Search

CN-121998557-A - Shuttle vehicle task allocation scheduling method, vertical library system and computer storage medium

CN121998557ACN 121998557 ACN121998557 ACN 121998557ACN-121998557-A

Abstract

The invention discloses a shuttle task allocation and scheduling method, a vertical library system and a computer storage medium, wherein the shuttle task allocation and scheduling method comprises the steps of obtaining task information of target goods and determining target grids based on the task information; the method comprises the steps of determining a target shuttle with the shortest path from a target grid based on the positions of the target grid and the shuttle in a goods shelf, locking the target shuttle, distributing task information of target goods to the target shuttle, determining that the target shuttle is in a first preset state, driving the target shuttle to convey the target goods, and unlocking the target shuttle. The invention can accelerate the picking speed, optimize the picking process and improve the sorting efficiency.

Inventors

  • ZHANG JIAJI
  • WANG JIE
  • Duan Xianjiao

Assignees

  • 上海欣巴自动化科技股份有限公司

Dates

Publication Date
20260508
Application Date
20260410

Claims (9)

  1. 1. The method for dispatching the allocation of the shuttle vehicle tasks is applied to a vertical warehouse system, the vertical warehouse system comprises a plurality of shuttle vehicles and a goods shelf, the goods shelf comprises a plurality of grid openings, each grid opening is used for containing goods, and the shuttle vehicles are used for bearing the goods and move relative to the goods shelf to convey the goods, and the method for dispatching the allocation of the shuttle vehicle tasks is characterized by comprising the following steps: Acquiring task information of a target cargo, and determining a target grid port based on the task information; Determining a target shuttle with the shortest path from the target grid port based on the positions of the target grid port and the shuttle in the goods shelf; Locking the target shuttle, and distributing task information of the target goods to the target shuttle; Determining that the target shuttle is in a first preset state, and driving the target shuttle to convey the target goods, wherein the first preset state at least indicates that the target shuttle is not in a low-power state; and unlocking the target shuttle.
  2. 2. The method of claim 1, wherein the plurality of shuttles form a shuttle consist, the plurality of gates form a gate set, and the determining the target shuttle having the shortest path from the target gate based on the target gate and the position of the shuttle in the rack comprises: determining that at least one shuttle in the shuttle consist is in an unlocked state; determining a target shuttle with the shortest path from the target grid according to the path length of at least one shuttle in an unlocking state from the target grid in the shuttle car group; the unlocked state at least indicates that the shuttle is not assigned a task.
  3. 3. The method of claim 1, wherein the plurality of shuttles form a plurality of shuttle groups, the plurality of gates form a plurality of gate groups, the plurality of shuttle groups are in one-to-one correspondence with the plurality of gate groups, and the determining the target shuttle with the shortest path to the target gate based on the target gate and the position of the shuttle in the rack comprises: determining a shuttle car group corresponding to a cell group of the target cell; determining that at least one shuttle in the shuttle consist is in an unlocked state; determining a target shuttle with the shortest path from the target grid according to the path length of at least one shuttle in an unlocking state from the target grid in the shuttle car group; the unlocked state at least indicates that the shuttle is not assigned a task.
  4. 4. The method of claim 3, wherein determining the target shuttle that has the shortest path from the target bay based on the target bay and the position of the shuttle in the rack comprises: determining a shuttle car group corresponding to a cell group of the target cell; determining that at least one shuttle in the shuttle consist is in an unlocked state; Determining that at least one shuttle in the shuttle consist is in a locked state; Determining a target shuttle with the shortest path from the target grid according to the path length from at least one shuttle in an unlocking state to the target grid in the shuttle group and the path length from the task grid of at least one shuttle in a locking state to the target grid in the shuttle group; The locked state at least indicates that the shuttle has been assigned a task.
  5. 5. The shuttle task allocation scheduling method according to claim 1, wherein the shelf further comprises a charging layer, the charging layer comprising a plurality of charging bits arranged at intervals: The shuttle task allocation scheduling method further comprises the following steps: determining that the shuttle is in an unlocking state; determining that the shuttle is in a second preset state, driving the shuttle to move to a charging level of the charging layer, and locking the target shuttle; The second preset state at least indicates that the shuttle is in a low battery state.
  6. 6. The method for assigning and scheduling a shuttle task according to claim 5, further comprising: determining that the shuttle vehicle is located at the charging position; determining that the shuttle is in a third preset state, unlocking the target shuttle, and driving the shuttle to move to a preset point; The third preset state at least represents that the shuttle is in a high-power state.
  7. 7. A vertical warehouse system, comprising: the goods shelf comprises a plurality of grids, wherein each grid is used for accommodating goods; the transport unit is used for carrying goods and taking the goods out of the grid openings or storing the goods in the grid openings; The upper computer is respectively connected with the plurality of shuttles and is used for executing the shuttle task allocation scheduling method according to any one of claims 1 to 6.
  8. 8. A computer storage medium comprising a memory adapted to store computer instructions and a processor adapted to perform the shuttle task allocation scheduling method of any one of claims 1 to 6 when the computer instructions are executed.
  9. 9. A computer program product comprising computer programs/instructions which when executed by a processor implement the shuttle task allocation scheduling method of any one of claims 1 to 6.

Description

Shuttle vehicle task allocation scheduling method, vertical library system and computer storage medium Technical Field The invention relates to the technical field of logistics, in particular to a shuttle task allocation and scheduling method, a vertical warehouse system and a computer storage medium. Background In recent years, with the rapid development of intelligent manufacturing enterprises, the application and management of logistics systems are becoming more important. The shuttle vehicles used in the material warehouse are, for example, RGV trolleys (Rail Guided Vehicle, rail guided vehicles), and can carry logistics, but the path planning and task scheduling technology of the plurality of shuttle vehicles are key factors affecting the current sorting efficiency. However, the current solution has many disadvantages, such as the inability to effectively cope with complex scheduling tasks, the realization of dynamic scheduling in the process, and the low handling efficiency, and the current path planning algorithm usually plans the shortest cargo access path for a single shuttle. Therefore, a method for allocating and scheduling the shuttle tasks and a vertical library system are needed, which can realize real-time docking with a production execution system, support dynamic scheduling of complex scheduling tasks of a plurality of shuttles, and improve the handling efficiency, thereby meeting the requirement of efficient scheduling. Disclosure of Invention The invention aims to solve the problems that the existing method for dispatching the task allocation of the vertical warehouse shuttle cannot realize the dynamic dispatching and the low sorting efficiency of a plurality of shuttles. The invention provides a shuttle task allocation and scheduling method, a vertical warehouse system and a computer storage medium, which can accelerate picking speed, optimize picking flow and improve sorting efficiency. In order to solve the above technical problems, an embodiment of the present invention discloses a method for dispatching a shuttle task, which is applied to a vertical warehouse system, wherein the vertical warehouse system includes a plurality of shuttles and shelves, the shelves include a plurality of ports, each port is used for accommodating goods, the shuttles are used for carrying goods and move relative to the shelves to convey goods, and the method for dispatching the shuttle task includes: Acquiring task information of a target cargo, and determining a target grid port based on the task information; Determining a target shuttle with the shortest path from the target grid port based on the positions of the target grid port and the shuttle in the goods shelf; Locking the target shuttle, and distributing task information of the target goods to the target shuttle; Determining that the target shuttle is in a first preset state, and driving the target shuttle to convey the target goods, wherein the first preset state at least indicates that the target shuttle is not in a low-power state; and unlocking the target shuttle. By adopting the technical scheme, the shuttle task allocation scheduling method of the embodiment of the application determines the position of the target lattice in the goods shelf indicated in the task information according to the task information of the goods, and selects the target shuttle with the shortest moving path away from the target lattice from the plurality of shuttles in the shuttle group according to the real-time positions of the plurality of shuttles in the shuttle group, binds the task information of the goods with the target shuttle, so as to avoid the condition of deadlock or no-load caused by repeated task allocation, monitors the state of the shuttles, ensures the sufficient electric quantity of each shuttle, ensures the stability of goods sorting in the vertical warehouse system of the embodiment of the application, completes the whole process by depending on an upper computer and the shuttles without manual sorting, saves labor cost, improves efficiency, simultaneously can more efficiently optimize the path planning of the shuttles, quickens, optimizes the sorting process, and improves sorting efficiency. In an exemplary embodiment, the fact that the shuttle is in the first preset state at least indicates that the electric quantity of the shuttle is higher than a first preset value, that is, the shuttle is not in a low-electric-quantity state, and the shuttle does not need to be moved to a charging position to charge, so that the upper computer determines that the shuttle is in a standby state. According to another embodiment of the present invention, an embodiment of the present invention discloses a method for allocating and scheduling a task of a shuttle, where the plurality of shuttles form a shuttle car group, the plurality of gates form a gate group, and determining, based on positions of a target gate and a shuttle in the rack, a target shuttle having a