CN-224200122-U - Assembled furred ceiling subassembly and furred ceiling system
Abstract
The disclosure relates to the technical field of architectural decoration and provides an assembled ceiling assembly and a ceiling system. The assembled suspended ceiling assembly comprises an overhaul component, wherein the overhaul component comprises a horizontal part, a left vertical part and a left lap joint part, a right vertical part and a right lap joint part are horizontally extended from the upper end of the left vertical part to the left, the right lap joint part is horizontally extended from the upper end of the right vertical part to the right, the lower surfaces of the left lap joint part and the right lap joint part are provided with first magnets, the heights of the left vertical part and the right vertical part are equal, an overhaul port is arranged on a suspended ceiling plate main body, a second magnet is positioned on the upper surface of the suspended ceiling plate main body at the edge position of the overhaul port, and the overhaul port is matched with the size of the horizontal part, and the first magnets can be overlapped above the second magnets. The technical scheme of the embodiment of the disclosure can enable the installation and disassembly processes of the access opening baffle of the suspended ceiling to be simple and convenient.
Inventors
- YU GUANG
- JIN YIMENG
- ZHONG WEI
Assignees
- 重庆集凯科技服务有限公司
Dates
- Publication Date
- 20260505
- Application Date
- 20250211
Claims (10)
- 1. A fabricated ceiling assembly, the fabricated ceiling assembly comprising: The maintenance component comprises a horizontal part which horizontally extends, a left vertical part which vertically extends upwards from the left end of the horizontal part, a left lap joint part which horizontally extends leftwards from the upper end of the left vertical part, a right vertical part which vertically extends upwards from the right end of the horizontal part, and a right lap joint part which horizontally extends rightwards from the upper end of the right vertical part, wherein the lower surfaces of the left lap joint part and the right lap joint part are provided with first magnets, and the left vertical part and the right vertical part are equal in height; The suspended ceiling plate comprises a suspended ceiling plate main body and a second magnet, wherein an access hole is formed in the suspended ceiling plate main body, the second magnet is located on the upper surface of the suspended ceiling plate main body at the edge position of the access hole, the access hole is matched with the horizontal part in size, and the first magnet can be lapped above the second magnet.
- 2. The fabricated ceiling assembly of claim 1, wherein a height of the left upright is equal to a sum of thicknesses of the first magnet, the second magnet, and the ceiling tile body.
- 3. The fabricated suspended ceiling assembly of claim 1, wherein the service member further comprises a front vertical portion extending vertically upward from a front end of the horizontal portion, a front overlap portion extending horizontally forward from an upper end of the front vertical portion, a rear vertical portion extending vertically upward from a rear end of the horizontal portion, a rear overlap portion extending horizontally rearward from an upper end of the rear vertical portion, lower surfaces of the front overlap portion and the rear overlap portion being provided with a first magnet, the front vertical portion, the rear vertical portion and the left vertical portion being equal in height.
- 4. The fabricated ceiling assembly of claim 1, wherein the first magnet is fixedly connected to the first left landing portion by a screw or adhesive, the first magnet is fixedly connected to the right landing portion by a screw or adhesive, and the second magnet is fixedly connected to the ceiling tile body by a screw or adhesive.
- 5. The fabricated ceiling assembly of claim 1, wherein a lower surface of the horizontal portion is provided with a facing layer.
- 6. The fabricated ceiling assembly of claim 1, wherein a lower surface of the ceiling tile is provided with a facing layer.
- 7. The fabricated ceiling assembly of claim 1, wherein a groove is formed between the left vertical portion, the right vertical portion, and the horizontal portion, and a thermal insulation layer is provided at the bottom of the groove.
- 8. The fabricated ceiling assembly of claim 1, wherein the ceiling tile has a honeycomb structure.
- 9. The fabricated ceiling assembly of any one of claims 1 to 8, wherein the first magnet and the second magnet are identical in shape and size.
- 10. A suspended ceiling system comprising the fabricated suspended ceiling assembly of any one of claims 1 to 9, wherein a ceiling tile of the fabricated suspended ceiling assembly is mounted to a top wall, and wherein an access member of the fabricated suspended ceiling assembly is overlapped over an edge of an access opening of the ceiling tile body by left and right overlapping portions.
Description
Assembled furred ceiling subassembly and furred ceiling system Technical Field The disclosure relates to the technical field of architectural decoration, in particular to an assembled ceiling assembly and a ceiling system. Background Ceiling hoisting refers to the installation of fixing a decorative material of a ceiling to the top of a building through a hanger or a supporting structure to form a suspended ceiling. The mode can shield pipelines, structural beams and the like on the ceiling, adjust layering and stereoscopic impression in a room, insulate sound, heat and heat, and improve comfort and energy conservation in the room. The ceiling is generally reserved with an access opening, and the access opening is covered by a removable access opening baffle, which can be opened during maintenance. In order to ensure that the detachable baffle of the access opening is not easy to fall off from the suspended ceiling, the detachable baffle of the access opening is required to be fixedly installed with the suspended ceiling through a complicated installation process, and correspondingly, the detachment process of the detachable baffle of the access opening is also complicated. Disclosure of utility model In view of this, the embodiment of the disclosure provides an assembled suspended ceiling assembly and a suspended ceiling system, so as to solve the technical problem that the installation and disassembly processes of an access opening baffle of a suspended ceiling in the prior art are complex. In order to achieve the above purpose, the technical scheme adopted in the present disclosure is as follows: In a first aspect, an embodiment of the disclosure provides an assembled suspended ceiling assembly, which comprises an overhaul component, an overhaul component and a suspended ceiling, wherein the overhaul component comprises a horizontal part which extends horizontally, a left vertical part which extends vertically upwards from the left end of the horizontal part to form, a left lap joint part which extends horizontally leftwards from the upper end of the left vertical part to form, a right vertical part which extends vertically upwards from the right end of the horizontal part to form, and a right lap joint part which extends horizontally rightwards from the upper end of the right vertical part, the lower surfaces of the left lap joint part and the right lap joint part are provided with first magnets, the left vertical part is equal to the right vertical part in height, the suspended ceiling comprises a suspended ceiling main body and second magnets, the suspended ceiling main body is provided with overhaul holes, the second magnets are positioned on the upper surface of the suspended ceiling main body at the edge positions of the overhaul holes, the overhaul holes are matched with the sizes of the horizontal parts, and the first magnets can be lapped above the second magnets. In some embodiments, the height of the left upright is equal to the sum of the thicknesses of the first magnet, the second magnet, and the ceiling tile body. In some embodiments, the service member further includes a front vertical portion extending vertically upward from a front end of the horizontal portion, a front lap portion extending horizontally forward from an upper end of the front vertical portion, a rear vertical portion extending vertically upward from a rear end of the horizontal portion, a rear lap portion extending horizontally rearward from an upper end of the rear vertical portion, the lower surfaces of the front lap portion and the rear lap portion being provided with a first magnet, the front vertical portion, the rear vertical portion and the left vertical portion being equal in height. In some embodiments, the first magnet is fixedly connected to the first left landing portion by a screw or glue, the first magnet is fixedly connected to the right landing portion by a screw or glue, and the second magnet is fixedly connected to the ceiling tile body by a screw or glue. In some embodiments, the lower surface of the horizontal portion is provided with a facing layer. In some embodiments, the lower surface of the ceiling tile is provided with a facing layer. In some embodiments, grooves are formed among the left vertical part, the right vertical part and the horizontal part, and heat and sound insulation layers are arranged at the bottoms of the grooves. In some embodiments, the ceiling tile has a honeycomb structure. In some embodiments, the first magnet and the second magnet are identical in shape and size. In a second aspect, the disclosed embodiments provide a ceiling system comprising the fabricated ceiling assembly of the first aspect of the disclosed embodiments, wherein a ceiling tile of the fabricated ceiling assembly is mounted on a top wall, and an access member of the fabricated ceiling assembly is overlapped over an edge of an access opening of a ceiling tile body by a left overlap and a right overlap. Com