CN-122026428-A - Port shore power intelligent dispatching method, device, equipment and medium
Abstract
The application relates to the technical field of shore power dispatching, in particular to a method, a device, equipment and a medium for intelligently dispatching port shore power, wherein the method comprises the steps of obtaining a departure plan of a berthing ship and determining at least one ship to be departure; generating a departure phasing power demand curve corresponding to each ship to be departure, generating a cooperative scheduling scheme of other ships in the harbor according to the departure phasing power demand curve, and performing power scheduling on the other ships in the harbor according to the cooperative scheduling scheme to realize single-point large disturbance of ship departure, and converting the single-point large disturbance into smooth transition of the whole shore power grid through global refined scheduling, thereby effectively guaranteeing safe and high-quality operation of a multi-berth shore power system.
Inventors
- MAO NING
- YU QI
- LIU JIE
- ZHI XIAHUI
- BAO ZHIYUAN
Assignees
- 交通运输部规划研究院
Dates
- Publication Date
- 20260512
- Application Date
- 20260211
Claims (10)
- 1. The intelligent port shore power dispatching method is characterized by comprising the following steps of: acquiring a departure plan of a berthing ship, and determining at least one ship to be departure; Generating a departure phasing power demand curve corresponding to each ship to be departure; generating a cooperative scheduling scheme of other ships in the harbor according to the departure phasing power demand curve; and carrying out power dispatching on the other ships in the harbor according to the cooperative dispatching scheme.
- 2. The intelligent port shore power dispatching method according to claim 1, wherein the generating an departure phased power demand curve corresponding to the ships to be departed for each ship to be departed comprises: for each ship to be departed, acquiring at least one key load, an interruptible load and an adjustable load of the ship to be departed; According to the departure plan of the ship to be departed, respectively acquiring a turn-off function corresponding to the interruptible load and an adjustment function corresponding to the adjustable load, wherein the turn-off function and the adjustment function have corresponding relations with a plurality of electric power switching process stages in the departure plan; And generating the departure phasing power demand curve corresponding to the ship to be departure according to the key load, the interruptible load, the adjustable load, a turn-off function corresponding to the interruptible load and an adjustment function corresponding to the adjustable load.
- 3. The intelligent port shore power dispatching method according to claim 1, wherein the generating a cooperative dispatching scheme of other ships in the port according to the departure phased power demand curve comprises: determining a shore power transfer curve corresponding to the ship to be separated according to the separated phased power demand curve; constructing a multi-ship cooperative power compensation objective function according to the shore power transfer curve, wherein the multi-ship cooperative power compensation objective function comprises power adjustment amounts of other ships; And generating a cooperative scheduling scheme of the other ships according to the power adjustment amounts of the other ships at each moment.
- 4. The intelligent port shore power dispatching method according to claim 3, wherein constructing a multi-ship cooperative power compensation objective function according to the shore power transfer curve comprises: Constructing a shore power fluctuation item according to the shore power transfer curve; constructing adjustment amplitude items corresponding to other ships according to the basic power before adjustment of other ships and the power adjustment quantity; Constructing a device switching item according to the power adjustment quantity at each moment; And constructing a multi-ship cooperative power compensation objective function according to the shore power fluctuation item, the adjustment amplitude item and the equipment switching item.
- 5. The intelligent port shore power dispatching method of claim 4, further comprising: and determining the power adjustment amount of the other ships according to the priority of each other ship in the harbor.
- 6. The intelligent port shore power dispatching method according to claim 1, wherein the power dispatching of the other ships in the port according to the cooperative dispatching scheme comprises: and in the departure process of the ship to be departed, carrying out power adjustment on other ships according to the power adjustment amounts of other ships at all times in the port in the cooperative scheduling scheme.
- 7. A port shore power intelligent dispatching device, comprising: An acquisition module for acquiring an departure plan for berthing the ship, determining at least one ship to be separated from the port; The first generation module is used for generating a departure phasing power demand curve corresponding to each ship to be departed; the second generation module is used for generating a cooperative scheduling scheme of other ships in the harbor according to the departure phasing power demand curve; And the scheduling module is used for carrying out power scheduling on the other ships in the harbor according to the cooperative scheduling scheme.
- 8. An electronic device comprising a memory, a processor and a computer program stored on the memory and executable on the processor, wherein the processor implements the intelligent port shore power dispatching method of any of claims 1-6 when the program is executed by the processor.
- 9. A computer readable storage medium having stored thereon a computer program, which when executed by a processor implements the intelligent port shore power dispatching method of any of claims 1-6.
- 10. A computer program product comprising a computer program, characterized in that the computer program, when executed by a processor, implements the intelligent port shore power dispatching method of any of claims 1-6.
Description
Port shore power intelligent dispatching method, device, equipment and medium Technical Field The present disclosure relates generally to the technical field of shore power dispatching, and in particular, to a method, an apparatus, a device, and a medium for intelligent port shore power dispatching. Background Shore power (shore power) is a term of navigation science technology published in 1996, and refers to a power supply mode of power generation by substituting fuel oil by accessing a land power network during the period of approaching a port of a ship, and comprises a high-voltage/low-voltage shore power system. Under the drive of global port green transformation and 'double carbon' targets, the shore power technology takes the advantages of replacing oil with electricity and reducing pollution emission of ships by port, and becomes a core technology path of port energy conservation and emission reduction. The land-based power grid is transmitted to the ship to replace a diesel generator for power supply, so that not only can the emission of pollutants such as sulfur oxides, nitrogen oxides and the like be obviously reduced, but also the noise pollution of ports can be reduced, and the land-based power grid has important environmental protection and social benefits and is a key measure for realizing the sustainable development of ports. Ship departure is a critical node in the stability of shore power systems. Before departure, the ship needs to gradually reduce the shore power supply and switch to the power supply of the marine generator, and the process needs to be stably transited, so that the impact on ship equipment and a port power grid is avoided. Meanwhile, power variation of the departure ship affects load balance of the whole port. Therefore, how to smoothly schedule the ship departure power connection becomes a problem to be solved. Disclosure of Invention In view of the above-mentioned drawbacks or shortcomings in the prior art, it is desirable to provide a method, a device, equipment and a medium for intelligent scheduling of shore power in a port, which realize a single point of large disturbance for departure of a ship, and convert the single point of large disturbance into smooth transition of the whole shore power grid through global fine scheduling, so as to effectively ensure safe and high-quality operation of a multi-berth shore power system. In a first aspect, an embodiment of the present application provides a port shore power intelligent scheduling method, including: acquiring a departure plan of a berthing ship, and determining at least one ship to be departure; Generating a departure phasing power demand curve corresponding to each ship to be departure; generating a cooperative scheduling scheme of other ships in the harbor according to the departure phasing power demand curve; and carrying out power dispatching on the other ships in the harbor according to the cooperative dispatching scheme. In some embodiments, the generating, for each of the to-be-offloaded vessels, an offloaded phased power demand curve corresponding to the to-be-offloaded vessel includes: for each ship to be departed, acquiring at least one key load, an interruptible load and an adjustable load of the ship to be departed; According to the departure plan of the ship to be departed, respectively acquiring a turn-off function corresponding to the interruptible load and an adjustment function corresponding to the adjustable load, wherein the turn-off function and the adjustment function have corresponding relations with a plurality of electric power switching process stages in the departure plan; And generating the departure phasing power demand curve corresponding to the ship to be departure according to the key load, the interruptible load, the adjustable load, a turn-off function corresponding to the interruptible load and an adjustment function corresponding to the adjustable load. In some embodiments, the generating a co-scheduling scheme for other vessels in the port according to the departure phased power demand curve includes: determining a shore power transfer curve corresponding to the ship to be separated according to the separated phased power demand curve; constructing a multi-ship cooperative power compensation objective function according to the shore power transfer curve, wherein the multi-ship cooperative power compensation objective function comprises power adjustment amounts of other ships; And generating a cooperative scheduling scheme of the other ships according to the power adjustment amounts of the other ships at each moment. In some embodiments, the constructing a multi-vessel collaborative power compensation objective function from the shore power transfer profile includes: Constructing a shore power fluctuation item according to the shore power transfer curve; constructing adjustment amplitude items corresponding to other ships according to the basic power before adjustment of other