CN-224200227-U - Cement mortar circular arc angle construction device capable of continuously distributing materials for one-step forming
Abstract
The utility model relates to a cement mortar circular arc angle construction device with continuous material distribution and one-step molding, which comprises a driving part, a frame, wheels, a storage bin, a first plastering mechanism and a second plastering mechanism, wherein the frame is of a rectangular frame structure, the wheels, the driving part, the storage bin, the first plastering mechanism and the second plastering mechanism are all arranged on the frame, the driving part is in transmission connection with the wheels and can drive the wheels to rotate, the first plastering mechanism and the second plastering mechanism are arranged side by side, and a discharge hole of the storage bin is positioned at the front side or the rear side of the first plastering mechanism and the second plastering mechanism. The cement mortar arc angle construction device can realize the transportation of cement mortar and the one-step forming of the construction plastering of the mortar arc angle, reduce the repeated material carrying by personnel in the construction process, reduce the labor intensity, accelerate the construction speed and improve the construction quality.
Inventors
- QIU CHENGLONG
- REN CHAO
- CHE PENGCHAO
- Zhou Sankai
- SUN ZHIQIANG
- YU WEI
- ZHANG AN
- PENG TAO
- ZHANG JIAWEI
Assignees
- 中交路桥建设有限公司
- 中交瑞通建筑工程有限公司
Dates
- Publication Date
- 20260505
- Application Date
- 20250415
Claims (10)
- 1. The cement mortar circular arc angle construction device capable of achieving continuous material distribution one-step forming is characterized by comprising a driving part, a frame, wheels, a storage bin, a first plastering mechanism and a second plastering mechanism, wherein the frame is of a rectangular frame structure, the wheels, the driving part, the storage bin, the first plastering mechanism and the second plastering mechanism are all arranged on the frame, the driving part is connected with the wheels in a transmission mode and can drive the wheels to rotate, the first plastering mechanism and the second plastering mechanism are arranged side by side, and a discharge hole of the storage bin is located on the front side or the rear side of the first plastering mechanism and the second plastering mechanism.
- 2. The cement mortar circular arc angle construction device formed by continuous material distribution at one time according to claim 1, wherein the first plastering mechanism comprises a first circular arc-shaped half pipe, the second plastering mechanism comprises a second circular arc-shaped half pipe, the first circular arc-shaped half pipe and the second circular arc-shaped half pipe are of linear structures, the first circular arc-shaped half pipe and the second circular arc-shaped half pipe are arranged on the same side of a discharge hole of the storage bin at intervals side by side, one end of the first circular arc-shaped half pipe and one end of the second circular arc-shaped half pipe are both rotationally connected to a frame, the other end of the first circular arc-shaped half pipe and the other end of the second circular arc-shaped half pipe are both obliquely arranged to extend forwards downwards or obliquely downwards backwards, and the circular arc-shaped outer side walls of the first circular arc-shaped half pipe and the second circular arc-shaped outer side wall of the second circular arc-shaped half pipe are both arranged backwards or forwards.
- 3. The construction device for the circular arc angle of the cement mortar formed by one-step continuous material distribution according to claim 2, wherein a first rotating shaft and a second rotating shaft which are arranged at intervals from front to back are arranged at the upper end of one side of the frame, one end of the first circular arc-shaped half pipe is rotationally connected to the first rotating shaft, and one end of the second circular arc-shaped half pipe is rotationally connected to the second rotating shaft.
- 4. The cement mortar circular arc angle construction device formed by one-step continuous material distribution according to claim 3, wherein one end of the first circular arc-shaped half pipe is rotatably connected to the first rotating shaft through a first sleeve, and one end of the second circular arc-shaped half pipe is rotatably connected to the second rotating shaft through a second sleeve.
- 5. The continuous-distribution one-step-forming cement mortar arc angle construction device according to claim 4, wherein a first connecting plate which is vertically arranged is fixed on the outer side wall of the first sleeve, a second connecting plate which is vertically arranged is fixed on the outer side wall of the second sleeve, one end of the first arc-shaped half pipe is fixed on the first connecting plate, and one end of the second arc-shaped half pipe is fixed on the second connecting plate.
- 6. The cement mortar circular arc angle construction device formed by continuous material distribution once according to claim 5, wherein a first adjusting plate and a second adjusting plate are vertically arranged at the upper end of one side of the frame, the first adjusting plates are arranged at the front side or the rear side of the first connecting plate at intervals, the second adjusting plates are arranged at the front side or the rear side of the second connecting plate at intervals, one end of each of the first adjusting plates and the first circular arc-shaped half pipe is penetrated with a first adjusting screw rod, one end of each of the second adjusting plates and the second circular arc-shaped half pipe is penetrated with a second adjusting screw rod, the first adjusting screw rods on the front side and the rear side of each of the first circular arc-shaped half pipe are connected with a first adjusting nut and a second adjusting nut in a threaded manner, and the second adjusting screw rods on the front side and the rear side of each of the second circular arc-shaped half pipe are connected with a third adjusting nut and a fourth adjusting nut in a threaded manner.
- 7. The continuous-distribution one-step-molding cement mortar circular arc angle construction device according to claim 6, wherein a first limiting plate is arranged on one end opening side of the first circular arc-shaped half pipe, a second limiting plate is arranged on one end opening side of the second circular arc-shaped half pipe, the first adjusting screw penetrates through the first limiting plate, a first adjusting nut is arranged on the outer side of the first limiting plate, and the second adjusting screw penetrates through the second limiting plate, and a second adjusting nut is arranged on the outer side of the second limiting plate.
- 8. The cement mortar circular arc angle construction device formed by continuous material distribution once according to claim 1, wherein a discharging part extending towards one side is arranged at the bottom of the storage bin, the discharging part is of a horn-shaped structure, one end of the discharging part, deviating from the storage bin, is a discharging hole, and a vibrating motor is arranged at the bottom of the discharging part.
- 9. The continuous-distribution one-step-forming cement mortar arc angle construction device according to claim 8, wherein an insertion slot is formed in the upper surface of the discharging part, and a discharging control insertion plate is inserted in the insertion slot.
- 10. The continuous-distribution one-step-forming cement mortar arc angle construction device according to claim 1, wherein the driving part is a variable frequency motor, an armrest is arranged at the upper end of the front side or the rear side of the frame, and the driving part is arranged at the front side or the rear side of the bin.
Description
Cement mortar circular arc angle construction device capable of continuously distributing materials for one-step forming Technical Field The utility model relates to the technical field related to building construction, in particular to a cement mortar circular arc angle construction device with continuous material distribution and one-step molding. Background In the construction engineering waterproof construction, the internal corner of the paving coiled material is smeared with cement mortar into an arc before the paving of the waterproof coiled material or the coating, so that the paving of the waterproof coiled material is convenient. Because the cement mortar circular arc construction, the required mortar amount is small, the construction distance is long, the cement mortar transportation and the cement mortar circular arc angle construction all need to be performed by pure manual work, the construction speed is low, and the construction forming quality is poor. Disclosure of utility model The utility model provides a cement mortar circular arc angle construction device capable of realizing one-step forming by continuous material distribution, aiming at solving one or more of the technical problems in the prior art. The technical scheme includes that the cement mortar arc angle construction device capable of achieving one-time forming through continuous material distribution comprises a driving part, a frame, wheels, a bin, a first plastering mechanism and a second plastering mechanism, wherein the frame is of a rectangular frame structure, the wheels, the driving part, the bin, the first plastering mechanism and the second plastering mechanism are all arranged on the frame, the driving part is in transmission connection with the wheels and can drive the wheels to rotate, the first plastering mechanism and the second plastering mechanism are arranged side by side, and a discharge hole of the bin is located on the front side or the rear side of the first plastering mechanism and the second plastering mechanism. The cement mortar arc angle construction device has the advantages that the cement mortar arc angle construction device can realize the transportation of cement mortar and the one-step forming of the construction plastering of the mortar arc angle, reduce the number of times of material conveying by personnel in the construction process, reduce the labor intensity, accelerate the construction speed and improve the construction quality. On the basis of the technical scheme, the utility model can be improved as follows. Further, the first plastering mechanism comprises a first arc-shaped half pipe, the second plastering mechanism comprises a second arc-shaped half pipe, the first arc-shaped half pipe and the second arc-shaped half pipe are of linear structures, the first arc-shaped half pipe and the second arc-shaped half pipe are arranged on the same side of a discharge hole of the storage bin at intervals side by side, one end of the first arc-shaped half pipe and one end of the second arc-shaped half pipe are both rotationally connected to the frame, the other end of the first arc-shaped half pipe and the other end of the second arc-shaped half pipe are both obliquely arranged in a forward lower direction or obliquely extending mode in a backward lower direction, and the arc-shaped outer side wall of the first arc-shaped half pipe and the arc-shaped outer side wall of the second arc-shaped half pipe are both arranged backwards or are arranged forwards. The further scheme has the beneficial effects that by arranging the two arc-shaped half pipes, cement mortar can be smeared on the ends of the arc-shaped half pipes twice, and the one-time forming rough plastering work and the secondary plastering and light-receiving work of the arc angles of the mortar are realized. Further, the upper end of one side of the frame is provided with a first rotating shaft and a second rotating shaft which are arranged at intervals from front to back, one end of the first arc-shaped half pipe is rotationally connected to the first rotating shaft, and one end of the second arc-shaped half pipe is rotationally connected to the second rotating shaft. The technical scheme has the beneficial effects that the front and back angles of the two arc-shaped half pipes can be conveniently adjusted according to the needs by arranging the two rotating shafts. Further, one end of the first arc-shaped half pipe is rotationally connected to the first rotating shaft through a first sleeve, and one end of the second arc-shaped half pipe is rotationally connected to the second rotating shaft through a second sleeve. Further, a first connecting plate which is vertically arranged is fixed on the outer side wall of the first sleeve, a second connecting plate which is vertically arranged is fixed on the outer side wall of the second sleeve, one end of the first arc-shaped half pipe is fixed on the first connecting plate, and one end of the