CN-224207285-U - BIM-based pipeline pre-buried installation device for fire-fighting construction of green building
Abstract
The utility model discloses a pipeline pre-buried installation device for fire-fighting construction of a green building based on BIM, which comprises a base, a support frame, a wedge block and a chuck, wherein the base is fixedly provided with the ground rod, the support frame is arranged on the upper surface of the base, the support frame is in contact connection with one side of the wedge block, the wedge block is installed on a second connecting rod, the second connecting rod is connected with a first screw, one end of the first screw is connected with a first bevel gear, the first bevel gear is connected with a second bevel gear, the second bevel gear is installed on the surface of a double-head screw sleeve, one end of the second screw, which is far away from the double-head screw sleeve, is connected with the chuck.
Inventors
- SONG GUOYOU
- XU JUNPING
- HAN YIGANG
- GAO JUN
- FAN YONGWANG
Assignees
- 内蒙古巨华集团大华建筑安装有限公司
Dates
- Publication Date
- 20260508
- Application Date
- 20250227
Claims (5)
- 1. The utility model provides a green building fire construction is with pre-buried installation device of pipeline based on BIM, base (1) fixed establishment is put into ground pole (101), wherein still include support frame (202), wedge (203), chuck (305), base (1) upper surface is provided with support frame (202), the medial surface and the wedge (203) one side contact connection of support frame (202), wedge (203) slidable mounting is on second connecting rod (207), second connecting rod (207) and first screw rod (209) threaded connection, realize the fixed of pipeline and improve the flexibility of centre gripping through removal wedge (203) and support frame (202), first screw rod (209) rotate and install on base (1), first bevel gear (301) of first screw rod (209) one end fixed connection, first bevel gear (301) and second bevel gear (302) meshing connection, second bevel gear (302) fixed mounting is on double-end screw sleeve (303) surface, double-end screw sleeve (303) rotate install in base (1) and second screw rod (304) both ends (304) opposite direction, double-end screw sleeve (303) threaded connection respectively, the chuck (305) is slidably mounted in the base (1), and the stability of the base (1) is improved by the chuck (305).
- 2. The device for pre-burying a pipeline for fire-fighting construction of a green building based on BIM according to claim 1, wherein the upper surface of the base (1) is fixedly connected with one end of a first connecting rod (201), the other end of the first connecting rod (201) is fixedly connected with a supporting frame (202), the supporting frame (202) is semicircular, the inner side surface of the supporting frame (202) is arranged to be an inclined surface, the inner side surface of the supporting frame (202) is in contact connection with one side of a wedge block (203), the wedge block (203) is fixedly connected with one end of a sliding rod (204), the other end of the sliding rod (204) penetrates through the driven rod (205) and is in sliding connection with the driven rod (205), the sliding rod (204) penetrates through one end of a first spring (206), the other end of the first spring (206) is fixedly connected with the driven rod (205), the driven rod (205) is fixedly connected with a second connecting rod (207), the second connecting rod (207) is slidably mounted in the base (1), a threaded ring (208) is fixedly arranged in the middle of the second connecting rod (207), and the threaded ring (209) is rotatably connected with the first screw rod (209).
- 3. The BIM-based pipeline pre-buried installation device for fire construction of green building is characterized in that a toothed plate (401) is installed in a sliding mode in the base (1), a rack (402) is fixedly arranged on the inner wall of the toothed plate (401), the toothed plate (401) is meshed with a first gear (403) through the toothed plate (402), the first gear (403) is fixedly arranged on the surface of a rotating rod (404), the rotating rod (404) is in spline connection with a spline sleeve (405), the spline sleeve (405) is rotatably installed in the base (1), one surface of the spline sleeve (405) is fixedly connected with one end of a second spring (406), the second spring (406) is sleeved on the surface of the rotating rod (404), the other end of the second spring (406) is fixedly connected with the rotating rod (404), the other end of the rotating rod (404) is in contact connection with the upper surface of a rotary table (407), the rotary table (407) is rotatably installed on the upper end of a base (408), the base (408) is longitudinally and slidably installed in the base (1), one surface of a clamping bracket (409) is fixedly connected with the lower surface of the toothed plate (411), and the lower surface of the toothed plate (411) is fixedly connected with the toothed plate (410), one end of a third spring (412) is fixedly connected to the lower surface of the bracket (409), the other end of the third spring (412) is fixedly connected with the inside of the base (1), one side of the toothed plate (401) is fixedly connected with a connecting plate (413), one end of a supporting rod (414) is hinged to the lower surface of the connecting plate (413), and one end of the connecting plate (413) is fixedly connected with a contact plate (415).
- 4. The BIM-based pipeline pre-buried installation device for fire-fighting construction of green buildings according to claim 3, wherein the toothed plates (401) and related mechanisms are two groups.
- 5. The BIM-based pipeline pre-buried installation device for fire-fighting construction of green buildings, as claimed in claim 2, is characterized in that the surface of the base (1) is provided with a thread piece (102) for clamping the first screw (209).
Description
BIM-based pipeline pre-buried installation device for fire-fighting construction of green building Technical Field The utility model relates to the technical field of pipeline support, in particular to a pipeline pre-buried installation device for fire-fighting construction of a green building based on BIM. Background The fire-fighting pipeline is used for fire-fighting, connecting fire-fighting equipment and equipment, conveying fire-fighting water, gas or other medium pipeline materials, at present, in the building construction engineering, the selection of the fire-fighting pipeline depends on the building scale and related fire-fighting requirements, the adopted fire-fighting pipeline is different, when the fire-fighting pipeline is installed facing different pipelines, the traditional U-shaped clamp lacks flexibility and cannot be adjusted, and because the fire-fighting pipeline is connected through flanges or other connecting parts, when the pipeline is embedded, the fixing of the pipeline position needs to be ensured, and the displacement of the pipeline caused by the embedding of soil or the embedding of other pipelines is avoided. To solve the above problems, the following solutions are proposed. Disclosure of utility model The utility model aims to provide a BIM-based pipeline embedded installation device for fire-fighting construction of a green building, which aims to solve the problems in the background technology. The utility model provides a pipeline pre-buried installation device for green building fire construction based on BIM, which comprises a base, a support frame, a wedge block and a chuck, wherein the base is fixedly provided with a ground rod, the support frame is arranged on the upper surface of the base, the inner side surface of the support frame is in contact connection with one side of the wedge block, the wedge block is slidably arranged on a second connecting rod, the second connecting rod is in threaded connection with a first screw rod, the fixing of a pipeline is realized by moving the wedge block and the support frame, the first screw rod is rotatably arranged on the base, one end of the first screw rod is fixedly connected with a first bevel gear, the first bevel gear is in meshed connection with a second bevel gear, the second bevel gear is fixedly arranged on the surface of a double-head screw sleeve, the double-head screw sleeve is rotatably arranged in the base, the two ends of the double-head screw sleeve are respectively in threaded connection with the second screw rods, the threads on the two second screw rods are opposite in directions, one end of the second screw rod, which is far away from the double-head screw sleeve is fixedly connected with the chuck, the chuck is slidably arranged in the base, and the stability of the base is improved through the chuck. Preferably, the first connecting rod one end of fixed surface connection on the base, first connecting rod other end fixed connection support frame, the support frame is semi-circular, the medial surface of support frame sets up to the inclined plane, the medial surface of support frame is connected with wedge one side contact, wedge and slide bar one end fixed connection, the slide bar other end passes the driven lever and with driven lever sliding connection, the slide bar passes driven lever end fixed connection first spring one end, shown first spring other end and driven lever fixed connection, driven lever and second connecting rod fixed connection, second connecting rod slidable mounting is in the base, second connecting rod middle part is fixed to set up the screwed ring, screwed ring and first screw rod threaded connection, first screw rod rotation is installed in the base, realize the fixed of pipeline through wedge and support frame. Preferably, one end of the first screw rod is fixedly connected with the first bevel gear, the first bevel gear is meshed with the second bevel gear, the second bevel gear is fixedly installed on the surface of the double-head screw sleeve, the double-head screw sleeve is rotatably installed in the base, the two ends of the double-head screw sleeve are respectively connected with the second screw rods in a threaded mode, the directions of threads on the two second screw rods are opposite, one end, far away from the double-head screw sleeve, of the second screw rod is fixedly connected with the chuck, the chuck is slidably installed in the base, and clamping holes are formed in the chuck. Preferably, the rack is fixedly arranged on the inner wall of the rack, the rack is connected with the first gear in a meshed manner, the first gear is fixedly arranged on the surface of the rotating rod, the rotating rod is connected with the spline sleeve in a spline manner, the spline sleeve is rotationally arranged in the base, one side of the spline sleeve is fixedly connected with one end of the second spring, the second spring is sleeved on the rotating rod in a penetrating mann