Search

CN-121738350-B - Hanging basket platform for building curtain wall construction

CN121738350BCN 121738350 BCN121738350 BCN 121738350BCN-121738350-B

Abstract

The application relates to the technical field of hanging basket platforms for building curtain wall construction, and discloses a hanging basket platform for building curtain wall construction, which comprises a lifting basket and a sliding rail, wherein the lifting basket and the sliding rail are arranged on one side of the lifting basket, which faces a building, the sliding rail is connected with a movable portal in a sliding manner, the movable portal is connected with a sliding table in a sliding manner, a driving piece is arranged between the movable portal and the sliding table, the driving piece drives the sliding table to move up and down, the sliding table is pivoted with a connecting table through an inclined strut piece, a second telescopic rod is arranged between the sliding table and the connecting table, the second telescopic rod can stretch out and draw back and adjust the angle of the inclined strut piece, and the connecting table is detachably connected with a sucker assembly capable of sucking the curtain wall. This basket platform for building curtain construction replaces the manpower through the removal of bracing piece, slip table to realize the accurate space location of curtain to utilize the initiative control technique based on pressure feedback, make the system can last exerting stable tight force to the curtain when the hanging flower basket rocks, thereby realized mechanization, the accurate and intrinsically safe of curtain installation.

Inventors

  • ZHENG LI
  • WANG YUQIANG
  • CHEN FENGLONG
  • WANG JING
  • QI XINGSHENG
  • ZHENG XIAODONG
  • DONG WENHUAN
  • ZHENG LI
  • LIU SHAOHAN
  • LI CHENBIN
  • LEI YONGPING
  • YE JIANFEI
  • CHEN QI

Assignees

  • 福建建工集团有限责任公司

Dates

Publication Date
20260505
Application Date
20260228

Claims (8)

  1. 1. The utility model provides a hanging flower basket platform for building curtain construction, includes lift basket (1) that can go up and down, its characterized in that still includes slide rail (2), it is located lift basket (1) one side towards the building, slide rail (2) sliding connection has movable mast (3), movable mast (3) sliding connection has slip table (4), is equipped with driving piece (9) between movable mast (3) and slip table (4), and driving piece (9) drive slip table (4) reciprocates, slip table (4) have connecting table (7) through diagonal member (5) pin joint, are equipped with second telescopic link (6) between slip table (4) and connecting table (7), and second telescopic link (6) can stretch out and draw back and adjust diagonal member (5) angle, and connecting table (7) detachable are connected with sucking disc subassembly (8) that can hold curtain (10).
  2. 2. A hanging basket platform for building curtain wall construction according to claim 1, characterized in that the diagonal bracing piece (5) consists of four groups of diagonal bracing rods, the four groups of diagonal bracing rods form a quadrangular prism, the diagonal bracing rods on the same side form a parallelogram, and the end part of the diagonal bracing piece (5) is hinged with the connecting table (7).
  3. 3. A hanging basket platform for construction of building curtain wall according to claim 2, characterized in that the connecting table (7) comprises a vertical plate (701) and a locking member (703), the vertical plate (701) is connected with the diagonal bracing member (5) and the second telescopic rod (6), the locking member (703) is used for fixing the sucking disc assembly (8), an elastic pad (704) is arranged between the locking member (703) and the connecting arm (702), and the sucking disc assembly (8) on the locking member (703) and the curtain wall (10) are inclined by the elastic pad (704).
  4. 4. A hanging basket platform for building curtain wall construction according to claim 3, characterized in that the vertical plate (701) is connected with the locking member (703) by a connecting arm (702), and the connecting arm (702) can rotate around the upper end of the vertical plate (701).
  5. 5. The hanging basket platform for building curtain wall construction according to claim 4, wherein the locking piece (703) is a v-shaped groove, the sucker assembly (8) comprises a sucker substrate (801), a clamping block (802) is arranged at the lower part of the sucker substrate (801), the clamping block (802) can be inserted into the elastic pad (704), an L-shaped stop block (803) is arranged above the sucker substrate (801), a locking block (706) is arranged above the vertical plate (701), and the locking block (706) can be rotated to clamp or release the L-shaped stop block (803).
  6. 6. A hanging basket platform for building curtain wall construction according to claim 3, characterized in that the second telescopic rod (6) comprises a piston rod (601), the piston rod (601) is movably connected with an adjusting rod (602), an adjusting spring (603) is arranged between the adjusting rod (602) and the piston rod (601), and the adjusting spring (603) enables the adjusting rod (602) to tend to be in a retracted state, and then pressure is applied to the diagonal bracing piece (5).
  7. 7. The hanging basket platform for building curtain wall construction according to claim 6, wherein the adjusting spring (603) is provided with a pressure sensor (604), and after the curtain wall (10) is pushed in place, the sliding table (4) or the second telescopic rod (6) is adjusted, so that the elastic force of the adjusting spring (603) monitored by the pressure sensor (604) is within a set range.
  8. 8. The hanging basket platform for building curtain wall construction according to claim 7, further comprising a controller, wherein the controller has an automatic control mode, and when the automatic control mode is entered, the controller adjusts the position of the sliding table (4) so that the elastic force of the adjusting spring (603) monitored by the pressure sensor (604) is within a set range.

Description

Hanging basket platform for building curtain wall construction Technical Field The application relates to the technical field of building curtain wall construction, in particular to a hanging basket platform for building curtain wall construction. Background In the curtain wall engineering construction field, hanging basket equipment has become a mainstream operation carrier for current high-altitude curtain wall installation due to high construction efficiency, strong displacement flexibility, complete safety protection device and good adaptability to complex building forms. The high-altitude lifting device has the core advantages that the high-altitude lifting device can be quickly lifted to the appointed construction height, the high-altitude transportation of curtain wall components is completed by matching with lifting equipment, workers manually adjust the position of the curtain wall through the hanging basket platform and complete the working procedures of clamping the mounting frame, fastening bolts, assembling the baffle and the like, and the safety and the construction quality of high-altitude operation are effectively guaranteed. However, in the actual curtain wall installation process of the existing hanging basket, two types of obvious technical defects and potential safety hazards still exist, so that construction efficiency, cost control and operation safety are difficult to consider, and the specific problems are as follows: 1. labor cost and operation efficiency defect of large curtain wall construction When the monolithic curtain wall member is large in size, its weight typically exceeds the manual stability handling threshold. Under such working conditions, workers on the hanging basket platform are difficult to accurately adjust the attitude and the installation position of the curtain wall only by means of self force, and the workers are required to rely on the cooperative operation of auxiliary personnel in the building, namely, the internal personnel are cooperatively positioned through an indoor working face, and the external hanging basket personnel are synchronously adjusted to form an internal and external linkage manpower configuration mode. The mode not only needs more than double manpower, greatly increases construction cost, but also is easy to cause installation accuracy deviation due to unsynchronized internal and external operation rhythms, and further prolongs construction period. 2. Illegal operation risk and potential safety hazard for small curtain wall construction Aiming at the curtain wall component with smaller single block size and higher than half a person, the defect of operation convenience of the existing hanging basket is more remarkable: The cause of illegal operation is remarkable, namely after the small curtain wall is clamped into the mounting frame, fastening structures (such as bolts and baffles) with different heights are required to be assembled. The operation flow is relatively complicated, and the worker is out of order for "lazy" demand, often breaks down and stands on the hanging flower basket railing in order to promote the operation height, and not adjusts hanging flower basket platform height according to the standard. The behavior directly breaks through the safety protection design of the hanging basket, and personnel falling accidents are extremely easy to cause. Safety risk under sudden working conditions is that the unfinished small curtain wall is limited by a special positioning device according to construction specifications, but in actual operation, workers save time and generally maintain stable components in a 'hand curtain wall' mode. When encountering sudden gusts, the hanging basket platform is easy to transversely shake, and workers holding the curtain wall are difficult to resist shaking impact force, so that curtain wall components can be possibly damaged in a falling manner, high-altitude falling is more likely to be caused due to unbalance of bodies, and extremely high potential safety hazards exist. Disclosure of Invention The application provides a hanging basket platform for building curtain wall construction, which realizes accurate space positioning of a curtain wall by moving diagonal bracing pieces and sliding tables instead of manpower, and enables a system to continuously apply stable propping force to the curtain wall when the hanging basket shakes by utilizing an active control technology based on pressure feedback, thereby realizing mechanization, accuracy and intrinsic safety of curtain wall installation. The hanging basket platform for building curtain wall construction comprises a lifting basket capable of lifting and a sliding rail, wherein the sliding rail is arranged on one side, facing a building, of the lifting basket, a movable door frame is connected to the sliding rail in a sliding mode, a sliding table is connected to the movable door frame in a sliding mode, a driving piece is arranged between the mov