Search

CN-121992822-A - Corridor trolley in immersed tube tunnel

CN121992822ACN 121992822 ACN121992822 ACN 121992822ACN-121992822-A

Abstract

The application discloses a gallery trolley in a immersed tube tunnel, which comprises an inner support frame and two inner side templates which are respectively arranged at two sides of the inner support frame, wherein the top of the inner side templates is provided with a top plate structure, the top of the inner support frame is provided with a translation driving piece for driving the inner side templates to be close to or far away from the inner support frame, and the bottom of the inner support frame is provided with a jacking driving piece for synchronously lifting the inner support frame and the inner side templates. When in construction, the jacking and translation driving piece enables the top plate structure and the inner side template to be in place, the top plate structure and the plugging strips form an inner top template and form an inner mold structure with the inner side template, and when in demolding, the translation and jacking driving piece completes demolding operation. The inner bracket and the inner side template are spliced by a plurality of units. The application achieves the effects of facilitating gallery construction and demoulding in the immersed tube tunnel and improving construction efficiency and quality.

Inventors

  • WANG BEN
  • HUANG YIBO
  • GU WENCAI
  • Bu Xiaowen
  • CHANG WUQIAN
  • GUAN DAYUAN
  • WANG BAO
  • XIANG XU
  • ZHOU LEI
  • BAI XIAOFENG
  • DU XIAODONG
  • LIU KANG
  • Long Tingyang
  • Xiao Zunchong
  • WANG YIFEI
  • CHAI ZHI
  • SHI WEIBING
  • HE HONGYUAN
  • GAO JUNWEI
  • QI JINBANG
  • CUI XIANGBING
  • PEI CHAO
  • LIU JUNSONG
  • LIU LONGHAI

Assignees

  • 中铁隧道局集团有限公司
  • 中铁隧道集团三处有限公司

Dates

Publication Date
20260508
Application Date
20260127

Claims (7)

  1. 1. Corridor trolley in immersed tube tunnel, characterized by comprising: The inner support frame comprises an inner support frame (2) and two inner side templates (1), wherein the two inner side templates (1) are respectively arranged at two sides of the inner support frame (2), the top parts of the two inner side templates (1) are respectively provided with a top plate structure (3), the top plate structures (3) horizontally extend to the upper part of the top part of the inner support frame (2), the top parts of the inner support frame (2) are provided with two groups of translation driving parts, the two groups of translation driving parts are in one-to-one correspondence with the two inner side templates (1), the translation driving parts are used for driving the corresponding inner side templates (1) to approach or separate from the inner support frame (2), the bottom part of the inner support frame (2) is provided with a jacking driving part, and the jacking driving part forces the inner support frame (2) and the inner side templates (1) to synchronously move upwards in a downward jacking mode and forces the inner support frame (2) and the inner side templates (1) to synchronously move downwards in a shrinkage mode; When the middle gallery is constructed, the jacking driving piece drives the inner supporting frame (2) to ascend and simultaneously drives the top plate structure (3) at the top of the inner side template (1) to be in position at the construction position at the top of the middle gallery, and the translation driving piece drives the inner side template (1) to move away from the inner supporting frame (2) so as to be in position at the construction positions at the two sides of the middle gallery and drive the upper inner side template (1) to be unfolded outwards and abutted to the inner wall of the adjacent immersed tube section; when the middle gallery construction is carried out, a plugging strip is arranged between the construction gaps (6), and the two top plate structures (3) at the top and the plugging strip form an inner top template for the middle gallery pouring construction, and form an inner mould structure for the middle gallery pouring construction together with the inner template (1); When demoulding, the inner side template (1) is driven to move towards the direction of the inner side supporting frame (2) by the translation driving piece to finish demoulding operation of the position of the inner side template (1), and the jacking driving piece is driven to move downwards and drive the inner side template (1) and the top plate structure (3) to move downwards integrally to finish demoulding operation of the position of the inner top template.
  2. 2. The gallery trolley in the immersed tube tunnel according to claim 1, wherein the inner supporting frame (2) comprises a plurality of frame units (23) which are distributed side by side along the depth direction of the middle gallery, and adjacent frame units (23) are spliced and fixed.
  3. 3. The immersed tube tunnel middle corridor trolley is characterized in that a plurality of first connecting lugs (11) are arranged on the inner side of the inner side template (1) at intervals along the middle corridor longitudinal direction, a plurality of second connecting lugs (21) are arranged on the top of the inner support (2) at intervals along the middle corridor longitudinal direction, the first connecting lugs (11) and the second connecting lugs (21) are in one-to-one correspondence, the translation driving piece comprises a plurality of horizontal hydraulic cylinders which are transversely arranged, the horizontal hydraulic cylinders are distributed at intervals along the middle corridor longitudinal direction, and the first connecting lugs (11) and the second connecting lugs (21) which are respectively corresponding to the two ends of the horizontal hydraulic cylinders are connected.
  4. 4. The gallery trolley in the immersed tube tunnel according to claim 1, wherein a plurality of transverse through grooves (22) are formed in the top of the inner supporting frame (2), the transverse through grooves (22) are distributed at intervals along the longitudinal depth direction of the middle gallery, a plurality of transverse square pipes (21) are arranged on the inner side of the inner side template (1), the transverse square pipes (21) are distributed at intervals along the longitudinal depth direction of the middle gallery, the transverse square pipes (21) are in one-to-one correspondence with the transverse through grooves (22) and are in sliding insertion fit, and the sliding direction of the transverse square pipes (21) is consistent with the telescopic direction of the horizontal hydraulic cylinder.
  5. 5. The gallery trolley in the immersed tube tunnel according to claim 1, wherein two ends of the inner supporting frame (2) are respectively provided with a vertical through pipe (4), vertical supporting legs (5) are vertically connected at the vertical through pipe (4) in a sliding mode, the vertical through pipe (4) is provided with a third connecting lug (41), the vertical supporting legs (5) are provided with a fourth connecting lug (51), the lifting driving piece is a vertical jack, and the upper end and the lower end of the vertical jack are respectively connected with the third connecting lug (41) and the fourth connecting lug (51) through the expansion and the contraction of the vertical jack so as to drive the vertical supporting legs (5) to slide up and down in the vertical through pipe (4).
  6. 6. A submerged pipe tunnel middle corridor trolley according to claim 3, wherein the inner side template (1) comprises a plurality of vertical plate units which are distributed side by side along the depth direction of the middle corridor, and adjacent vertical plate units are spliced in a sealing manner.
  7. 7. A submerged tunnel gallery trolley according to claim 6, characterized in that the first connecting lugs (11) are fixed between adjacent vertical plate units and serve as connectors for adjacent vertical plate units.

Description

Corridor trolley in immersed tube tunnel Technical Field The application relates to the field of immersed tube prefabrication construction, in particular to a gallery trolley in an immersed tube tunnel. Background Prefabricated immersed tube tunnels have found increasingly widespread use in recent years as an important traffic channel across water areas such as rivers, straits, and the like. The tunnel form not only can effectively solve the problem that traffic spans across a water area, but also has the advantages of small influence on surrounding environment, relatively short construction period and the like. With the continuous advancement of infrastructure construction, there is an increasing demand for prefabricated immersed tube tunnels, which are of increasing importance in traffic networks. The immersed tube is generally provided with two driving channels, and a middle corridor is arranged between the two driving channels, wherein the construction quality and efficiency of the middle corridor directly influence the construction progress and the service performance of the whole immersed tube tunnel. In gallery construction in a prefabricated immersed tube tunnel, conventionally, two modes of a wood template and a steel template are often adopted for concrete pouring molding. The wood form is typically formed by splicing boards, which are secured to a pre-built support frame by nails or bolts to form the form structure. The steel templates are welded or assembled into specific shapes by adopting steel plates, and are mounted on the supporting structure by utilizing special clamps and connecting pieces, so that the forming support of the centering gallery concrete is realized. These methods meet to some extent the basic requirements of the construction of the middle corridor, but also have respective characteristics and limitations. However, these prior template assemblies suffer from a number of significant drawbacks. The wooden template is easy to be damped and deformed, so that the template structure is unstable, the molding precision of the post-pouring strip is difficult to ensure, and the construction quality of the middle corridor is further influenced. The steel template is high in strength, but heavy in weight, and the installation and disassembly processes are complicated, so that the construction difficulty and the construction time cost are increased, and the construction efficiency is not improved. Disclosure of Invention In order to reduce construction difficulty and time cost, the application provides a gallery trolley in a immersed tube tunnel. The gallery trolley in the immersed tube tunnel provided by the application adopts the following technical scheme: The gallery trolley in the immersed tube tunnel comprises an inner support frame and two inner side templates, wherein the two inner side templates are respectively arranged at two sides of the inner support frame, the top parts of the two inner side templates are respectively provided with a top plate structure, the top plate structures horizontally extend to the upper part of the top part of the inner support frame, the top part of the inner support frame is provided with two groups of translation driving parts, the two groups of translation driving parts are in one-to-one correspondence with the two inner side templates, and the translation driving parts are used for driving the corresponding inner side templates to approach or separate from the inner support frame in the direction of the inner support frame; When the middle gallery is constructed, the jacking driving piece drives the inner supporting frame to ascend, and simultaneously drives the top plate structure at the top of the inner side template to be in position at the construction position of the top of the middle gallery, and the translation driving piece drives the inner side template to move in the direction away from the inner supporting frame so as to be in position at the construction positions at the two sides of the middle gallery, so that the upper inner side template is driven to be outwards unfolded and abutted to the inner wall of the adjacent immersed tube section; when the middle corridor is constructed, a plugging strip is arranged between the construction gaps, and the two top plate structures at the top and the plugging strip form an inner top template for middle corridor pouring construction, and form an inner mold structure for middle corridor pouring construction together with the inner template; When demoulding, the translation driving piece drives the inner side template to move towards the direction of the inner side supporting frame so as to finish demoulding operation of the inner side template position, and the jacking driving piece drives the inner supporting frame to move downwards and drives the inner side template and the top plate structure to move downwards integrally so as to finish demoulding operation of the inner top template positio