CN-122009861-A - Accurate alignment and efficient exhaust operation method for wagon of wagon dumper
Abstract
The invention discloses a precise alignment and efficient air exhaust operation method of a wagon dumper, which comprises the following steps of a wagon preparation stage, a second efficient integrated air exhaust, pipe picking and hook jump prevention operation, namely a row, picking and pulling three-step method, a third precise alignment command method of a wagon adjuster, namely a station, pressing, lifting and lifting four-step method, and a fourth and locomotive driver cooperative operation flow, namely a six-step method. The invention adopts the combination of concentrated exhaust, quick pipe removal and hook jump prevention pre-operation, breaks through the traditional vehicle-by-vehicle operation mode, integrates scattered operation into coherent operation, and greatly improves the operation consistency and efficiency. The invention can solve the problems of complicated operation flow, long time consumption and low alignment precision of the traditional distributed operation mode.
Inventors
- Mao Feiwei
- LI GANG
- LIU WEIJING
- LIN CHUNYAN
- WU JINGFENG
- LIANG LANJI
- LIN JUN
- YI WENXIANG
- YAO FANGGUI
- WEN JIANCHUN
- TANG JIANBO
- YANG XIN
- QIN HAOGANG
- QIN YU
- WU YAN
Assignees
- 广西柳州钢铁集团有限公司
- 柳州钢铁股份有限公司
Dates
- Publication Date
- 20260512
- Application Date
- 20260312
Claims (2)
- 1. The accurate alignment and efficient exhaust operation method for the wagon of the wagon dumper is characterized by comprising the following steps of: 1. Preparation stage of train wagon (1) Finishing the marshalling of the mineral powder wagon required by the wagon tipper at a marshalling station, and dragging or jacking the mineral powder wagon to a designated working line by the wagon; (2) The factory inspector inspects the train wagon, and after the qualified train wagon is confirmed, the shunting operator commands the locomotive trailer; 2. High-efficiency integrated exhaust, pipe picking and hook jumping prevention operation (1) The centralized air exhaust is carried out, namely the pre-turning car train is arranged into a preparation stock way in advance, the centralized and quick air exhaust is carried out on the auxiliary air cylinders of the whole car, namely the air exhaust of the air exhaust pull rod of each car is carried out for 4-6 seconds, and the fact that the auxiliary air cylinder piston is completely retracted and the car is completely relieved is confirmed, so that all the car is in a relieved state at the same time; (2) Quick pipe removing, namely, uniformly and quickly removing the air pipe connection; (3) Pulling the anti-jump hook, namely rapidly pulling the anti-jump hook bolt to prevent the car coupler from jumping up accidentally; 3. accurate alignment command method for shunting personnel (1) Station, shunting personnel are positioned at a preset observation point; (2) Pressing down the wireless command device to start communication; (3) Sending an operation instruction to a locomotive driver; (4) The method comprises the steps of commanding the locomotive to start and finish accurate alignment; 4. Locomotive driver cooperative operation flow (1) Confirming an operation signal; (2) Accelerating the lifting handle to start the locomotive; (3) The speed is reduced steadily to approach the towed vehicle; (4) The car coupler is tightly supported by the trailer by light acceleration; (5) Controlling the speed of the vehicle to enable the train to run at a constant speed; (6) Accurate parking is achieved according to the on-site signboard.
- 2. The method for accurately aligning and efficiently exhausting air for the wagon of the wagon dumper according to claim 1, wherein the air exhausting operation is performed for 5 seconds by using an air exhausting pull rod for each wagon.
Description
Accurate alignment and efficient exhaust operation method for wagon of wagon dumper Technical Field The invention belongs to the technical field of production scheduling of railway transportation and metallurgical enterprises, and particularly relates to an operation method for accurate alignment and efficient exhaust of a turning-over locomotive skin, which is particularly suitable for railway shunting operation of a raw material transportation line of a steel enterprise. Background In the operation of the existing car dumper, the conventional decentralized operation mode is generally adopted in the air exhaust, pipe removal, hook jump prevention operation of a car wagon and the alignment process of a locomotive, so that the problems of complex operation flow, long time consumption and low alignment precision exist. Taking a typical 22 mineral powder wagon as an example, the traditional car-by-car air exhaust mode takes about 20 minutes, the overall efficiency of the car turning operation is seriously affected, the fuel consumption of the locomotive is increased, and equipment abrasion and operation safety risks are not easy to cause due to inaccurate alignment. Therefore, a systematic, efficient and high-precision method for handling and aligning the skin of a car dumper is needed to solve the above-mentioned problems. Disclosure of Invention The invention aims to solve the technical problems of complex operation flow, long time consumption and low alignment precision of the traditional decentralized operation mode. In order to solve the problems, the technical scheme of the invention is that the control method for dry dedusting and explosion venting of the converter comprises the following steps: 1. Preparation stage of train wagon (1) Finishing the marshalling of the mineral powder wagon required by the wagon tipper at a marshalling station, and dragging or jacking the mineral powder wagon to a designated working line by the wagon; (2) And (5) checking the train wagon by factory inspection personnel, and commanding the locomotive trailer by a shunting operator after the train wagon is qualified. 2. High-efficiency integrated exhaust, pipe picking and hook jumping prevention operation (1) The centralized air exhaust is carried out, namely the pre-turning car train is arranged into a preparation stock way in advance, the centralized and quick air exhaust is carried out on the auxiliary air cylinders of the whole car, namely the air exhaust of the air exhaust pull rod of each car is carried out for 4-6 seconds, and the fact that the auxiliary air cylinder piston is completely retracted and the car is completely relieved is confirmed, so that all the car is in a relieved state at the same time; (2) Quick pipe removing, namely, uniformly and quickly removing the air pipe connection; (3) And pulling the anti-jump hook, namely rapidly pulling the anti-jump hook bolt and preventing the car coupler from jumping up accidentally. 3. Accurate alignment command method for shunting personnel (1) Station, shunting personnel are positioned at a preset observation point; (2) Pressing down the wireless command device to start communication; (3) Sending an operation instruction to a locomotive driver; (4) And the method is used for commanding the locomotive to start and finish accurate alignment. 4. Locomotive driver cooperative operation flow (1) Confirming an operation signal; (2) Accelerating the lifting handle to start the locomotive; (3) The speed is reduced steadily to approach the towed vehicle; (4) The car coupler is tightly supported by the trailer by light acceleration; (5) Controlling the speed of the vehicle to enable the train to run at a constant speed; (6) Accurate parking is achieved according to the on-site signboard. In the technical scheme, more specific scheme is that the air exhaust pull rod is used for exhausting air for 5 seconds per car. By adopting the technical scheme, compared with the prior art, the invention has the following beneficial effects: 1. the operation time is greatly shortened, for example, the exhaust time of 22 train carriages is reduced from 20 minutes to 10 minutes, and the efficiency is improved by 50 percent; 2. the comprehensive benefit is obvious, the number of turns over 3 groups of carriages per shift can be saved by 30 minutes, the daily time can be saved by 90 minutes, and a great amount of operation time can be saved by annual accumulation; 3. The energy consumption is reduced, the fuel cost is saved by 132.3 yuan per day, and the annual saving is about 48289.5 yuan; 4. The operation capability is improved, namely 22 vehicles can be overturned every day, 8030 vehicles can be overturned every year, and the raw material receiving and unloading capability is effectively improved; 5. the operation standardization degree is high, the training and the popularization are convenient, and the human error is reduced; 6. the safety is enhanced, the alignment precision is improved,