CN-121976625-A - Light concrete partition wall construction structure of assembled steel structure building and method thereof
Abstract
The invention discloses a construction structure and a construction method of an assembled steel structure building lightweight concrete partition wall, and belongs to the technical field of assembled buildings. The construction structure comprises steel columns at two sides, upper and lower steel beams, a bottom plate, a reinforcement cage, reinforcement meshes, a template, vertical square timber and a opposite-pull assembly, wherein the reinforcement cage consists of embedded reinforcement, U-shaped reinforcement, vertical reinforcement, horizontal U-shaped reinforcement and horizontal reinforcement, a PVC hollow pipe is arranged at the inner side, reinforcement meshes are bound at the two sides, the vertical square timber is arranged at the outer side of the template, the vertical square timber is fastened through the opposite-pull assembly, and a PVC grouting pipe is arranged on the template. The construction method comprises the steps of binding steel bars, supporting and setting templates, oppositely pulling and reinforcing, grouting and pouring, maintenance and demolding and the like. The invention realizes reliable connection of the partition wall and the steel structure main body, has stable formwork, compact pouring and high construction efficiency, can effectively reduce wall hollowing and cracking, and is suitable for industrialized rapid construction of assembled steel structure buildings.
Inventors
- YANG LIANGCHENG
- LU HUA
- YU ENBIN
- Chen Huzhang
- CHENG YU
- DONG WEILI
Assignees
- 中铁十一局集团有限公司
- 中铁十一局集团建筑安装工程有限公司
- 中铁十一局集团建设发展有限公司
Dates
- Publication Date
- 20260505
- Application Date
- 20260317
Claims (7)
- 1. The utility model provides an assembled steel construction building lightweight concrete partition wall construction structure, its characterized in that, steel column (1) and girder steel (2) including both sides, two both sides all are fixed with girder steel (2) about between steel column (1), are located girder steel (2) top of downside and pour bottom plate (19), be equipped with steel reinforcement cage (20) between bottom plate (19), steel column (1) and upside girder steel (2), steel reinforcement net piece (9) have all been tied up to the both sides of steel reinforcement cage (20), the both sides of steel column (1) all are equipped with template (11) that are used for pouring, and steel reinforcement cage (20) set up between two templates (11), a plurality of vertical square timber (12) are installed in the template (11) outside hugging closely, template (11) and vertical square timber (12) of steel column (1) both sides are connected through to drawing subassembly (21).
- 2. The fabricated steel structure building lightweight concrete partition wall construction structure of claim 1, wherein the reinforcement cage (20) comprises embedded bars (4) embedded in a pouring manner on a bottom plate (19), U-shaped bars (3) welded and fixed at the bottom of an upper steel beam (2), middle vertical bars (5) with two ends respectively bound and connected with the top U-shaped bars (3) and the bottom embedded bars (4), horizontal U-shaped bars (6) welded on the inner side of the steel column (1), and horizontal bars (7) bound and connected with the horizontal U-shaped bars (6) on the steel columns (1) on two sides.
- 3. The construction structure of the fabricated steel structure building lightweight concrete partition wall according to claim 2, wherein a plurality of PVC hollow pipes (8) are arranged on the inner side of the reinforcement cage (20) along the vertical direction.
- 4. The fabricated steel structure building lightweight concrete partition construction structure according to claim 3, wherein the opposite-pulling assembly (21) comprises a plurality of wall-penetrating PVC (polyvinyl chloride) sleeves (17) arranged between two templates (11), opposite-pulling screws (13) are installed on the inner sides of the wall-penetrating PVC sleeves (17), mountain-shaped clamps (15) are installed on the two ends of the opposite-pulling screws (13), horizontal steel pipes (14) are installed in two grooves of the mountain-shaped clamps (15), nuts (16) are installed on the two ends of the opposite-pulling screws (13) through threads, and when the nuts (16) on the two ends of the opposite-pulling screws (13) are screwed down, the mountain-shaped clamps (15) enable the horizontal steel pipes (14) to extrude vertical square timber (12) under the extrusion of the nuts (16), and then the templates (11) are extruded.
- 5. The construction structure of the fabricated steel structure building lightweight concrete partition wall according to claim 1, wherein the template (11) on one side is provided with PVC grouting pipes (18).
- 6. The fabricated steel structure building lightweight concrete partition construction structure according to claim 5, wherein lightweight foam concrete is poured along the PVC grouting pipe (18) to form the lightweight foam concrete wall (10).
- 7. A construction method of an assembled steel structure building lightweight concrete partition wall, characterized by performing construction based on the construction structure according to any one of claims 1-6, comprising the following steps: The method comprises the steps of S1, installing a steel reinforcement framework, namely pouring a bottom plate (19) on the top of a lower steel beam (2), pre-burying and fixing pre-buried steel bars (4) on the bottom plate (19), welding U-shaped steel bars (3) on the bottom of an upper steel beam (2), welding horizontal U-shaped steel bars (6) on the inner side of a steel column (1), binding two ends of a middle vertical steel bar (5) with the U-shaped steel bars (3) and the pre-buried steel bars (4), binding horizontal steel bars (7) with the horizontal U-shaped steel bars (6) to form a steel reinforcement cage (20), installing PVC hollow pipes (8) on the inner side of the steel reinforcement cage (20), and binding steel reinforcement meshes (9) on two sides of the steel reinforcement cage (20); S2, supporting templates, namely installing templates (11) on two sides of a reinforcement cage (20), and closely arranging vertical square timber (12) on the outer sides of the templates (11); s3, tensioning and fixing, namely installing a wall-penetrating PVC sleeve (17) between the templates (11), penetrating a counter-pulling screw (13), sequentially installing a horizontal steel pipe (14) and a mountain-shaped clamp (15) at two ends of the counter-pulling screw (13), and screwing up a nut (16) to finish the reinforcement of a template system; S4, grouting molding, namely injecting light foam concrete into the inner cavity of the template through a PVC grouting pipe (18) on the template (11) to form a light foam concrete wall (10) until pouring is compact and full; And S5, curing and demolding, namely loosening the nuts (16) after the light foam concrete wall body (10) is cured to the designed strength, and sequentially removing the opposite-pull assembly (21), the vertical square timber (12) and the templates (11) to finish partition wall construction.
Description
Light concrete partition wall construction structure of assembled steel structure building and method thereof Technical Field The invention relates to the technical field of assembled buildings, in particular to an assembled steel structure building lightweight concrete partition wall construction structure and a method thereof. Background Along with the continuous promotion of the large-scale popularization and the industrial construction standard of the assembled steel structure building, the non-bearing partition wall is used as a key component of a building enclosure system, and the connection reliability, the construction efficiency, the crack resistance and hollowing resistance and the light weight level of the non-bearing partition wall directly determine the overall quality and the construction efficiency of the building. In the current assembly type steel structure building partition construction, traditional brickwork wall body, ALC light partition board are mainstream application form, and conventional cast-in-situ lightweight concrete partition also has a small amount of use, but three types of wall bodies all have outstanding technical short slab, can't adapt to industrialization, the rapidness of assembly type steel structure building, high-quality construction demand: 1. The traditional masonry wall has the advantages of large dead weight, great increase of the main body load of the steel structure, violation of the lightweight design principle of the building, heavy site wet operation, complicated masonry procedures, long construction period, conflict with the efficient construction concept of the assembled building, and potential safety hazards such as cracking of the wall, separation and falling off of the main body structure and the like easily caused by the fact that the masonry is simply connected with the steel column and the steel beam only through tie bars, and extremely poor integrity. The ALC light partition board has the advantages of light weight, high installation speed, large number of board splicing seams, easy cracking of the splicing seams under the stress action, water seepage and sound insulation performance attenuation, insufficient anchoring reliability of joints with a steel structure main body, easy loosening of connecting pieces, easy board displacement and deformation after long-term use, poor board field cutting suitability, high complex house type construction difficulty and limited overall impact resistance and deformation resistance. 3. The conventional cast-in-situ lightweight concrete partition wall is free of an integrated steel bar anchoring structure, weak in connection and easy to loosen and displace, a formwork supporting system adopts a simple reinforcing mode, lateral pressure resistance is insufficient, casting is easy to generate mold running, slurry leakage and mold expansion, a concrete casting process is rough, incompact and honeycomb pitting are easy to occur in the interior, a later-stage wall hollowing and cracking rate is high, a construction process is free of a standardized flow, and the core requirements of industrial and modularized rapid construction of an assembled steel structure building cannot be matched. To sum up, current brickwork wall body, ALC wall body and traditional lightweight concrete partition wall can't all satisfy the core demand that assembled steel construction building connection is reliable, the formwork is firm, pour closely knit, the high-efficient, anti crack of construction anti hollowing simultaneously. Therefore, it is necessary to provide a fabricated steel structure building lightweight concrete partition construction structure and a method thereof to solve the above technical problems. Disclosure of Invention In order to solve the technical problems, the invention provides an assembled steel structure building lightweight concrete partition construction structure and a method thereof. The invention provides an assembled steel structure building lightweight concrete partition wall construction structure which comprises steel columns and steel beams at two sides, wherein the steel beams are fixed at the upper side and the lower side between the two steel columns, a bottom plate is poured at the top of the steel beam at the lower side, a reinforcement cage is arranged among the bottom plate, the steel columns and the steel beams at the upper side, reinforcement meshes are tied at the two sides of the reinforcement cage, templates for pouring are arranged at the two sides of the steel columns, the reinforcement cage is arranged between the two templates, a plurality of vertical square timber blocks are closely arranged at the outer sides of the templates, and the templates at the two sides of the steel columns and the vertical square timber blocks are connected through opposite-pull assemblies. Further, the steel reinforcement cage includes the embedded bar of pre-buried pouring on the bottom plate, welded fastenin