CN-121981667-A - Method and related equipment for rapidly generating project report of power grid company capable of being ground and reviewed

CN121981667ACN 121981667 ACN121981667 ACN 121981667ACN-121981667-A

Abstract

The application provides a method and related equipment for rapidly generating a report of a system project capable of being reviewed by a power grid company, and belongs to the technical field of data processing. The method comprises the steps of constructing a fixed database, manufacturing a report template set according to report requirements, updating the data of a measurable report table of a current item to be reviewed to a change database, obtaining item basic information and category information of the item to be processed, reading data according to the item basic information and the fixed database, checking and correcting the read data to obtain item data, filling templates according to the item data and the report template set to obtain an item basic surface analysis table, reading the data of the measurable report table from the change database according to the item basic information, and filling templates according to the category information, the measurable report table data and the report template set to obtain an item scheme filling report. The application can realize high efficiency of report preparation work and unified data standard, and has high efficiency, accuracy and effectiveness.

Inventors

  • ZHANG JINHUI
  • Xiao Fengxue
  • CHEN WENTING
  • ZHENG JINZHOU

Assignees

  • 广东艾博电力设计院(集团)有限公司

Dates

Publication Date
20260505
Application Date
20251218

Claims (10)

  1. 1. A method for rapidly generating a grid company's review system project report, the method comprising the steps of: The method comprises the steps of constructing a fixed database, wherein the fixed database comprises a project planning library and a project problem library in a power grid company planning report; Making a report template set according to report requirements; updating the data of the measurable report table of the current item to be reviewed to a change database; Acquiring item basic information and category information of an item to be processed; reading data according to the project basic information and the fixed database, and checking and correcting the read data to obtain project data; Template filling is carried out according to the project data and the report template set, and a project basic surface analysis table is obtained; Reading the data of the report table to be ground from the change database according to the project basic information; Template filling is carried out according to the category information, the data of the report table capable of being ground and the report template set, so that a project scheme filling report is obtained; And taking the project basic plane analysis table or the project scheme filling table as a project report of the power grid company's lapping and evaluating system.
  2. 2. The method of claim 1, wherein the constructing a fixed database comprises: Acquiring planning report data of a power grid company; Extracting project planning data according to the power grid company planning report data, and establishing a project planning library; extracting project problem data according to the power grid company planning report data, and establishing a project problem library; And obtaining a fixed database according to the project planning library and the project problem library.
  3. 3. The method of claim 1, wherein creating a set of reporting templates based on reporting requirements comprises: Acquiring report requirements of an electric network company capable of being ground and reviewed; Making a project basic surface analysis table template and a project scheme filling table template according to the report requirements; And using the project basic plane analysis table template and the project scheme filling table template as a report template set.
  4. 4. The method according to claim 1, wherein the acquiring item basic information and category information of the item to be processed includes: acquiring data input by a user through an operation interface of a report generating tool to obtain project basic information of a project to be processed, wherein the project basic information comprises a project name, a planning project code, a reserve library code, a construction unit and a design unit; And acquiring content data selected by a user through an operation interface of a report generating tool to obtain category information of the item to be processed, wherein the category information comprises the item type and construction and transformation content items checked from a preset list.
  5. 5. The method according to claim 1, wherein the reading data according to the item basic information and the fixed database, and checking and correcting the read data to obtain item data, comprises: reading corresponding project planning data and project problem data from the fixed database according to the project basic information; Displaying the project planning data and the project problem data to obtain display data; And checking, correcting and confirming the display data to obtain project data.
  6. 6. The method of claim 1, wherein the performing template filling according to the project data and the report template set to obtain a project basic plane analysis table comprises: Invoking the project basic surface analysis table template in the report template set; And filling project planning data and project problem data in the project data into the project basic plane analysis table template to obtain a filled project basic plane analysis table, wherein the project planning data comprises grids and line numbers, and the project problem data comprises problem codes and problem equipment numbers.
  7. 7. The method of claim 1, wherein said reading the report-capable table data from the change database based on the project basis information comprises: And responding to the triggering operation of a user on a scheme filling table unit generated in the function implementation module, and automatically positioning and reading the data of the measurable report table corresponding to the current item in the change database according to the item basic information related to the current operation context, wherein the data of the measurable report table comprises scrapped asset statistical data, investment estimation data and construction content.
  8. 8. The method of claim 1, wherein the template filling according to the category information, the report table data and the report template set to obtain a project scheme filled report comprises: Selecting a corresponding project scheme report template from the report template set according to the category information; and filling the data of the report table to the corresponding field of the project scheme filling report template to obtain a project scheme filling report.
  9. 9. A system for rapidly generating grid company reviewed system project reports for implementing the method of any of claims 1 to 8, the system comprising: The project basic information filling module is used for receiving and storing project basic information; the project construction and transformation content selection module is used for providing options for users to select construction or transformation content categories of projects; the report template set module is used for storing various prefabricated report templates which accord with the format requirements of the system capable of being reviewed; The database module comprises a fixed database and a variable database, wherein the fixed database is used for storing a project planning database and a project problem database, and the variable database is used for storing the data of a researched report table of the project in the current period; a function implementation module, comprising: The data checking and reading unit is used for reading corresponding project planning data and project problem data from the fixed database according to the project basic information; A basic surface analysis table generating unit for generating a basic surface analysis table of the project by calling a template from the report template set module according to the project basic information and the confirmed project planning data and the project problem data; and the generating scheme filling table unit is used for calling a template from the report template set module to generate a project scheme filling table according to the category information acquired from the project construction and transformation content selection module and the data of the measurable report table acquired from the change database.
  10. 10. A computer program product comprising a computer program, characterized in that the computer program, when executed by a processor, implements the method of any one of claims 1 to 8.

Description

Method and related equipment for rapidly generating project report of power grid company capable of being ground and reviewed Technical Field The application relates to the technical field of data processing, in particular to a method and related equipment for rapidly generating a report of an abradable review system project of a power grid company. Background In the related technology, the power grid company has the problems of insufficient service support range, old and old review service flow, insufficient design delivery standardization, non-uniform review standard, technical extensible difference, stubborn data island, low intelligent auxiliary review support capability, weak auxiliary decision capability of management departments and the like based on the review auxiliary decision-making module. In summary, the technical problems in the related art are to be improved. Disclosure of Invention The embodiment of the application mainly aims to provide a method and related equipment for rapidly generating a report of an abradable review system project of a power grid company, which can realize high efficiency and unified data standard of report preparation work and has high efficiency, accuracy and effectiveness. In order to achieve the above objective, an aspect of the embodiments of the present application provides a method for quickly generating a report of a system project capable of being reviewed by a grid company, the method comprising the following steps: The method comprises the steps of constructing a fixed database, wherein the fixed database comprises a project planning library and a project problem library in a power grid company planning report; Making a report template set according to report requirements; updating the data of the measurable report table of the current item to be reviewed to a change database; Acquiring item basic information and category information of an item to be processed; reading data according to the project basic information and the fixed database, and checking and correcting the read data to obtain project data; Template filling is carried out according to the project data and the report template set, and a project basic surface analysis table is obtained; Reading the data of the report table to be ground from the change database according to the project basic information; Template filling is carried out according to the category information, the data of the report table capable of being ground and the report template set, so that a project scheme filling report is obtained; And taking the project basic plane analysis table or the project scheme filling table as a project report of the power grid company's lapping and evaluating system. In some embodiments, the building a fixed database includes: Acquiring planning report data of a power grid company; Extracting project planning data according to the power grid company planning report data, and establishing a project planning library; extracting project problem data according to the power grid company planning report data, and establishing a project problem library; And obtaining a fixed database according to the project planning library and the project problem library. In some embodiments, the creating the report template set according to the report requirement includes: Acquiring report requirements of an electric network company capable of being ground and reviewed; Making a project basic surface analysis table template and a project scheme filling table template according to the report requirements; And using the project basic plane analysis table template and the project scheme filling table template as a report template set. In some embodiments, the acquiring the item basic information and the category information of the item to be processed includes: acquiring data input by a user through an operation interface of a report generating tool to obtain project basic information of a project to be processed, wherein the project basic information comprises a project name, a planning project code, a reserve library code, a construction unit and a design unit; And acquiring content data selected by a user through an operation interface of a report generating tool to obtain category information of the item to be processed, wherein the category information comprises the item type and construction and transformation content items checked from a preset list. In some embodiments, the reading data according to the project basic information and the fixed database, and checking and correcting the read data to obtain project data includes: reading corresponding project planning data and project problem data from the fixed database according to the project basic information; Displaying the project planning data and the project problem data to obtain display data; And checking, correcting and confirming the display data to obtain project data. In some embodiments, the template filling is performed according to the project data