Abstract

The invention relates to the technical field of engineering cost, in particular to an engineering cost recording method, which comprises the following steps of S1, carrying out real-time monitoring on the progress of engineering cost by means of an engineering cost recording device, S2, recording the observed progress in time by means of the engineering cost recording device after the progress change is observed in real time, S3, judging the specific type of engineering cost by means of the real-time monitoring of the engineering cost recording device, and then selectively recording, wherein the engineering cost recording method in S1 comprises a machine base, wherein support foot frames are fixedly arranged at two ends of the bottom of the machine base, an adjusting mechanism is arranged on the machine base, a cleaning mechanism is arranged on a panel, the device cleans the handwriting on the surface of the panel by means of cotton blocks on a radial plate after the progress change is recorded, and the motor drives an incomplete gear to rotate, so that the handwriting is automatically cleaned.

Inventors

  • PENG ZHAOHUI
  • ZHAO JIGUANG
  • WANG CHUN
  • YANG BIN
  • LIU JIN
  • LI MIN

Assignees

  • 李敏

Dates

Publication Date
20260512
Application Date
20230529

Claims (10)

  1. 1. The engineering cost recording method is characterized by comprising the following steps: s1, monitoring the progress of the engineering cost in real time by means of an engineering cost recording device; S2, after the change of the progress is observed in real time, the observed progress is recorded in time by a project cost recording device, and the progress of the project cost in two aspects can be recorded; S3, judging the specific type of the engineering cost through real-time monitoring of an engineering cost recording device, selectively recording, erasing recorded contents through the device after recording is completed, and enabling a recording area of an engineering cost recording method to be in a brand new state for next recording; The engineering cost recording method in S1 includes frame (1), frame (1) bottom both ends are all fixed mounting has supporting foot rest (2), its characterized in that, install adjustment mechanism on frame (1), still include carrier plate (3), carrier plate (3) one side is provided with two symmetrically distributed' S panel (4), panel (4) are the blackboard material, carrier plate (3) bottom fixed mounting has connecting seat (5), connecting seat (5) link to each other with adjustment mechanism, be provided with clearance mechanism on panel (4).
  2. 2. The construction cost recording method according to claim 1, wherein the bottoms of the supporting foot frames (2) are provided with anti-slip gaskets.
  3. 3. The engineering cost recording method according to claim 1, wherein the cleaning mechanism comprises a driving shaft (6), the carrier plate (3) is arranged as a round plate, the driving shaft (6) is rotatably installed at the center of the carrier plate (3), a radial plate (7) is fixedly installed at the end part of the driving shaft (6), the radial plate (7) is distributed along the diameter direction of the carrier plate (3), two symmetrically distributed mounting plates (8) are fixedly installed at one side of the radial plate (7) facing the carrier plate (3), cotton blocks (9) are fixedly installed at one side of the two mounting plates (8) facing the carrier plate (3), and the cotton blocks (9) can be contacted with the panel (4).
  4. 4. A construction cost recording method according to claim 3, characterized in that the cleaning mechanism further comprises a driving assembly, the driving assembly comprises a connecting shaft (10), the connecting shaft (10) is rotatably arranged on the back side of the panel (4), the connecting shaft (10) penetrates through the panel (4), the connecting shaft (10) is fixedly connected with the driving shaft (6), a first gear (11) is fixedly arranged at the end part of the connecting shaft (10), a first motor (12) is fixedly arranged on the panel (4), an incomplete gear (13) is fixedly arranged at the output shaft end of the first motor (12), the incomplete gear (13) can be meshed with the first gear (11), and a dust cover is arranged on the first motor (12).
  5. 5. The engineering cost recording method according to claim 3, wherein two symmetrically distributed penetrating grooves (14) are formed in the panel (4), the penetrating grooves (14) penetrate through the panel (4), two symmetrically distributed penetrating grooves (14) are formed in the penetrating grooves (14), clamping grooves (15) are formed in two sides of the penetrating grooves (14), the engineering cost recording method further comprises two movable seats (16), the movable seats (16) are respectively arranged in the penetrating grooves (14), side blocks (17) are fixedly arranged on two sides of the movable seats (16), the side blocks (17) are respectively arranged in the clamping grooves (15) in a sliding mode, a plurality of equally distributed atomizing nozzles (18) are fixedly arranged on the movable seats (16) on the upper side, the atomizing nozzles (18) face the cotton block (9), pipelines (19) are fixedly arranged on the movable seats (16) on the upper side, the pipelines (19) penetrate through the movable seats (16) and are communicated with the plurality of atomizing nozzles (18), the water draining pipe (20) is fixedly arranged on the movable seats (16) on the upper side, and the water draining pipe (20) is communicated with the water inlet pipe (20).
  6. 6. The construction cost recording method according to claim 5, wherein a plurality of groups of two side plates (21) which are arranged at intervals are fixedly arranged on the movable seat (16) at the lower side, a first rotating shaft (22) is rotatably arranged between the two side plates (21), a second cam post (23) is fixedly arranged on each first rotating shaft (22), brush teeth are arranged on the surface of each cam post (23), one end of each first rotating shaft (22) penetrates through the side plate (21), a second gear (24) is fixedly arranged at the end part of each first rotating shaft (22), a third gear (25) is rotatably arranged between the two adjacent second gears (24), the third gear (25) is meshed with the two second gears (24) at the two adjacent sides, a driving wheel (26) is fixedly arranged at the end part of each first rotating shaft (22) at one end, a second motor (27) is fixedly arranged on the movable seat (16), a driving wheel (28) is fixedly arranged at the output shaft end of each second motor (27), the driving wheel (28) is meshed with the driving wheel (26), a guide groove (29) is fixedly arranged on the movable seat (16) at the lower side, an air inlet channel (30) is fixedly connected with the air channel (30), the diversion trench (31) is arranged towards the cam posts (23).
  7. 7. The construction cost recording method according to claim 6, further comprising a step-by-step driving mechanism mounted on the panel (4) and connected to the two movable seats (16).
  8. 8. The engineering cost recording method according to claim 7, wherein the step-by-step driving mechanism comprises a first reciprocating screw (32), the first reciprocating screw (32) is rotatably mounted on the panel (4), the first reciprocating screw (32) penetrates through the movable seat (16) located at the upper side and is in threaded connection with the movable seat (16) located at the upper side, a second rotating shaft (33) is rotatably mounted on the panel (4), the second rotating shaft (33) is fixedly connected with the lower end of the first reciprocating screw (32), a first driven wheel (34) is fixedly mounted at the lower end of the second rotating shaft (33), a second reciprocating screw (35) is rotatably mounted on the panel (4), the second reciprocating screw (35) penetrates through the movable seat (16) located at the lower side and is in threaded connection with the movable seat (16) located at the lower side, a third rotating shaft (36) is rotatably mounted on the panel (4), and the second driven wheel (37) is fixedly mounted at the upper end of the third rotating shaft (36).
  9. 9. The engineering cost recording method according to claim 8, wherein the step-by-step driving mechanism further comprises an oil cylinder (38), the oil cylinder (38) is fixedly installed on the panel (4), a movable frame (39) is fixedly installed at the output end of the oil cylinder (38), a servo motor (40) is fixedly installed on the movable frame (39), a gear IV (41) is fixedly installed at the output end of the servo motor (40), and the gear IV (41) can be meshed with the driven wheel I (34) and the driven wheel II (37).
  10. 10. The engineering cost recording method according to claim 1, wherein the back side of the panel (4) is fixedly provided with a storage box, the adjusting mechanism comprises a lower bracket (42), the lower bracket (42) is arranged at the upper end of the base (1), a rotating column (43) is rotatably arranged on the lower bracket (42), the rotating column (43) is fixedly connected with the connecting seat (5), one end of the rotating column (43) is fixedly provided with a disc (44), the disc (44) is provided with a plurality of limit bolts (48), the limit bolts (48) penetrate through the disc (44) and are in threaded connection with the lower bracket (42), guide rods (45) are fixedly arranged at two ends of the bottom of the lower bracket (42), the lower end of each guide rod (45) penetrates through the base (1), a screw (46) is rotatably arranged on the base (1), the upper end of each screw (46) penetrates through the lower bracket (42) and is in threaded connection with the lower bracket (42), the bottom of the base (1) is fixedly provided with a motor output shaft (47), and the motor output shaft (47) is fixedly connected with the screw (46).

Description

Engineering cost recording method Technical Field The invention relates to the technical field of engineering cost, in particular to an engineering cost recording method. Background The utility model relates to a project cost recording method with the prior application number of CN210062453U, which comprises a bottom plate, a buckle, a movable page, a connecting plate, a pressing block, a positioning rod, a protective plate, recording paper and a fixing device, wherein the fixing device is arranged, when the pen is to be fixed, the fixing block is pulled to drive the second clamping block to move, the second clamp splice slides at the slide rail through the slider, and the second clamp splice presses the spring of guide pillar upper end simultaneously, makes the spring shrink, places the pen in first clamp splice and second clamp splice inboard simultaneously, and the fixed block is loosened next, and the spring is through resume deformation, drives the second clamp splice and presss from both sides tightly the pen to fix the pen through the elastic potential energy of spring, reached and to stabilize the fixing of pen, made the pen can not drop the advantage of losing. Because the handwriting on the recording board in actual recording needs to be cleaned manually frequently by an operator, the operator is in direct contact with chalk dust in the manual cleaning process, and further the physical health of the operator is endangered, and therefore, the engineering cost recording method is provided. Disclosure of Invention The invention aims to solve the defect that handwriting on a recording plate in the prior art needs to be cleaned manually frequently by an operator, and the operator is in direct contact with chalk dust in the manual cleaning process, so that the physical health of the operator is endangered. In order to achieve the above purpose, the present invention adopts the following technical scheme: a project cost recording method is designed, which comprises the following steps: s1, monitoring the progress of the engineering cost in real time by means of an engineering cost recording device; S2, after the change of the progress is observed in real time, the observed progress is recorded in time by a project cost recording device, and the progress of the project cost in two aspects can be recorded; S3, judging the specific type of the engineering cost through real-time monitoring of an engineering cost recording device, selectively recording, erasing recorded contents through the device after recording is completed, and enabling a recording area of an engineering cost recording method to be in a brand new state for next recording; The engineering cost recording method in S1 comprises a machine base, wherein supporting foot frames are fixedly arranged at two ends of the bottom of the machine base, an adjusting mechanism is arranged on the machine base, the engineering cost recording method further comprises a carrier plate, two symmetrically distributed panels are arranged on one side of the carrier plate, the panels are made of blackboard materials, a connecting seat is fixedly arranged at the bottom of the carrier plate, the connecting seat is connected with the adjusting mechanism, and a cleaning mechanism is arranged on the panels. Further, the bottoms of the supporting foot frames are provided with anti-slip gaskets. Further, the cleaning mechanism comprises a driving shaft, the carrier plate is arranged to be a round plate, the driving shaft is rotatably arranged at the position of the circle center of the carrier plate, a radial plate is fixedly arranged at the end part of the driving shaft, the radial plate is distributed along the diameter direction of the carrier plate, two symmetrically distributed mounting plates are fixedly arranged at one side of the radial plate, two cotton blocks are fixedly arranged at one side of the mounting plates, facing the carrier plate, of the mounting plates, and the cotton blocks can be in contact with the panel. Further, the cleaning mechanism further comprises a driving assembly, the driving assembly comprises a connecting shaft, the connecting shaft is rotatably arranged on the back side of the panel, the connecting shaft penetrates through the panel, the connecting shaft is fixedly connected with the driving shaft, a first gear is fixedly arranged at the end part of the connecting shaft, a first motor is fixedly arranged on the panel, an incomplete gear is fixedly arranged at the end of an output shaft of the first motor, the incomplete gear can be meshed with the first gear, and a dust cover is arranged on the first motor. Further, set up two symmetric distributions's wearing groove on the panel, wear the groove and run through the panel, two wear groove symmetric distribution, wear the draw-in groove has all been seted up to inslot both sides, still include two movable seats, the movable seat sets up respectively in wearing the inslot, the equal fixed