CN-122027507-A - Port opening method, device, equipment, storage medium and program product
Abstract
The disclosure provides a port opening method, a port opening device, a port opening equipment, a storage medium and a program product, and relates to the technical field of electric communication. The method comprises the steps of obtaining a port renting service opening work order by a dispatching center, distributing resource information for the port renting service opening work order, sending the work order and the resource information to an execution system, enabling the execution system to construct according to the work order and the resource information, feeding back completion reporting information and configuration script information, receiving the completion reporting information and the configuration script information sent by the execution system, and determining the completion of the work order in response to the passing of audit. The method and the system dynamically match available resources according to the work order requirements, directly issue the work order and the resource information to the execution system and generate the configuration script for auditing, and eliminate inconsistent information and solve the problem of disjoint between the resources and the construction by pre-locking the resources and synchronizing the real-time states.
Inventors
- JI WENJUN
- QU XIN
- SHI YANBIN
- ZHAO CONGCONG
- GUO PAN
Assignees
- 中国电信股份有限公司
Dates
- Publication Date
- 20260512
- Application Date
- 20260121
Claims (10)
- 1. The port opening method is characterized by being applied to a dispatching center and comprising the following steps of: Acquiring a port renting service opening work order, and distributing resource information for the port renting service opening work order, wherein the port renting service opening work order comprises client demand information and port specification information, and the resource information comprises port information, IP information and bandwidth information; the work order and the resource information are sent to an execution system, so that the execution system performs construction according to the work order and the resource information and feeds back completion information and configuration script information; And receiving the completion report information and the configuration script information sent by the execution system, and determining the completion of the work order in response to the passing of the audit.
- 2. The method for opening a port according to claim 1, wherein the scheduling center includes a customer relationship management system, an arrangement system, and a resource system, and the obtaining the port rental service opening work order, and the allocating resource information for the port rental service opening work order includes: The client relation management system obtains a port renting service opening work order request initiated by a user, generates a port renting service opening work order and sends the port renting service opening work order to the arrangement system; the arrangement system sends the port renting service opening work order to a resource system; And the resource system allocates resources according to the port renting service opening worksheet, determines resource information and sends the resource information to the arrangement system.
- 3. The port opening method according to claim 2, wherein after the sending the work order and the resource information to an execution system, the method further comprises: Responding to a stop-start request initiated by an execution system, and initiating a stop-start work order by the client relation management system; The orchestration system initiates a port reassignment in response to an execution system initiated reassignment request.
- 4. The port opening method according to claim 2, wherein before the receiving the order completion information of the execution system, the method further comprises: Performing triangle comparison on the configuration script information, the resource information, the product opening requirement of the client relation management system and the actual configuration of the existing network equipment respectively; And receiving the work order finishing information of the execution system in response to the passing of the audit, and finishing the work order.
- 5. The port opening method according to claim 4, wherein the method further comprises: And in response to the failure of the audit, synchronizing the audit abnormal information to the execution system through the arrangement system so as to enable the execution system to initiate the audit again after re-construction or initiate the audit again after stopping or re-distributing.
- 6. The port opening method according to any one of claims 2 to 5, the determining job ticket completion comprising: the arranging system receives the work order completion information of the execution system and respectively reports the work order completion to the client relation management system, the resource system and the execution system; The orchestration system, the customer relationship management system, the resource system, and the execution system work order are all archived.
- 7. A port opening device, comprising: the resource information distribution module is used for acquiring a port renting service opening work order and distributing resource information for the port renting service opening work order, wherein the port renting service opening work order comprises client demand information and port specification information, and the resource information comprises port information, IP information and bandwidth information; The information sending module is used for sending the work order and the resource information to an execution system so that the execution system can construct according to the work order and the resource information and feed back completion report information and configuration script information; And the work order completion module is used for receiving the completion report information and the configuration script information sent by the execution system, and determining the completion of the work order in response to the passing of the audit.
- 8. An electronic device, comprising: Processor, and A memory for storing executable instructions of the processor; Wherein the processor is configured to perform the port opening method of any one of claims 1 to 6 via execution of the executable instructions.
- 9. A computer readable storage medium having stored thereon a computer program, wherein the computer program when executed by a processor implements the port opening method of any of claims 1 to 6.
- 10. A computer program product comprising a computer program or instructions which, when executed by a processor, implements the port opening method of any one of claims 1 to 6.
Description
Port opening method, device, equipment, storage medium and program product Technical Field The present disclosure relates to the field of telecommunications technologies, and in particular, to a port opening method, apparatus, device, storage medium, and program product. Background With the acceleration of global digital transformation, internet data center port renting business rapidly develops in digital transformation wave, and becomes a core infrastructure for supporting cloud computing, artificial intelligence and the internet of things. In the prior art, under the management mode in internet data, because a unified flow management mechanism is lacking among links, the construction flow is easy to be confused, the responsibility is unclear, and the progress is difficult to track. In the construction and configuration process of port renting service, if abnormal conditions occur due to the disconnection of resources and construction, the problems are often reported and processed manually, the problem discovery and solving period is long, the compliance audit of network configuration is usually dependent on manual inspection, the problems of missing detection, false detection and the like exist, and even the problem of service safety of private ports exists. It should be noted that the information disclosed in the above background section is only for enhancing understanding of the background of the present disclosure and thus may include information that does not constitute prior art known to those of ordinary skill in the art. Disclosure of Invention The present disclosure provides a port opening method, apparatus, device, storage medium, and program product, which overcome, at least to some extent, the problem of disjointing from the construction due to resources of port renting services in the related art. Other features and advantages of the present disclosure will be apparent from the following detailed description, or may be learned in part by the practice of the disclosure. According to one aspect of the disclosure, a port opening method is provided and applied to a dispatching center, and the port opening method comprises the steps of obtaining a port renting service opening work order, distributing resource information for the port renting service opening work order, wherein the port renting service opening work order comprises client demand information and port specification information, the resource information comprises port information, IP information and bandwidth information, sending the work order and the resource information to an execution system, enabling the execution system to construct according to the work order and the resource information, feeding back completion reporting information and configuration script information, receiving the completion reporting information and the configuration script information sent by the execution system, and determining completion of the work order in response to the passing of audit. In some embodiments, the dispatching center comprises a customer relation management system, a layout system and a resource system, wherein the obtaining of the port rental service opening work order and the allocation of resource information for the port rental service opening work order comprise the steps that the customer relation management system obtains a port rental service opening work order request initiated by a user, generates the port rental service opening work order and sends the port rental service opening work order to the layout system, the layout system sends the port rental service opening work order to the resource system, and the resource system allocates resources according to the port rental service opening work order, determines resource information and sends the resource information to the layout system. In some embodiments, after the sending the work order and the resource information to the execution system, the method further comprises the client relationship management system initiating a stop-start work order in response to a stop-start request initiated by the execution system, and the orchestration system initiating a port reassignment in response to a reassignment request initiated by the execution system. In some embodiments, before the receipt of the job ticket completion information of the execution system and the completion of the job ticket, the method further includes performing a delta comparison of the configuration script information with the resource information, the product opening requirements of the customer relationship management system, and the actual configuration of the existing network device, respectively, and receiving the job ticket completion information of the execution system and the completion of the job ticket in response to the audit pass. In some embodiments, the method further comprises synchronizing audit exception information to the execution system through the orchestration system in response to the a