Abstract

The invention provides a closed construction method and a building, wherein the method is used for functional building construction in a narrow space of a high-density urban area; the method comprises the steps of splitting the functional building into building modules and prefabricated parts, setting the building modules in an external area in a functional building space, installing the prefabricated parts in other areas in the functional building space, wherein the functional building space is surrounded by a plurality of building modules to form a closed space isolated from the external environment, or the functional building space is surrounded by a plurality of building modules and the prefabricated parts to form the closed space isolated from the external environment, and building construction is carried out in the closed space. The functional building is split into the modules and the prefabricated parts, the building modules are arranged in the outer area, the prefabricated parts are installed, a closed space isolated from the outside is formed for construction, the construction area is effectively isolated, and the diffusion of environmental pollution is reduced.

Inventors

  • FAN ZESEN
  • SU YANJIANG
  • ZHANG QIANQIAN
  • LI YOULE
  • JIN CHENG
  • SHI PENGFEI
  • TIAN CHUNYU
  • LIU JIULING
  • WANG FAN
  • ZHANG MENGMENG

Assignees

  • 中建科技集团有限公司

Dates

Publication Date
20260512
Application Date
20260319

Claims (10)

  1. 1. A closed construction method is characterized in that the method is used for functional building construction in a narrow space of a high-density urban area, and comprises the following steps: Splitting the functional building into building modules and prefabricated parts; setting up the building module in an external area in a functional building space; The functional building space is surrounded by a plurality of building modules to form a closed space isolated from the external environment, or the functional building space is surrounded by a plurality of building modules and a plurality of prefabricated components to form a closed space isolated from the external environment; And performing construction in the closed space.
  2. 2. The method of claim 1, wherein the building modules are replicable standard building structures, and a plurality of building modules are horizontally spliced and/or stacked and spliced in the outer area by hoisting.
  3. 3. The method of claim 1, wherein the exterior of the building module is provided with an exterior finish.
  4. 4. The enclosed construction method according to claim 1, wherein the prefabricated elements include first prefabricated elements, and the installing the prefabricated elements in other areas of the functional building space includes: The first prefabricated part is built in an inner area of the construction space.
  5. 5. The closed construction method according to claim 1 or 4, wherein the prefabricated elements include a second prefabricated element, the installing the prefabricated elements in other areas of the functional building space, further comprising: building the second prefabricated elements in the outer areas where building modules are not set up to connect adjacent building modules; And hanging a dustproof noise reduction enclosure to the outer side of the second prefabricated part, so that the building module and the dustproof noise reduction enclosure are enclosed together to form the closed space.
  6. 6. The method of constructing a closure according to claim 5, wherein, The building module is arranged in an external area with wide periphery; The second prefabricated part is built in an outer area with a narrow periphery.
  7. 7. The closed construction method according to claim 1, wherein the installing the prefabricated elements in other areas of the functional building space comprises: and (3) finishing the hoisting construction of the prefabricated part layer by layer according to the construction sequence from far to near, from the outside to the inside.
  8. 8. The closed construction method according to claim 1, wherein the top of the closed space is in an open state, an openable state, or a closed state.
  9. 9. The closed construction method according to claim 1, wherein the construction of the building module and the prefabricated member in the closed space includes: And (5) performing wall installation, interior decoration and electromechanical system installation construction in the closed space.
  10. 10. A building constructed by closed construction, comprising a building module and a prefabricated member, the building module and the prefabricated member being constructed by the closed construction method according to any one of claims 1 to 9 to form the building.

Description

Closed construction method and building Technical Field The invention relates to the technical field of building construction, in particular to a closed construction method and a building. Background Urban development in China has been shifted from incremental expansion to stock quality improvement and synergy stages. The implementation of city updating is an important measure for promoting the high-quality development of cities. A large number of urban updating projects are focused on old urban areas where buildings are dense. Old urban buildings mainly have low multi-storey, and have the characteristics of narrow space, dense building population and traffic congestion. The surrounding roads are narrow, vehicles are difficult to pass, meanwhile, the problems of shaking buildings and flying lines exist in the close vicinity or close vicinity of the buildings, so that construction equipment is difficult to transport or cannot pass, a large amount of surrounding roads are occupied by site construction, a closed working environment cannot be formed, meanwhile, dust, noise and the like generated by site mechanical operation influence the life of surrounding residents, a large amount of residents complain, larger social and economic influence is brought, and the problems become a main obstacle for restricting the transformation of old buildings. Aiming at the construction projects of the buildings in the dense areas, the existing construction and construction mode generally needs to occupy surrounding sites to set up surrounding barriers and set up scaffolds for construction operation and protection, a building structure system is separated from a construction surrounding barrier and an operation protection system in the construction and construction mode, temporary facilities such as the surrounding barriers and the scaffolds are required to be removed after the construction is completed, the whole construction process is exposed in urban environment, the construction period is long, the field wet workload is large, the occupied sites are large, the three-dimensional totally-enclosed construction sites cannot be formed, noise and other environmental pollution generated in the process are large, and the influence on urban landscape is large. Disclosure of Invention The object of the present invention is to provide a closed construction method and a building to solve at least part of the above problems. The invention provides a closed construction method for functional building construction in a narrow space of a high-density urban area, which comprises the following steps: Splitting the functional building into building modules and prefabricated parts; setting up the building module in an external area in a functional building space; The functional building space is surrounded by a plurality of building modules to form a closed space isolated from the external environment, or the functional building space is surrounded by a plurality of building modules and a plurality of prefabricated components to form a closed space isolated from the external environment; And performing construction in the closed space. Furthermore, the building modules are replicable standard building structures, and a plurality of building modules are horizontally spliced and/or stacked and spliced in the outer area in a hoisting mode. Further, the exterior of the building module is provided with an exterior finish. Further, the prefabricated elements include a first prefabricated element, and the installing the prefabricated element in other areas of the functional building space includes: The first prefabricated part is built in an inner area of the construction space. Further, the prefabricated parts include a second prefabricated part, and the prefabricated parts are installed in other areas of the functional building space, and further include: building the second prefabricated elements in the outer areas where building modules are not set up to connect adjacent building modules; And hanging a dustproof noise reduction enclosure to the outer side of the second prefabricated part, so that the building module and the dustproof noise reduction enclosure are enclosed together to form the closed space. Further, the building module is arranged in an external area with wide periphery; The second prefabricated part is built in an outer area with a narrow periphery. Further, the installing the prefabricated parts in other areas of the functional building space includes: and (3) finishing the hoisting construction of the prefabricated part layer by layer according to the construction sequence from far to near, from the outside to the inside. Further, the top of the closed space is in an open state, an openable state or a closed state. Further, the building construction of the building module and the prefabricated member is performed in the closed space, and the building construction comprises: And (5) performing wall installation, interior decor