CN-121998440-A - Engineering project cost data management system

CN121998440ACN 121998440 ACN121998440 ACN 121998440ACN-121998440-A

Abstract

The invention discloses a project cost data management system, which comprises a template module, an input module, a central processing unit, a comparison module, a correction module, a period prediction module, a cost budget module, a settlement module, a project file management module, a reminding module, a data storage module and a transmission module, and has the beneficial effects that when the input module transmits data such as project raw materials, equipment, a planning chart and the like to the central processing unit, the central processing unit modifies and changes aspects such as construction scale, structural property, equipment type and the like by utilizing a data correction program through the correction module, and a preliminary design general calculation is correspondingly adjusted; the project file management method comprises the steps of predicting a project finishing period through a period prediction module, predicting and estimating all costs of a construction project through a cost budget module by using a budget program, settling finished project prices through a settlement module by using a settlement program, and managing project files through a project file management module by using a file management program.

Inventors

  • GAN JIAHONG
  • Wu Chude
  • WEI LI

Assignees

  • 海南华造项目管理有限公司

Dates

Publication Date
20260508
Application Date
20240223

Claims (10)

  1. 1. The utility model provides an engineering project cost data management system, its characterized in that includes template module (1), input module (2), central processing unit (3), comparison module (4), correction module (5), cycle prediction module (6), cost budget module (7), settlement module (8), project archives management module (9), warning module (10), data storage module (11) and transmission module (12), template module (1) with input module (2) are connected, input module (2) are connected with central processing unit (3), central processing unit (3) with comparison module (4), correction module (5), cycle prediction module (6), cost budget module (7), settlement module (8), project archives management module (9), warning module (10), data storage module (11) and transmission module (12) are connected.
  2. 2. The engineering project cost data management system according to claim 1, wherein the central processing unit (3) is further connected with an abnormal data marking module (13), and when the influence information or the sampling inspection information and the standard of the engineering design model diagram are abnormal, the abnormal data marking module (13) marks the influence information or the sampling inspection information with the abnormality.
  3. 3. An engineering project cost data management system according to claim 2, wherein the central processing unit (3) is further connected with a setting module (14), and the setting module (14) is connected with both the project progress display module (15) and the time module (16).
  4. 4. A construction project cost data management system according to claim 3, characterized in that the setting module (14) is adapted to set the finishing time of each project in the project, the time module (16) is adapted to record the finishing time of each project, and the period prediction module (6) is adapted to predict the finishing period of the project.
  5. 5. The engineering project cost data management system according to claim 4, wherein the template module (1) is used for storing data of standard engineering design drawings and materials, and the input module (2) is used for conveying engineering raw materials, equipment, planning drawings and the like to the central processing unit (3).
  6. 6. The engineering project cost data management system according to claim 5, wherein the comparison module (4) is configured to compare the newly uploaded impact information or the spot check information with the impact information or the spot check information stored in the data storage module (11), if yes, remind a monitor person who uploads the impact information or the spot check information through the reminding module (10), and if no, save the impact information or the spot check information to the data storage module (11).
  7. 7. The project cost data management system of claim 6, wherein the correction module (5) is configured to modify and change the construction scale, the structural property, the equipment type, etc. through the data correction program, and the preliminary design approximation is adjusted accordingly.
  8. 8. The project cost data management system according to claim 7, wherein the cost budget module (7) is configured to predict and estimate total costs incurred for a construction project by a budget program, and the settlement module (8) is configured to settle a completed project cost by a settlement program.
  9. 9. The project cost data management system according to claim 8, wherein the project archive management module (9) is configured to manage project archives through an archive management program, and the reminding module (10) is configured to send out early warning for the anomaly information transmitted by the comparison module (4), the anomaly data marking module (13) and the time module (16).
  10. 10. The engineering project cost data management system according to claim 9, wherein the data storage module (11) is configured to store the collected engineering data, correction data, budget data and settlement data through the memory, and the transmission module (12) is configured to transmit and receive signals to mobile devices such as a mobile phone and a usb disk.

Description

Engineering project cost data management system Technical Field The invention relates to the technical field of engineering cost, in particular to an engineering project cost data management system. Background The construction cost refers to the construction price of a project, and refers to the sum of all the fees expected or actually required for completing the construction of one project. At present, the cost budget, bid quotation and settlement audit of most projects in China are based on the periodic release of market prices, adjustment indexes, project cost and preliminary design project quantity list of various materials by the cost management departments of various provinces, cities and autonomous regions, and are manually collected and summarized by cost personnel. However, the data of each engineering cost is huge, the basis for influencing the engineering cost is found out from a large amount of data and data, and most of working time and energy of personnel of the company cost are required to be occupied. Meanwhile, the manual collection of data and data is easy to lose, so that the accuracy of the cost analysis data is affected, and the fairness and scientificity of the cost level analysis are affected. In summary, how to provide a project cost data management system is a technical problem that needs to be solved at present. Disclosure of Invention The technical task of the invention is to provide a project cost data management system for solving the problems mentioned in the background art aiming at the defects. The technical scheme of the invention is realized as follows: The utility model provides an engineering project cost data management system, includes template module, input module, central processing unit, comparison module, correction module, cycle prediction module, cost budget module, settlement module, project archives management module, reminds module, data storage module and transmission module, the template module with the input module is connected, the input module is connected with central processing unit, central processing unit with comparison module correction module, cycle prediction module cost budget module settlement module project archives management module reminding module data storage module and transmission module connects. Preferably, the central processing unit is further connected with an abnormal data marking module, and when the influence information or the spot check information and the standard of the engineering design model diagram are abnormal, the abnormal data marking module marks the influence information or the spot check information with the abnormality. Preferably, the central processing unit is also connected with a setting module, and the setting module is connected with the project progress display module and the time module. Preferably, the setting module is used for setting the finishing time of each project in the project, the time module is used for recording the finishing time of each project, and the period prediction module is used for predicting the finishing period of the project. Preferably, the template module is used for storing data of standard engineering design drawings and materials, and the input module is used for conveying engineering raw materials, equipment, planning drawings and other data to the central processing unit. Preferably, the comparison module is used for comparing the newly uploaded influence information or the sampling inspection information with the influence information or the sampling inspection information stored in the data storage module, if the influence information or the sampling inspection information is identical to the sampling inspection information, the reminding module is used for reminding monitoring personnel uploading the influence information or the sampling inspection information, and if the influence information or the sampling inspection information is not identical to the sampling inspection information, the influence information or the sampling inspection information is stored in the data storage module. Preferably, the correction module is used for modifying and changing the aspects of construction scale, structural property, equipment type and the like through a data correction program, and the preliminary design general calculation is correspondingly adjusted. Preferably, the cost budget module is used for predicting and estimating all the cost of the construction project through a budget program, and the settlement module is used for settling the cost of the finished project through a settlement program. Preferably, the project archive management module is used for managing project archives through an archive management program, and the reminding module is used for giving out early warning to the abnormal information transmitted by the comparison module, the abnormal data marking module and the time module. Preferably, the data storage module is used for storing the collected engineeri