CN-121981474-A - Intelligent generation and distribution method and system for urban greening maintenance Zhou Du worksheets
Abstract
The invention provides an intelligent generation and dispatch method and system for an urban greening maintenance Zhou Du work order, which are applied to an urban greening maintenance management platform. The method comprises the steps of establishing an annual maintenance rule base and an urban greening asset account, generating an annual maintenance schedule based on the rule base and the account, screening and aggregating the annual maintenance schedule according to months to form an monthly candidate operation item pool, disassembling the monthly candidate operation item into a weekly candidate operation item according to frequency types and trigger rules, generating Zhou Du work order draft and confirming to form a weekly formal work order dispatch and execution, collecting and executing feedback and archiving, and comparing the annual maintenance schedule record to support statistical analysis and rule adjustment. The corresponding system comprises a rule configuration module, an asset account module, an annual plan generation module, a month/Zhou Du disassembly module, a work order generation module, a work order dispatch module and an execution feedback archiving module, and closed-loop management of rule-plan-disassembly-dispatch-archiving is realized.
Inventors
- ZHU YUEQING
- FENG ZHIJUN
- LI TIANCUI
- PAN WEIJUN
- LI SHILONG
Assignees
- 星景科技有限公司
Dates
- Publication Date
- 20260505
- Application Date
- 20260126
Claims (10)
- 1. The intelligent generation and distribution method for the municipal greening maintenance Zhou Du worksheets is characterized by comprising the following steps of: S1, inputting or importing urban greening annual maintenance rules into a rule configuration module to form an annual maintenance rule base, and establishing an urban greening asset ledger in an asset ledger management module; S2, automatically generating an annual maintenance plan, and generating an annual maintenance plan table based on the annual maintenance rule base and the urban greening asset account; s3, generating a month candidate operation item pool, screening the annual plan records of the corresponding month from the annual maintenance plan table in the target month, and aggregating the annual plan records to form the month candidate operation item pool; S4, a step of disassembling from month to week, wherein the month candidate operation item Chi Cajie is generated into a Zhou Du candidate operation item list according to the frequency type and the frequency; s5 Zhou Du, generating a circumference work order draft aiming at specific year, month, week and area and contract unit; s6, manually intervention and work order confirmation dispatching steps are carried out, the Zhou Du work order draft is checked, adjusted and Zhou Du formal work orders are generated, and then dispatched to an execution team; And S7, executing feedback and data archiving, collecting the execution feedback of the Zhou Du formal work orders, archiving and storing, and comparing with corresponding annual plan records in the annual maintenance schedule to support subsequent statistical analysis and rule adjustment.
- 2. The intelligent generation and distribution method of the urban greening maintenance Zhou Du work orders according to claim 1 is characterized in that in the step S1, at least plant classification, month, maintenance category, maintenance procedure, frequency type, frequency and triggering rule are supported and configured, and at least sheet area, plant classification, quantity and/or area and sub-classification information is recorded by the asset account.
- 3. The intelligent generation and distribution method of the urban greening maintenance Zhou Du work order according to claim 1, wherein in the step S2, for a target year, a system traverses the annual maintenance rule base and determines the application range of each rule by combining with the urban greening asset account, and generates an annual plan record and stores the annual plan record in the annual maintenance schedule table, and each annual plan record at least comprises year, month, area, plant classification, maintenance category, maintenance procedure, operation main points, frequency type, times, trigger rule, number of applicable objects and/or area.
- 4. The intelligent generation and distribution method of the urban afforestation maintenance Zhou Du worksheets according to claim 1, wherein in S4, the method is performed according to a preset frequency disassembly rule: For weekly class candidates, assigning them to weekly times of the month; for the monthly class candidates, they are assigned to the assigned weeks of the month, and default assigned to week 2 of the month; for the pre-festival preparation class candidate, anchoring the pre-festival preparation class candidate to the week corresponding to the week before the fixed festival date; For on-demand/pest control threshold class candidates, generating temporary worksheets or activation candidates when a trigger condition is met; And forming the Zhou Du candidate operation item list, wherein each record at least comprises year, month, week, zone, plant classification, maintenance procedure, current week suggestion frequency and corresponding trigger rule identification.
- 5. The method of claim 1, wherein in S6, a manager or a contractor checks the Zhou Du work order draft for candidate work items to be executed, modifies actual frequency or range of the week, modifies the estimated man-machine material demand value in combination with actual situation of the region, deletes or merges part of details when there is resource conflict, generates Zhou Du formal work order after confirmation, and distributes the execution.
- 6. The method for intelligently generating and distributing the urban greening maintenance Zhou Du work orders according to claim 1, wherein in the step S7, the execution end feeds back the completion condition and the actual consumption of the human-machine materials, the system files and stores Zhou Du formal work order data, each work order detail at least comprises year, month, week, area, plant classification, maintenance procedure, job description, book Zhou Pinci, applicable object number and/or area and actual human-machine material requirement, and the archived work order details are compared with the corresponding annual plan records in the annual maintenance schedule according to the year, month, area and the corresponding annual plan records for providing reference for rule configuration and plan generation of the next year.
- 7. An intelligent generation and distribution system for an urban greening maintenance Zhou Du work order, which is characterized by comprising: The system comprises a rule configuration module, an asset account management module, an annual plan generation module, a month/Zhou Du disassembly module, an intelligent work order generation module, a work order confirmation and dispatch module, an execution feedback and closed loop module and a data storage and analysis module, The rule configuration module is used for maintaining an annual maintenance rule base, and the annual maintenance rule at least supports configuration month/season, plant classification, maintenance category, maintenance procedure, frequency type/times and triggering rule; The asset account management module is used for maintaining an urban greening asset account, and the urban greening asset account at least comprises a sheet area/object list, quantity and/or area and a position field; The annual plan generation module is used for generating an annual maintenance schedule table based on the annual maintenance rule base and the urban greening asset account to form an annual plan entry; the month/Zhou Du disassembling module is used for generating a month candidate operation item pool from the annual maintenance schedule table and further disassembling the month candidate operation item pool to form a circumference candidate operation item table; The intelligent work order generation module is used for generating Zhou Du work order draft based on the Zhou Du candidate job item table; the work order confirmation and dispatch module is used for presenting the Zhou Du work order draft to a manager or a contractor for checking and adjusting, generating Zhou Du formal work order after confirmation and dispatching to an execution terminal; the execution feedback and closed loop module is used for receiving the execution feedback data returned by the execution terminal; the data storage and analysis module is used for storing and statistically analyzing annual maintenance schedule, zhou Du formal work orders, urban greening asset account and execution feedback data, and outputting historical data and/or optimized version for rule configuration and plan generation update; The trigger rule at least comprises one or more of pre-node trigger, post-disaster trigger and threshold trigger, and the execution feedback data at least comprises one or more of completion return, quality check and actual investment.
- 8. The intelligent generation and dispatch system of municipal afforestation maintenance Zhou Du work orders of claim 7, wherein the annual plan generation module is configured to traverse an annual maintenance rule base and determine rule application ranges in combination with municipal afforestation asset accounts, generate annual plan records and write the annual maintenance schedule, and each annual plan record at least comprises a year, a month, a zone, a plant classification, a maintenance category, a maintenance procedure, an operation gist, a frequency type, a number of times, a trigger rule, an applicable object number and/or an area.
- 9. The intelligent city greening maintenance Zhou Du work order generation and distribution system according to claim 7, wherein the month/Zhou Du disassembly module is configured to screen the annual schedule records of the corresponding month from the annual maintenance schedule table in the target month, aggregate the annual schedule records according to plant classification and maintenance procedures to form a month candidate work item pool, and generate Zhou Du a month candidate work item Chi Cajie according to frequency type and frequency.
- 10. The urban afforestation maintenance Zhou Du worksheet intelligent generation and dispatch system of claim 7, wherein the monthly/Zhou Du disassembly module is configured to execute a disassembly policy that is assigned to each week of the month, default assigned to week of the month, anchored to the week before a fixed holiday date, and generates temporary worksheets or activation candidates when a trigger condition is met, respectively, for weekly, monthly, pre-festival preparation, and on-demand/pest control threshold type candidates.
Description
Intelligent generation and distribution method and system for urban greening maintenance Zhou Du worksheets Technical Field The invention relates to the technical field of urban landscaping maintenance, in particular to an intelligent generation and dispatch method and system for a work order of urban landscaping maintenance Zhou Du. Background Urban greening maintenance management generally has a hierarchical organization of annual planning-month arrangement-week/day worksheet execution. In the conventional practice, the annual plan is manually split into a month plan and Zhou Gongshan by a manager, which relates to how to distribute multiple executions of the same process in one month to specific weeks, how to weight the front week of the node, how to insert emergency work orders after disaster, and the like, and often depends on manual experience judgment, thus easily causing problems of repeated arrangement of part of processes, omission of part of processes, difficulty in regional and team-crossing overall planning, and the like. In cities with higher informatization level, a garden information management system or a city operation management platform is usually introduced and used for asset account and work order data management, quality assessment record statistics and simple periodic task setting, but a plurality of systems still stay in the application form of data statistics and manual planning, and annual planning and work order disassembly are mainly finished by manpower. Compared with the hierarchical plan management requirement of greening maintenance business, the existing scheme has at least the following defects: First, the lack of unified rule modeling capability across "plant category, month/time, maintenance category, maintenance procedure, frequency type/number of times" and other dimensions makes it difficult to form a calculable, reusable annual maintenance rule system, and thus to automatically generate a structured annual maintenance plan starting from an annual rule. Secondly, a mechanism for automatically decomposing the annual schedule to month and Zhou Du candidate operation items and further combining the annual schedule to form a weekly work order draft is lacked, so that a link of 'annual rule-annual schedule-Zhou Gongshan' is difficult to be closed-loop, and the annual rule is difficult to be guaranteed to be completely put on the Zhou Gongshan level. Thirdly, for the overall arrangement of the regular periodic frequency and the special triggering event, the conventional system is often treated by a temporary notice or a temporary work order, is difficult to uniformly incorporate into the same rule system and scheduling framework, is easy to conflict or repeat with the established work order, and is not beneficial to forming a regularized and retrospective plan and a dispatch basis. Therefore, a technical scheme is needed for realizing unified modeling of multidimensional rules and automatic generation of annual plans and supporting automatic disassembly and distribution of the annual plans to month and Zhou Du work orders for urban greening maintenance scenes. Disclosure of Invention The application aims to provide an intelligent generation and dispatch method and system for an urban greening maintenance Zhou Du work order, which are characterized in that an annual maintenance schedule is automatically generated by uniformly modeling an annual maintenance rule base and an urban greening asset account, the annual maintenance schedule is structured and disassembled according to months and weeks to form a candidate operation item list, a Zhou Du intelligent work order draft is further generated by combining a facing area and a contractor unit and is supported to be manually confirmed and dispatched, and meanwhile, the personnel and machine resources are optionally subjected to measuring, calculating and checking and execution feedback and writing back to the annual schedule execution record, so that a closed-loop mechanism of 'rule-plan-disassembling-dispatching-execution-write-back' is formed, the manual programming and disassembling cost is reduced, and the consistency, the executable and the continuous optimizing capability of the maintenance plan are improved. In a first aspect, the application provides an intelligent generation and distribution method of an urban greening maintenance Zhou Du work order, which is applied to an urban greening maintenance management platform, wherein the platform at least comprises a rule configuration module, an asset account management module, an annual plan generation module, a month/Zhou Du disassembly module, an intelligent work order generation module and a work order confirmation and distribution module, and the method comprises the following steps: s1, inputting or importing urban greening annual maintenance rules in a rule configuration module to form an annual maintenance rule base, and establishing an urban greening asset ledger i