CN-121974225-A - Lifting platform for building construction
Abstract
The invention belongs to the technical field of building construction equipment, and particularly provides a building construction lifting platform which comprises a supporting component, a hanging cage and a traveling component, wherein the supporting component is used for fixing a guide rail frame on the outer wall of a building through a wall-attached support, and the traveling component drives the hanging cage to move along the guide rail frame. In order to adapt to the inclined building outer wall, the upright post of the suspension cage is hinged with the upper frame body and the lower frame body, and is connected between the upper frame body and the lower frame body through the telescopic connecting rod unit, the first side surface of the suspension cage is a deformable parallelogram, and the inclination angle of the second side surface can be adjusted adaptively, so that the suspension cage is adapted to the building outer wall, and the second side surface for people to enter and exit is ensured to be parallel to the building outer wall. After the adjustment is completed, the relative positions of the upper frame body and the lower frame body are locked through the connecting rod unit, so that the suspension cage forms a stable rigid frame structure. The invention can flexibly adjust the inclination angle of the second side surface according to the requirement, and is beneficial to repeated use and saves cost compared with the conventional customized production.
Inventors
- TIAN JIANFEI
- WANG YIDONG
- Fan Cunren
- ZHANG LEI
- LIANG JIANYUN
- ZHANG YABING
- WANG FUXING
- ZHANG SHUOKAI
- LIU WEIRAN
Assignees
- 中铁三局集团有限公司
- 中铁(雄安)城市建设发展有限公司
- 中铁三局集团第二工程有限公司
Dates
- Publication Date
- 20260505
- Application Date
- 20260403
Claims (10)
- 1. A building construction lift platform, comprising: The support assembly (10) comprises a guide rail frame (11) and a wall-attached support (12), wherein the guide rail frame (11) is arranged parallel to the outer wall of a building, and the wall-attached support (12) is connected between the outer wall of the building and the guide rail frame (11); The lifting cage (20) comprises a lower frame body (21), an upper frame body (22), at least four upright posts (23) and a connecting rod unit (24), wherein the upper frame body (22) and the lower frame body (21) are of a square frame structure which is horizontally arranged, at least four upright posts (23) are connected to the corner positions of the upper frame body (22) and the lower frame body (21) in a one-to-one correspondence manner, the top of each upright post (23) is hinged with the upper frame body (22), the bottom of each upright post is hinged with the lower frame body (21), the hinging shafts of a plurality of upright posts (23) are parallel to each other, the connecting rod unit (24) is connected between the upper frame body (22) and the lower frame body (21) in a telescopic manner, two side faces which are perpendicular to the hinging axis of each upright post (23) are defined to be first side faces, two side faces which are parallel to the hinging axis of each upright post (23) are defined to be second side faces, and The traveling assembly (30) is arranged on the first side surface of the suspension cage (20) and used for driving the suspension cage (20) to move along the guide rail frame (11).
- 2. The building construction lift platform of claim 1, wherein the support assembly (10) further comprises: A fixed seat (13) with an arc-shaped track, the bottom of the guide rail frame (11) is in sliding fit with the track, and And the hydraulic oil cylinder is arranged on the fixed seat (13) and used for driving the guide rail frame (11) to slide along the track.
- 3. The lifting platform for building construction according to claim 1, wherein a first chute (211) is formed in a side length direction of a frame forming the first side surface at the top of the lower frame body (21), and the link unit (24) comprises: the sleeve (241) is arranged on the first side surface of the suspension cage (20), the top of the sleeve (241) is connected with the frame of the first side surface formed by the upper frame body (22), and the bottom of the sleeve extends downwards; A slide bar (242), the top of which is in sliding fit with the sleeve (241), and the bottom of which is in sliding fit with the first sliding groove (211); a first locking member detachably connected between the sleeve (241) and the slide bar (242), and And the second locking piece (243) is detachably connected between the bottom of the sliding rod (242) and the lower frame body (21).
- 4. A building construction lifting platform according to claim 3, wherein a plurality of sleeves (241) and sliding rods (242) extend along the side length direction of the first side surface respectively, a first screen (25) is arranged between adjacent sleeves (241), a second screen (26) is arranged between adjacent sliding rods (242), a second sliding groove is formed in the bottom of the first screen (25), and the top of the second screen (26) is slidingly arranged in the second sliding groove.
- 5. The building construction lifting platform according to claim 1, wherein the guide rail frame (11) is provided with a rack (111) along the length direction thereof, one side of the lower frame body (21) adjacent to the walking assembly (30) is provided with a first rotating shaft (212), one side of the upper frame body (22) adjacent to the walking assembly (30) is provided with a second rotating shaft (221), and the central connecting line of the first rotating shaft (212) and the second rotating shaft (221) is parallel to the upright post (23), and the walking assembly (30) comprises: a support plate (31) hinged to the first rotation shaft (212) and the second rotation shaft (221) and slidably engaged with the guide rail frame (11), and And the driving motor (32) is arranged on the supporting plate (31), and the output shaft of the driving motor (32) is connected with a gear which is meshed with the rack (111).
- 6. The building construction lift platform of claim 1, further comprising a counterweight assembly (40), the counterweight assembly (40) comprising: A counterweight (41) slidably arranged on one side of the guide rail frame (11) far away from the suspension cage (20), and And one end of the rope (42) is connected with the suspension cage (20), and the other end of the rope bypasses the top of the guide rail frame (11) and is connected with the counterweight.
- 7. Building construction lifting platform according to claim 1, characterized in that between two adjacent uprights (23) a fall protection chain is connected, which fall protection chain is arranged horizontally, which fall protection chain is configured with pretension to tension itself.
- 8. The building construction lift platform of claim 1, wherein the wall-attached support (12) comprises: a connecting seat for connecting with the building outer wall, and The support rod is perpendicular to the building outer wall, one end of the support rod is connected with the connecting seat, the other end of the support rod is connected with the guide rail frame (11), and the support rod comprises two rod bodies which can stretch and retract along the direction perpendicular to the building outer wall.
- 9. The lifting platform for building construction according to claim 1, wherein the second side of the cage (20) is covered with a third screen (28), and a switch door (281) is arranged on the third screen (28).
- 10. The lifting platform for building construction according to claim 9, wherein the third screen (28) is provided with a third chute along an up-down direction, the top of the upper frame body (22) is provided with an avoidance slot, and the opening and closing door (281) comprises: A door plate (2811) arranged on the third screen plate (28) and in sliding fit with the third sliding groove, and And the lifting driving mechanism (2812) is arranged on the upper frame body (22) and is used for driving the door plate (2811) to slide and lift along the third sliding groove, and when the door plate (2811) is at the opening position, the door plate (2811) extends upwards out of the avoidance groove.
Description
Lifting platform for building construction Technical Field The application belongs to the technical field of building construction equipment, and particularly relates to a building construction lifting platform. Background Building construction lift platforms, commonly referred to as building lifts, are vertical transport devices used for man-carrying cargo during building construction. The equipment is generally attached to the outer side of a main structure of a building and is arranged in parallel with the vertical face of the building so as to realize vertical transportation of materials and up-and-down passing of constructors. Because the traditional building is mostly of a vertical structure, the construction lifter is usually vertically installed, a guide rail frame of the construction lifter is fixed in a vertical direction, and the angle is not adjustable. The design forms a standardized production and installation mode in long-term practice, and can meet the construction requirements of most conventional buildings. However, with the continued development of modern architectural design concepts and the increasing diversity of building forms, the facades of many buildings exhibit different angled configurations in order to pursue aesthetic effects and differentiated appearance. Such non-vertical building forms place new adaptability demands on the construction hoist attached to its outside. Traditional perpendicular installation formula lift is because of its guide rail frame angle is fixed, can't laminate the building surface of slope, leads to the installation difficulty, adheres to unstably, exists the potential safety hazard even. To solve this contradiction, at present, a customized production mode is generally adopted in the industry, namely, a lifter with a corresponding angle is specially manufactured according to the inclination angle of a specific building. Although the customization scheme can meet the construction requirement, the customization scheme has the obvious defects that the customization relates to redesign of main structures such as a chassis, a suspension cage, a guardrail, a wall-attached support and the like due to different inclination angles of different buildings, the cost is high, the customization cannot be commonly used among different projects, and resource waste and repeated investment are caused. Disclosure of Invention Based on the technical problems, the application provides a lifting platform for building construction, which solves the technical problems that the lifting platform in the prior art does not have angle adjusting capability and cannot adapt to various inclined building outer facades. In order to achieve the purpose, the technical scheme adopted by the application is that the building construction lifting platform comprises: The support assembly comprises a guide rail frame and a wall-attached support, wherein the guide rail frame is arranged parallel to the outer wall of the building, and the wall-attached support is connected between the outer wall of the building and the guide rail frame; The lifting cage comprises a lower frame body, an upper frame body, at least four upright posts and a connecting rod unit, wherein the upper frame body and the lower frame body are of square frame structures which are horizontally arranged, at least four upright posts are connected to the corner positions of the upper frame body and the lower frame body in a one-to-one correspondence manner, the tops of the upright posts are hinged with the upper frame body, the bottoms of the upright posts are hinged with the lower frame body, the hinge shafts of the upright posts are parallel to each other, the connecting rod unit is connected between the upper frame body and the lower frame body in a telescopic manner, two side faces which define the lifting cage to be perpendicular to the hinge shaft line of the upright posts are first side faces, two side faces which are parallel to the hinge shaft line of the upright posts are second side faces, and The traveling assembly is arranged on the first side face of the suspension cage and used for driving the suspension cage to move along the guide rail frame. In one possible implementation, the support assembly further includes: A fixed seat with an arc-shaped track, a bottom of the guide rail frame is in sliding fit with the track, and And the hydraulic oil cylinder is arranged on the fixed seat and used for driving the guide rail frame to slide along the track. In one possible implementation manner, a first chute is formed in the side length direction of the frame forming the first side surface at the top of the lower frame body, and the connecting rod unit includes: The sleeve is arranged on the first side surface of the suspension cage, the top of the sleeve is connected with the frame of the first side surface of the upper frame body, and the bottom of the sleeve extends downwards; The top of the sliding rod is in sliding f