast-in-situ, impervious concrete is adopted, and an anti-leakage measure is adopted at a joint part during the construction of the prefabricated concrete.
- 3. The construction method combining river channels and permanent drainage pipelines across a site according to claim 1, wherein the construction method is characterized in that after the construction of a concrete box culvert structure of a concrete structure is completed, earthwork is backfilled and compacted, and top hardening treatment is carried out.
Description
Construction method for combining river channels and permanent drainage pipelines in crossing site Technical Field The invention relates to the field of in-site drainage construction, in particular to a construction method for combining a river channel and a permanent drainage pipeline in a crossing site. Background Aiming at the construction intersection of a transverse river in a field and a rainwater and sewage drainage pipeline in the field, the problems of rainwater, sewage and river water diversion and secondary recycling of partial water resources are solved at one time without a corresponding construction method, and water resource waste and pollution are easy to occur. Therefore, a construction method for solving the problem of combining and utilizing the river crossing in the field with the drainage pipeline in the field is worthy of research. Disclosure of Invention The invention aims to overcome the defects of the prior art, and provides a construction method for combining a river crossing field with a permanent drainage pipeline, which solves the problem of crossing field river and field rain sewage pipeline cross construction, and solves the problem of field rain sewage cross diversion and partial water resource recycling. In order to solve the technical problems, the invention is realized as follows: A construction method combining a river channel crossing a site and a permanent drainage pipeline is characterized in that firstly, an earthwork slope is excavated to measure the trend and the gradient of the river channel, paying off and positioning are carried out, secondly, a concrete box culvert structure with a transverse cross section in a shape like a Chinese character 'pin' is adopted to carry out river-following construction, then a secondary recovery pool structure is additionally arranged at a water point in the site to meet the water requirement in the site, and finally, after the construction of the structure is completed, earthwork is backfilled and compacted, and the pavement is hardened. The construction method for combining river channels and permanent drainage pipelines in a crossing site is characterized in that the integral rainwater and sewage combined diversion is realized through a transverse cross section 'V' -shaped concrete box culvert, one side is provided with a special river water circulating channel, the other side is divided into 2 layers, the upper part is provided with a rainwater drainage channel, and the lower part is provided with a sewage drainage channel. The construction method combining the river channel crossing the site with the permanent drainage pipeline is characterized in that the rainwater channel at the upper part is converged and discharged through the rainwater pipeline in the site at one side, the overflow port is arranged at the other side of the rainwater channel, and when the amount of rainwater in the site is overlarge, the rainwater can overflow to the river channel through the overflow port to be discharged, so that the drainage effect can be effectively enhanced. The construction method combining the river course and the permanent drainage pipeline across the site is characterized in that a secondary recovery tank can be arranged at the side of a transverse inverted V-shaped concrete box culvert, and water for greening and car washing in a rainwater recovery and river course secondary water supplementing supply site is utilized. The construction method combining the river channels and the permanent drainage pipelines across the site is characterized in that the inverted-V-shaped concrete box culvert can be prefabricated or cast-in-situ, impervious concrete is adopted, and an anti-leakage measure is adopted at the joint part during the construction of the prefabricated concrete. The construction method combining river channels and permanent drainage pipelines in a crossing site is characterized by comprising the steps of backfilling and compacting earthwork and hardening the top after the construction of a concrete box culvert structure of a concrete structure is completed. The construction method has the beneficial effects that the construction method for combining the river channel and the permanent drainage pipeline in the crossing site is provided by the technical scheme, the transverse cross-section cross-shaped concrete box culvert is simple in structure and high in bearing capacity, the construction process is mature, rainwater, sewage and river water are effectively split, part of water resources are recycled, backfilling hardening treatment can be performed after the construction of the transverse cross-section cross-shaped concrete box culvert structure is completed, the river crossing commute efficiency is improved, and the river falling risk of personnel is reduced. Drawings The invention is described in further detail below with reference to the attached drawings and embodiments: FIG. 1 is a cross-section transverse "delta" box