CN-122013816-A - Working well construction template for parking apron road and construction method thereof
Abstract
The invention provides a construction template of a working well for a parking apron road and a construction method thereof, which belong to the technical field of road construction, and the construction method of the working well for the parking apron road comprises the following steps of S10, lowering all pipeline working wells in a working range to the bottom elevation of a water stabilization layer to be constructed, covering and protecting a wellhead by using a steel plate, paving and compacting two water stabilization layers; S20, cutting and removing a water stabilization layer part corresponding to the upper part of a wellhead after the water stabilization layer is formed, exposing a construction position, then performing shaft heightening construction, S30, covering and protecting the wellhead by using a steel plate after the shaft is heightened, paving an asphalt lower layer and other design isolation layers of a road in sequence, S40, cutting and removing the asphalt lower layer and other design isolation layers above the wellhead after the asphalt lower layer and other design isolation layers are integrally formed, exposing the construction position, and then performing shaft heightening construction to the elevation of an operation well. The invention improves the bearing capacity of the pavement.
Inventors
- MA RONG
- YANG BO
- WANG XINGHUA
- Lei Jinhu
- TONG ZONGYI
- GAO QIANG
- WANG DONG
- YIN KAI
- LI ZHIXUAN
- ZHAO ZHOUWEI
Assignees
- 山西机械化建设集团有限公司
Dates
- Publication Date
- 20260512
- Application Date
- 20260306
Claims (10)
- 1. The construction method of the working well for the parking apron road is characterized by comprising the following steps of: S10, firstly, before the water stable layer of the parking apron road is paved, lowering all pipeline operation wells in an operation range to the elevation at the bottom of the water stable layer to be constructed, using a steel plate to temporarily cover and protect a wellhead, and then continuously and integrally paving and compacting two water stable layers to form a complete and uniform road base structure; S20, after the cement stabilized gravel layer is integrally formed, cutting and removing a water stabilization layer part corresponding to the upper part of the wellhead to expose a construction position, and then heightening the shaft; s30, after the shaft is processed to the target height, temporarily covering and protecting the wellhead by using a steel plate again, and then paving an asphalt lower layer and other design isolation layers of the road in sequence; s40, after the asphalt lower layer and other design isolation layers are integrally formed, cutting and removing the asphalt lower layer and other design isolation layers corresponding to the upper part of the wellhead, exposing the construction position, and then carrying out shaft heightening construction to the elevation of the operation well.
- 2. A tarmac road work well construction template suitable for use in the tarmac road work well construction method as claimed in claim 1, comprising: The outer profile unit comprises a base, a top seat and a middle seat arranged between the base and the top seat, wherein a bottom cavity for sliding the middle seat is formed in the base, a bottom storage groove is formed in the top of the inner wall of the bottom cavity, a middle cavity for sliding the top seat is formed in the middle seat, a middle storage groove is formed in the top of the inner wall of the middle cavity, a first air passage communicated with the bottom cavity is further formed in the middle seat, a second air passage communicated with the middle cavity is formed in the top seat, and an operation area of the shaft is formed by the base, the middle seat and the inner ring of the top seat; the clamping unit comprises a first clamping structure arranged in the bottom storage groove and a second clamping structure arranged in the middle storage groove, wherein the first clamping structure comprises a bottom clamping plate slidably arranged in the bottom storage groove and a bottom elastic piece fixedly connected between the bottom clamping plate and the base, the bottom elastic piece has a pretightening force enabling the bottom clamping plate to extend out of the bottom storage groove, the second clamping structure is identical with the second clamping structure, and The inner profile unit comprises an inner template arranged in the working area and a lifting structure arranged on the top seat, wherein the lifting structure is used for driving the inner template to move upwards.
- 3. The working well construction template for the apron road according to claim 2, wherein the footstock is provided with a top cavity communicated with the outside; the working well construction template for the parking apron road further comprises a stirring unit; the stirring unit includes: The bottom rod is rotatably connected to the inner bottom wall of the bottom cavity, and the bottom rod takes the up-down direction as a rotating shaft; The middle rod is rotatably connected to the inner bottom wall of the middle cavity, the middle rod takes the vertical direction as a rotation shaft, a first accommodating groove for accommodating the bottom rod is formed in the middle rod, the middle rod is detachably connected with the bottom rod, a plurality of stirring blades are further arranged on the outer wall of the middle rod, and The ejector rod is arranged in the top cavity, and a second accommodating groove for accommodating the middle rod is formed in the ejector rod.
- 4. The working well construction template for the apron road of claim 3, wherein the inner wall of the ejector rod is provided with a spiral groove, and the top of the middle rod is fixedly connected with a transmission block which is in sliding fit with the spiral groove; The ejector rod is arranged in the top cavity in a sliding mode, and the ejector rod slides in the up-down direction.
- 5. The tarmac road work well construction template of claim 4, wherein the inner wall of the jack is provided with a straight groove communicated with the spiral groove, and the straight groove extends in the up-down direction.
- 6. The work well construction template for the apron road according to claim 3, wherein the middle rod is provided with adjusting grooves corresponding to the stirring blades one by one, the inner wall of the adjusting grooves is fixedly connected with guide posts, the guide posts extend along the up-down direction, the stirring blades are provided with adjusting openings for the guide posts to pass through, and the stirring blades extend into the first accommodating grooves; The top wall of the ejector rod is provided with a through hole for communicating the outside with the second accommodating groove.
- 7. The tarmac road work well construction template of claim 2, wherein the outer diameter of the cement stabilized crushed stone layer cut in S20 is equal to the outer diameter of the middle seat; and S40, the outer diameter of the asphalt lower layer and other design isolation layers cut out in the step of S40 is equal to the outer diameter of the top seat.
- 8. The tarmac roadway work well construction template of claim 2, wherein the outer diameter of the inner template is less than the inner diameter of the base.
- 9. The tarmac is a work well construction template for roads according to claim 8, wherein a plurality of grooves are formed in the bottom of the inner template, and an electric suction cup is arranged in the grooves.
- 10. The tarmac is a work well construction template for a road according to claim 2, wherein the top base is detachably connected with a mounting base, and the lifting structure is arranged on the mounting base.
Description
Working well construction template for parking apron road and construction method thereof Technical Field The invention belongs to the technical field of road construction, and particularly relates to a working well construction template for a parking apron road and a construction method thereof. Background The road between the airport parking apron and the terminal building is a key infrastructure for ensuring the traffic of various ground service vehicles and heavy freight vehicles. The road has the characteristics of large load, high frequency and strict flatness requirement, and the pavement structure of the road has to have extremely high integrity and uniform bearing capacity. Under such roads, various pipelines such as electric power, communication, drainage, fire control, etc. are often densely distributed, and accordingly, it is necessary to provide a plurality of pipeline operation wells (hereinafter referred to as "operation wells") in a road surface structural layer. The traditional road and working well construction method mainly comprises the steps of sequentially working, namely firstly completing the construction of a well body of the working well or installing the well body to a designed elevation, and then paving and compacting a water stable layer, an asphalt layer and the like of the road around the working well in a layered manner. Therefore, in the prior art, a construction sequence of a first well and a later road is mostly adopted, however, the construction sequence can cause that the main structural layer of the pavement cannot realize integral continuous construction, so that the defects of discontinuous materials, uneven thickness, inconsistent compactness and the like are caused, and finally, a high-strength and complete foundation bearing plate is difficult to form. Disclosure of Invention The embodiment of the invention provides a working well construction template for a parking apron road and a construction method thereof, aiming at solving the technical problem that the bearing capacity of the road surface is reduced due to the construction sequence of a first well and a later road. In a first aspect, an embodiment of the present invention provides a construction method for a working well for a tarmac road, including the following steps: S10, firstly, before the water stable layer of the parking apron road is paved, lowering all pipeline operation wells in an operation range to the elevation at the bottom of the water stable layer to be constructed, using a steel plate to temporarily cover and protect a wellhead, and then continuously and integrally paving and compacting two water stable layers to form a complete and uniform road base structure; S20, after the cement stabilized gravel layer is integrally formed, cutting and removing a water stabilization layer part corresponding to the upper part of the wellhead to expose a construction position, and then heightening the shaft; s30, after the shaft is processed to the target height, temporarily covering and protecting the wellhead by using a steel plate again, and then paving an asphalt lower layer and other design isolation layers of the road in sequence; s40, after the asphalt lower layer and other design isolation layers are integrally formed, cutting and removing the asphalt lower layer and other design isolation layers corresponding to the upper part of the wellhead, exposing the construction position, and then carrying out shaft heightening construction to the elevation of the operation well. Compared with the prior art, the construction method of the working well for the apron road provided by the invention has the advantages that the traditional construction sequence of 'first well and then road' is sublevel, and the construction method of 'first whole paving and then staged perforation and well adding' is initiated. The core benefits of the road pavement paving device are that a cement stable crushed stone layer (a water stable layer) serving as a main bearing layer of a road, a subsequent asphalt lower layer and the like are ensured, and uninterrupted whole paving and compaction can be realized. The defects of discontinuous material paving, difficult uniform operation of compaction equipment and the like caused by the prior existence of the well body in the traditional process are fundamentally eliminated. The final result is that a complete, uniform and high-strength road foundation bearing plate is formed, the severe requirements of the airport parking apron road on the integrity, the flatness and the ultra-high bearing capacity are perfectly met, and the long-term durability and the safety of the road are fundamentally improved from the construction process. In a second aspect, an embodiment of the present invention further provides a construction template for a working well for a tarmac road, including: The outer profile unit comprises a base, a top seat and a middle seat arranged between the base and the top se