Search

CN-122014342-A - Hanging rail for tunnel inspection and inspection device

CN122014342ACN 122014342 ACN122014342 ACN 122014342ACN-122014342-A

Abstract

The invention relates to a hanging rail for tunnel inspection and an inspection device, wherein the hanging rail for tunnel inspection comprises a plurality of rail sections, the rail sections are sequentially connected end to end, the rail sections comprise a rail shell and a rail inner core, the rail inner core is a honeycomb aluminum inner core, the honeycomb aluminum inner core is arranged in the rail shell in a penetrating manner along the length direction of the rail shell, the honeycomb aluminum inner core is fixedly connected with the inner side wall of the rail shell, the honeycomb aluminum inner core comprises a plurality of core tubes with regular polygon cross sections, and the outer side walls of two adjacent core tubes are fixedly connected. According to the hanging rail for tunnel inspection, the honeycomb inner cores are arranged in the rail outer shell, so that the structural strength of the rail can be enhanced, the weight of the rail cannot be increased too much, rust of the rail is avoided, vibration, noise and the like of the rail are reduced, and thermal expansion and cold contraction deformation of the rail are avoided.

Inventors

  • HUANG MEIHUA
  • WU KEWEI
  • HE XIAOGANG
  • GUO YANG

Assignees

  • 北京卓视智通科技有限责任公司

Dates

Publication Date
20260512
Application Date
20251229

Claims (10)

  1. 1. The utility model provides a tunnel is patrolled and examined with articulating track, its characterized in that includes a plurality of track sections, a plurality of track section dock end to end in proper order, the track section includes track shell and track inner core, the track inner core is honeycomb aluminium inner core, the honeycomb aluminium inner core is followed the length direction of track shell wears to establish in the track shell, the honeycomb aluminium inner core with the inside wall fixed connection of track shell, the honeycomb aluminium inner core includes a plurality of cross-section personally submitted regular polygon's core pipe, the lateral wall fixed connection of two adjacent core pipes.
  2. 2. The hooking track for tunnel inspection according to claim 1, wherein the end faces of two ends of the track sections are respectively provided with a first magnetic attraction block and a second magnetic attraction block, one end of one track section is in magnetic attraction butt joint with the second magnetic attraction block at one end of the adjacent track section through the first magnetic attraction block, and the two adjacent track sections are connected and fixed through a connecting piece.
  3. 3. The hooking track for tunnel inspection according to claim 2, wherein a first butting surface of the first magnetic block is concave to form a butting groove, a second butting surface of the second magnetic block is convex to form a butting projection, the second butting surface is matched and abutted to the first butting surface, and the butting projection is matched and spliced in the corresponding butting groove.
  4. 4. A hooking track for tunnel inspection according to claim 3, wherein the first abutting surface of the first magnetic block is flush with the end surface of the track section, and the second abutting surface of the second magnetic block is flush with the end surface of the track section.
  5. 5. The hooking track for tunnel inspection according to any one of claims 1 to 4, wherein a carbon fiber layer is formed on the outer surface of the track housing, and the track section is integrally formed by an aluminum drawing process.
  6. 6. The hooking track for tunnel inspection according to any one of claims 1 to 4, wherein the upper surface of the track section is concavely formed with a first track groove and a second track groove which are arranged in parallel with each other, the first track groove and the second track groove are both arranged to extend in the length direction of the track section, and the opposite side walls of the track section are concavely formed with a first guide groove and a second guide groove, respectively, which are both arranged to extend in the length direction of the track section.
  7. 7. The tunnel inspection hanging rail is characterized by comprising an inspection assembly, the inspection assembly comprises a travelling mechanism and an image acquisition mechanism, the travelling mechanism is hung on the tunnel inspection hanging rail and can move along each rail section, the travelling mechanism comprises a first travelling frame, a driving wheel set and a first guide wheel set, the driving wheel set and the first guide wheel set are assembled on the first travelling frame, the driving wheel set and the first guide wheel set are installed on the tunnel inspection hanging rail in a rolling mode, each wheel shaft of the first guide wheel set is fixed on the first travelling frame through anti-withdrawal nuts, and the image acquisition mechanism is installed at the bottom of the first travelling frame.
  8. 8. The inspection device according to claim 7, wherein the anti-withdrawal nut comprises a nut body and a bolt, a plurality of pairs of inserting holes are formed in the nut body, the inserting holes are uniformly distributed along the circumferential direction of the nut body, one pair of inserting holes comprises two inserting holes which are correspondingly distributed along the radial direction of the nut body, the wheel shaft is provided with an anti-withdrawal inserting hole, after the nut body is screwed on the wheel shaft, the inserting holes are correspondingly distributed with the anti-withdrawal inserting holes in the wheel shaft, and the bolt is inserted into the corresponding inserting holes and the anti-withdrawal inserting holes.
  9. 9. The inspection device according to claim 7, wherein the driving wheel set comprises two driving wheels, the two driving wheels are respectively connected to two opposite side walls of the track section in a rolling manner, and the upper ends and the lower ends of central shafts of the two driving wheels are connected through tension springs.
  10. 10. The inspection device of claim 7, wherein the traveling mechanism further comprises a fire extinguishing tank, a second traveling frame and a second guide wheel set, the second traveling frame is installed on the hanging rail for tunnel inspection in a rolling mode through the second guide wheel set, the second traveling frame is detachably connected with the first traveling frame, each wheel shaft of the second guide wheel set is fixed on the second traveling frame through an anti-back nut, and the fire extinguishing tank is installed at the bottom of the second traveling frame through a first damping component.

Description

Hanging rail for tunnel inspection and inspection device Technical Field The invention relates to the technical field of tunnel inspection, in particular to a hanging rail for tunnel inspection and an inspection device. Background The conventional hanging rail for tunnel inspection generally adopts steel rails, the weight of the steel rails is heavy, the laying and the installation are inconvenient, the hanging rail adopts hollow aluminum rails, the hollow aluminum rails are easy to deform due to expansion caused by heat and contraction caused by cold due to weather influence in the use process, the assembly and the butt joint are inconvenient, the dynamic change scene is difficult to adapt, the whole weight of the inspection mechanism is heavy, and the rail deformation is easy to occur in the operation process. In the running process of the conventional tunnel inspection wheel set on the track, the wheel shaft is generally pressed and fixed on the shell through the nut, and when the tunnel inspection wheel set is used for a long time, the nut is easy to separate from the wheel shaft, and the wheel shaft is easy to loosen. Moreover, the existing tunnel inspection wheel sets are driven by single motor power, so that the driving effect is poor for the inspection wheel sets with heavy weight, and the driving process is unstable. Disclosure of Invention The invention provides a hanging rail for tunnel inspection and an inspection device, which aim to solve one or more of the technical problems in the prior art. The invention provides a hanging rail for tunnel inspection, which comprises a plurality of rail sections, wherein the rail sections are in end-to-end butt joint in sequence, each rail section comprises a rail shell and a rail inner core, each rail inner core is a honeycomb aluminum inner core, each honeycomb aluminum inner core is arranged in the corresponding rail shell in a penetrating manner along the length direction of the corresponding rail shell, the honeycomb aluminum inner cores are fixedly connected with the inner side wall of the corresponding rail shell, each honeycomb aluminum inner core comprises a plurality of core tubes with regular polygon cross sections, and the outer side walls of the two adjacent core tubes are fixedly connected. The hanging rail for tunnel inspection has the beneficial effects that the honeycomb-shaped inner core is arranged in the rail shell, so that the structural strength of the rail can be enhanced, the weight of the rail can not be increased too much, rust of the rail is avoided, vibration, noise and the like of the rail are reduced, and thermal expansion and cold contraction deformation of the rail are avoided. On the basis of the technical scheme, the invention can be improved as follows. Further, the first magnetism is inhaled the piece and the piece is inhaled to the second magnetism is installed respectively to the both ends terminal surface of track section, and the butt joint is inhaled to the second magnetism that the piece was inhaled to the piece one end and adjacent track section one end is inhaled through first magnetism to one end of track section, still connects fixedly through the connecting piece between two adjacent track sections. The magnetic attraction splicing device has the beneficial effects that the magnetic attraction splicing blocks are arranged at the two ends of the track sections, so that the quick magnetic attraction splicing between the track sections can be realized, and the track sections are connected and fixed through the connecting piece after the magnetic attraction splicing. Further, the middle part of the first butt joint surface of the first magnetic attraction block is sunken to form a butt joint groove, the middle part of the second butt joint surface of the second magnetic attraction block is protruded to form a butt joint convex block, the second butt joint surface is in fit and butt joint with the first butt joint surface, and the butt joint convex block is in fit and butt joint with the corresponding butt joint groove. The magnetic attraction block has the beneficial effects that stable, rapid and accurate butt joint between two adjacent track sections can be realized by arranging the butt joint groove or the butt joint convex block on the magnetic attraction block. Further, the first butt joint surface of the first magnetic attraction block is flush with the end face of the track section, and the second butt joint surface of the second magnetic attraction block is flush with the end face of the track section. Further, a carbon fiber layer is formed on the outer surface of the track shell, and the track section is integrally manufactured and formed by adopting an aluminum drawing process. The technical scheme has the beneficial effect that the corrosion resistance of the track shell can be improved by arranging the carbon fiber layer on the outer surface of the track shell. Further, the upper surface of the track se