The application provides foundation pit construction lifting equipment and a use method thereof, and relates to the technical field of foundation pit construction, wherein the foundation pit construction lifting equipment comprises a fixing module, a hoisting module and a ladder cage module, a plurality of fixing modules are arranged at intervals along a first direction, each fixing module is fixedly connected with a supporting structure of a foundation pit and provided with a well, the hoisting module is arranged on the fixing module at the uppermost layer and provided with a hoisting point, the hoisting point is higher than the fixing module, at least one ladder cage module is connected with the well in a sliding manner along the first direction, and the ladder cage module is suitable for being stopped at a preset position of the well. According to the application, the self-bearing, self-lifting and high-precision installation of lifting equipment in the foundation pit are realized through integrating the fixing module, the lifting module and the ladder cage module.
Inventors
- LU JIABEI
- HU WENJIE
- Yao Dayou
- FAN CHI
- WU ZEYU
- ZHANG RUIBIN
- LIN JINJUN
- QIAN YECUN
- SU HAOLIN
- FENG JIANGHONG
Assignees
- 中建三局(深圳)科创有限公司
- 中建三局集团(深圳)有限公司
Dates
- Publication Date
- 20260508
- Application Date
- 20260317
Claims (10)
- 1. The utility model provides a foundation ditch construction jacking equipment, its characterized in that, includes fixed module, hoist and mount module and ladder cage module, a plurality of fixed module sets up along first direction interval, every fixed module and the supporting construction fixed connection of foundation ditch are equipped with the well, hoist and mount module install in the fixed module of upper strata and be equipped with the hoisting point, the hoisting point be higher than fixed module sets up, at least one ladder cage module with the well is followed first direction sliding connection, just ladder cage module is suitable for berth in the preset position of well.
- 2. The foundation pit construction lifting device of claim 1, wherein each of the cage modules comprises a frame body, guide rails, a first construction platform and a second construction platform and stairs, each guide rail is arranged on the frame body along a first direction, the guide rails of adjacent cage modules are connected along the first direction, the first construction platform is positioned at one end of the frame body, the second construction platform is positioned at the other end of the frame body, the stairs are respectively connected with the second construction platform and the first construction platform, and the second construction platform of the cage module positioned below coincides with the first construction platform of the cage module positioned above.
- 3. The foundation pit construction hoist apparatus of claim 2, further comprising a locking module, each of the guide rails including a body and a locking portion protruding from the body in a radial direction of the body, the locking module being provided with a clamping opening having a first width smaller than the width of the locking portion and a second width larger than the width of the locking portion, the locking portion cooperating with the clamping opening to rest against the cage module when the clamping opening is at the first width, and the clamping opening releasing the locking portion to release the cage module when the clamping opening is at the second width.
- 4. A foundation pit construction lifting device according to any one of claims 1 to 3, further comprising a support module, one of said support modules being fixedly connected to one of said fixed modules, and one of said support modules being also detachably connected to said cage module when said cage module is docked in said predetermined position.
- 5. The foundation pit construction lifting device of claim 4, wherein the supporting module comprises a first connecting frame, a second connecting frame, a third connecting frame, inclined pull pieces, a first connecting piece and a second connecting piece, wherein the first connecting frame is fixedly connected with the fixing module, the second connecting frame is arranged at intervals with the first connecting frame, the third connecting frame is respectively fixedly connected with the first connecting frame and the second connecting frame, a plurality of inclined pull pieces are arranged at intervals, each inclined pull piece is respectively fixedly connected with the first connecting frame and the second connecting frame, the first connecting piece is respectively fixedly connected with the second connecting frame and the ladder cage module, the two second connecting pieces are symmetrically arranged by taking a connecting line of the first connecting piece and the ladder cage module as a symmetrical axis, the second connecting piece is fixedly connected with the second connecting frame, and the second connecting piece and the ladder cage module are fixed through anchor cables.
- 6. The foundation pit construction lifting device of claim 5, wherein the first connecting frame is provided with a connecting seat, the second connecting frame is provided with a mounting seat, the inclined pulling piece is configured as a connecting rod, one end of the connecting rod is arranged on the connecting seat, and the other end of the connecting rod is arranged on the mounting seat.
- 7. The foundation pit construction lifting device of claim 5, wherein the first connector comprises a support connection plate and a docking support base, the support connection plate is fixedly connected with the third connection frame, the docking support base is arranged on the support connection plate, and the docking support base is fixedly connected with the ladder cage module.
- 8. A foundation pit construction lifting device according to any one of claims 1 to 3, wherein the lifting module comprises a lifting arm and a hoist, the lifting arm being rotatably connected to the fixed module, the hoist being mounted to the lifting arm and provided with the lifting point.
- 9. A foundation pit construction lifting device according to any one of claims 1 to 3, wherein the fixing module comprises a cantilever beam and a base, at least two cantilever beams are fixedly connected with the supporting structure of the foundation pit respectively, the base is arranged on the cantilever beam, and the base is provided with the hoistway.
- 10. A method of using the foundation pit construction hoist apparatus of any one of claims 1 to 9, the method comprising: constructing a plurality of fixing modules along a first direction on a supporting structure of a foundation pit; A hoisting module is arranged on the fixed module at the uppermost layer; prefabricating a ladder cage module, placing the ladder cage module at the pit bottom, and placing a first ladder cage module below a fixed module; starting a hoisting module, lowering a hoisting point to the pit bottom, and connecting the hoisting point with a first ladder cage module; lifting a first ladder cage module to a preset position, and fixing the first ladder cage module; The steps are circulated, and the ladder cage modules are continuously lifted one by one until the ladder cage module lifted later is in butt joint with the ladder cage module fixed before; Using a fastener to quickly connect the ladder cage module lifted later with the ladder cage module fixed earlier; after construction is completed, the lifting module, the fixing module and the cage module at the uppermost layer are reserved, the cage modules are placed one by one from bottom to top, the fixing modules are detached one by one from bottom to top by utilizing the cage module at the uppermost layer as a construction space, and finally the lifting module and the fixing module at the uppermost layer are detached.
Description
Lifting equipment for foundation pit construction and use method Technical Field The application relates to the technical field of foundation pit construction, in particular to foundation pit construction lifting equipment and a use method thereof. Background In deep foundation pit engineering construction, the Z-shaped safety ladder cage has become a preferred scheme of a vertical transportation channel by virtue of the excellent safety performance and moderate gradient design. However, the installation and disassembly operations of the traditional Z-shaped ladder cages still mainly depend on large hoisting equipment configured on the pit roof. In the traditional installation process, the automobile crane needs to be stopped at the edge of the foundation pit, and the standard section of the ladder jack in the basket is lifted to a designated position in the foundation pit through a lifting hook and a steel wire rope system. Then, the operator needs to manually guide and position on the aerial working platform, and fix the new standard section with the installed part by adopting a bolt or a bolt connection mode. The process has extremely strong dependence on large equipment, and requires constructors to perform high-altitude assembly operation in the foundation pit. The main technical bottlenecks are manifested in the following aspects: 1. the space limitation conflicts with equipment, namely, in a foundation pit construction site with limited working face, large hoisting equipment often faces the problems of difficult approach, limited station, inconvenient deployment and the like. Meanwhile, the ladder cage installation operation occupies the resources of core vertical transportation equipment such as a tower crane, and other construction procedures are forced to be interrupted, so that the overall construction progress is seriously affected. 2. The potential safety hazard in the installation process is prominent, the standard knot in the suspension state is easy to swing greatly, and the risk of collision with the foundation pit supporting structure or the installed ladder cage exists. The operators lack a stable operation platform during high-altitude operation, and are faced with double safety threats of high-altitude falling and object striking during assembly and connection operation. 3. The installation accuracy and the efficiency are low, the positioning adjustment is carried out by completely relying on the manual experience and the cooperative coordination of a signal worker and an operator, the installation accuracy is difficult to ensure, the time and the labor are wasted in the alignment process, and the installation period is obviously prolonged. 4. The problem of foundation pit side slope additional load is that when large hoisting equipment works in a pit edge area, the requirement on the bearing capacity of the foundation is high, and engineering risks such as ground subsidence or side slope stability reduction can be possibly induced. Disclosure of Invention The application aims to provide foundation pit construction lifting equipment and a use method thereof, which are suitable for foundation pit construction with limited space, improve the installation safety coefficient, ensure the installation precision and the installation efficiency and protect the forms of a foundation pit and a foundation. In a first aspect, the present invention provides a foundation pit construction lifting device, where the foundation pit construction lifting device includes a fixing module, a hoisting module and a cage module, where a plurality of fixing modules are arranged at intervals along a first direction, each fixing module is fixedly connected with a supporting structure of a foundation pit and provided with a hoistway, the hoisting module is installed on the fixing module on the uppermost layer and provided with a hoisting point, the hoisting point is higher than the fixing module, at least one cage module is slidably connected with the hoistway along the first direction, and the cage module is adapted to rest at a preset position of the hoistway. In an alternative embodiment, each ladder cage module includes a frame body, guide rails, a first construction platform, a second construction platform and a stair, each guide rail is disposed on the frame body along a first direction, the guide rails of adjacent ladder cage modules are connected along the first direction, the first construction platform is located at one end of the frame body, the second construction platform is located at the other end of the frame body, the stair is respectively connected with the second construction platform and the first construction platform, and the second construction platform of the ladder cage module located below coincides with the first construction platform of the ladder cage module located above. In an alternative embodiment, the foundation pit construction lifting device further comprises a locking module, eac