Abstract

The utility model provides a sundry fishing tool applicable to multiple specifications of photovoltaic pile holes. The sundry fishing tool suitable for the multi-specification photovoltaic pile holes comprises a first rack rod and a second rack rod, wherein the first rack rod consists of a first steel pipe, a third extension rod and a first extension rod, the second rack rod consists of a second steel pipe, a fourth extension rod and a second extension rod, and a first welding lug and a second welding lug which are respectively arranged on the first extension rod and the second extension rod, and the same control spring is arranged between the first welding lug and the second welding lug. The sundry fishing tool suitable for the multi-specification photovoltaic pile holes solves the technical problem that sand and stones at the top and the inner wall of the holes can fall into the holes to influence the subsequent concrete pouring quality when the holes are drilled in the construction of the sandy soil geological environment.

Inventors

  • WANG ZIQIAO
  • LI FUJUN
  • Qian Kanglong
  • XIAO JUN
  • YANG LUMIN
  • YANG YUN
  • LIU ZEFANG
  • QIAN CHUNHONG
  • YANG QUAN
  • YANG QIWEI
  • LI CHENGLIN

Assignees

  • 云南耀荣电力有限公司
  • 中国能源建设集团云南火电建设有限公司

Dates

Publication Date
20260505
Application Date
20250626

Claims (7)

  1. 1. Be suitable for debris of many specifications photovoltaic stake hole and drag for instrument, a serial communication port includes: The novel steel frame comprises a first frame rod (15) and a second frame rod (16), wherein the first frame rod (15) consists of a first steel tube (1), a third extension rod (13) and a first extension rod (3), and the second frame rod (16) consists of a second steel tube (2), a fourth extension rod (14) and a second extension rod (4); The first welding lug (5) and the second welding lug (6) are respectively arranged on the first extension bar (3) and the second extension bar (4), and the same control spring (7) is arranged between the first welding lug (5) and the second welding lug (6); The first support piece (9) and the second support piece (10) are respectively arranged on the first extension bar (3) and the second extension bar (4), and the first support piece (9) and the second support piece (10) are connected through a positioning bolt (8); The first conical shovel (11) and the second conical shovel (12) are respectively arranged at the bottom ends of the first extension rod (3) and the second extension rod (4) and used for picking up sundries.
  2. 2. The debris retrieval tool applicable to the multi-specification photovoltaic pile hole according to claim 1, wherein the first steel pipe (1) is in threaded connection with the third extension bar (13), and the second steel pipe (2) is in threaded connection with the fourth extension bar (14).
  3. 3. The debris retrieval tool for a multi-specification photovoltaic pile hole according to claim 1, wherein the third extension bar (13) is in threaded connection with the first extension bar (3), and the fourth extension bar (14) is in threaded connection with the second extension bar (4).
  4. 4. The debris retrieval tool applicable to the multi-specification photovoltaic pile hole according to claim 1, wherein the first conical shovel (11) is connected with the first extension rod (3) through welding, and the second conical shovel (12) is connected with the second extension rod (4) through welding.
  5. 5. The debris retrieval tool applicable to the multi-specification photovoltaic pile hole according to claim 1, wherein the first welding lug (5) is connected with the first extension rod (3) through welding, and the second welding lug (6) is connected with the second extension rod (4) through welding.
  6. 6. The debris retrieval tool applicable to the multi-specification photovoltaic pile hole according to claim 1, wherein the control spring (7) is arranged between the first extension bar (3) and the second extension bar (4) through a first welding lug (5) and a second welding lug (6), and the control spring (7) is used for controlling the opening and closing of the first conical shovel (11) and the second conical shovel (12).
  7. 7. The debris retrieval tool for a multi-specification photovoltaic pile hole according to claim 1, wherein the first support member (9) is welded to the first extension bar (3), and the second support member (10) is welded to the second extension bar (4).

Description

Sundry fishing tool applicable to multiple specifications of photovoltaic pile holes Technical Field The utility model relates to the technical field of photovoltaic pile construction, in particular to a sundry fishing tool suitable for multiple specifications of photovoltaic pile holes. Background When the foundation of the photovoltaic power station is constructed, holes are drilled in a construction and installation site for pre-burying the photovoltaic piles, and concrete is poured. After the holes are drilled in the construction of the sandy soil geological environment, sand and stones on the tops and the inner walls of the holes are vibrated and fall into the holes to influence the subsequent concrete pouring quality, so that the holes on the photovoltaic construction site need to be cleaned before concrete pouring. Therefore, it is necessary to provide a debris retrieval tool suitable for a plurality of photovoltaic pile holes to solve the above technical problems. Disclosure of utility model The utility model provides a sundry fishing tool suitable for a multi-specification photovoltaic pile hole, which aims to solve the technical problem that after a hole is drilled in a sandy soil geological environment construction, sand and stones on the top and the inner wall of the hole fall into the hole due to vibration to influence on the subsequent concrete pouring quality. The sundry taking tool suitable for the multi-specification photovoltaic pile holes comprises a first hack lever and a second hack lever, wherein the first hack lever consists of a first steel pipe, a third extension bar and a first extension bar, the second hack lever consists of a second steel pipe, a fourth extension bar and a second extension bar, a first welding lug and a second welding lug which are respectively arranged on the first extension bar and the second extension bar, a same control spring is arranged between the first welding lug and the second welding lug, a first supporting piece and a second supporting piece which are respectively arranged on the first extension bar and the second extension bar, the first supporting piece and the second supporting piece are connected through positioning bolts, and a first conical shovel and a second conical shovel which are respectively arranged at the bottom ends of the first extension bar and the second extension bar and used for taking sundries. Preferably, the first steel pipe is connected with the third extension bar through threads, and the second steel pipe is connected with the fourth extension bar through threads. Preferably, the third extension bar is in threaded connection with the first extension bar, and the fourth extension bar is in threaded connection with the second extension bar. Preferably, the first conical shovel is connected with the first extension rod through welding, and the second conical shovel is connected with the second extension rod through welding. Preferably, the first welding lug is connected with the first extension bar through welding, and the second welding lug is connected with the second extension bar through welding. Preferably, the control spring is arranged between the first extension bar and the second extension bar through a first welding lug and the second welding lug, and the control spring is used for controlling the opening and closing of the first conical shovel and the second conical shovel. Preferably, the first support member is connected to the first extension bar by welding, and the second support member is connected to the second extension bar by welding. Compared with the related art, the sundry fishing tool applicable to the multi-specification photovoltaic pile holes has the following beneficial effects: 1. The debris scooping tool has strong applicability, can process clay soil, has strong operability on silt soil, sandy soil and multi-broken stone shale, can process floating soil and debris in corresponding bored concrete pile holes by changing the lengths of the first hack lever and the second hack lever and the outer diameters of the first conical shovel and the second conical shovel according to the diameters and the depths of the bored concrete pile holes, has wide applicability, can quickly clean the floating soil and the debris in the bored concrete pile holes, can smoothly extract the debris in large blocks at the bottom, ensures that the debris cannot fall off again in the lifting process, and can improve the construction speed of constructors and further improve the construction efficiency. 2. The novel pile foundation is convenient to use, the lengths of the first hack lever and the second hack lever are adjustable, the use length can be changed in a splicing mode, meanwhile, the positioning bolts can be detached to disassemble and transport the first conical shovel and the second conical shovel, a downward impact mode is adopted to cut into soil bodies, the soil bodies are cut into the first conical shovel and the