The invention discloses a double-side formwork integrated shear wall based on a truss reinforcement cage and a construction method thereof, wherein the double-side formwork integrated shear wall comprises two formwork plates, a plurality of truss framework units arranged between the two formwork plates, a plurality of trough bottoms on one side of each spoke rib are connected with the central connecting rod, the four spoke ribs are arranged along the circumferential direction of the central connecting rod, a plurality of peak tops on the other side of each spoke rib are buried in the formwork plates, lateral ribs are connected to the middle parts of the spoke ribs, connecting ribs are connected to the lateral ribs of the truss framework units, and cast-in-place concrete is poured between the two formwork plates and coated on the truss framework units and the connecting ribs. The invention solves the problem of insufficient connection stability of the shear wall of the traditional shuttering system.
Inventors
- JI WEI
- YE XIAOSONG
- LIAN CHUNMING
- WEN WEIJUN
- CUI CAN
- YU JIRUI
- Huo Zerui
- FANG XUEFEI
- WANG SUZHEN
- MA HAIFENG
Assignees
- 中建八局科技建设有限公司
Dates
- Publication Date
- 20260508
- Application Date
- 20260325
Claims (5)
- 1. Double-sided formwork integrated shear wall based on truss reinforcement cage, which is characterized by comprising: the two mould shell plates are oppositely arranged; The truss framework units are arranged between the two formwork plates and comprise a central connecting rod and four spoke ribs, the spoke ribs are wavy, the bottoms of the valleys on one side of each spoke rib are connected with the central connecting rod, the four spoke ribs are arranged along the circumferential direction of the central connecting rod, the peak tops on the other side of each spoke rib are buried in the formwork plates, and the middle parts of the spoke ribs are connected with lateral ribs; the connecting ribs are connected with lateral ribs of a plurality of truss framework units; Cast-in-place concrete is poured between the two mould shell plates and is coated on the truss framework units and the connecting ribs.
- 2. The double-sided formwork integrated shear wall based on truss reinforcement cage of claim 1, wherein peak portions of two of the spoke ribs are buried in one formwork panel and peak portions of the other two spoke ribs are buried in the other formwork panel.
- 3. The double-sided formwork integrated shear wall based on a truss reinforcement cage according to claim 1, wherein the spoke ribs comprise a plurality of U-shaped sections and a plurality of V-shaped sections, the U-shaped sections and the V-shaped sections are alternately arranged, two limbs of the V-shaped sections are respectively connected to one limb of the two U-shaped sections, the ends of the two limbs of the U-shaped sections and the V-shaped sections are buried in the formwork plate, and the closed ends of the V-shaped sections are connected to the central link rod.
- 4. A double sided formwork integrated shear wall based on truss reinforcement cage as in claim 3, wherein the U-shaped sections are disposed along the deck direction of the formwork panels.
- 5. A construction method of the double-sided formwork integrated shear wall based on the truss reinforcement cage according to any one of claims 1 to 4, comprising the following steps: Prefabricating two mould shell plates, arranging a plurality of truss framework units between the two mould shell plates, and burying a plurality of peak tops on the other side of spoke ribs of the truss framework units in the mould shell plates; hoisting the prefabricated two mould shell plates to the installation position; connecting the connecting ribs to lateral ribs of a plurality of truss framework units; pouring cast-in-place concrete between the two formwork plates, so that the cast-in-place concrete is coated on the truss framework units and the connecting ribs to be solidified to form the double-side formwork integrated shear wall based on the truss reinforcement framework.
Description
Double-side formwork integrated shear wall based on truss reinforcement cage and construction method thereof Technical Field The invention relates to the technical field of shear walls, in particular to a double-side formwork integrated shear wall based on a truss reinforcement cage and a construction method thereof. Background The traditional shear wall construction method generally comprises the links of formwork support, reinforcement bar binding, concrete pouring, formwork removal and the like, and has the problems of multiple working procedures, long construction period, high labor intensity, dependence on manual construction precision and the like. In recent years, a construction method of a shear wall adopting a formwork system is gradually applied, and the formwork is used as a permanent formwork to realize the formwork removal-free construction, so that the construction efficiency is remarkably improved. However, the prior art formwork systems often employ separate connectors or rigid fasteners to connect the two-sided formwork, which has the following drawbacks: 1. the connection stability is not enough, namely, in the concrete pouring process, the double-side shuttering is positioned only by virtue of the point-shaped connecting pieces, the integral rigidity cannot be formed, and the double-side shuttering is easy to deform due to pouring pressure. 2. The reinforcement cage has strong independence, the reinforcement cage is installed and separated from the formwork in the existing formwork system, the construction links are increased, and the integrity is insufficient. 3. The adjustment capability is poor, and the traditional method can not realize the integrated positioning of the double-side shuttering and the steel reinforcement framework, and the control of the thickness and the verticality of the wall is affected. Disclosure of Invention In order to overcome the defects existing in the prior art, the invention provides a double-side formwork integrated shear wall based on a truss reinforcement cage and a construction method thereof, so as to solve the problem of insufficient connection stability of the shear wall of the traditional formwork system. To achieve the above object, a double-sided formwork integrated shear wall based on truss reinforcement cage is provided, comprising: the two mould shell plates are oppositely arranged; The truss framework units are arranged between the two formwork plates and comprise a central connecting rod and four spoke ribs, the spoke ribs are wavy, the bottoms of the valleys on one side of each spoke rib are connected with the central connecting rod, the four spoke ribs are arranged along the circumferential direction of the central connecting rod, the peak tops on the other side of each spoke rib are buried in the formwork plates, and the middle parts of the spoke ribs are connected with lateral ribs; the connecting ribs are connected with lateral ribs of a plurality of truss framework units; Cast-in-place concrete is poured between the two mould shell plates and is coated on the truss framework units and the connecting ribs. Further, the peak top parts of two spoke ribs are buried in one mold shell plate, and the peak top parts of the other two spoke ribs are buried in the other mold shell plate. Further, the spoke rib comprises a plurality of U-shaped sections and a plurality of V-shaped sections, the U-shaped sections and the V-shaped sections are alternately arranged, two limbs of the V-shaped sections are respectively connected to two limbs of the U-shaped sections, the ends of the U-shaped sections and the two limbs of the V-shaped sections are buried in the mould shell plate, and the closed ends of the V-shaped sections are connected to the central link rod. Further, the U-shaped section is arranged along the plate surface direction of the mold shell plate. The invention provides a construction method of a double-side formwork integrated shear wall based on a truss reinforcement cage, which comprises the following steps: Prefabricating two mould shell plates, arranging a plurality of truss framework units between the two mould shell plates, and burying a plurality of peak tops on the other side of spoke ribs of the truss framework units in the mould shell plates; hoisting the prefabricated two mould shell plates to the installation position; connecting the connecting ribs to lateral ribs of a plurality of truss framework units; pouring cast-in-place concrete between the two formwork plates, so that the cast-in-place concrete is coated on the truss framework units and the connecting ribs to be solidified to form the double-side formwork integrated shear wall based on the truss reinforcement framework. The double-sided formwork integrated shear wall based on the truss reinforcement cage has the beneficial effects that the overall rigidity of the double-sided formwork integrated shear wall based on the truss reinforcement cage is high. The truss framew