CN-224212310-U - Tower crane big arm pull rod installation appurtenance
Abstract
The utility model belongs to the technical field of tower crane installation, and discloses an auxiliary tool for installing a large-arm pull rod of a tower crane, which comprises a base, wherein a tower body is detachably arranged at the top end of the base, a crane arm is detachably arranged at the top end of the left side of the tower body, a fixed frame is clamped at the top end of the left side of the crane arm, a first fixed column is fixedly arranged at the top end of the fixed frame, a lifting ring is fixedly arranged at the top end of the first fixed column, and a safety cable is arranged in the lifting ring.
Inventors
- ZHENG FEI
- CHEN QIAOLING
- XU HAIJIE
- HE YIMING
- CHEN JUN
Assignees
- 中建海峡建设发展有限公司
Dates
- Publication Date
- 20260508
- Application Date
- 20250529
Claims (6)
- 1. The utility model provides a big arm pull rod installation appurtenance of tower crane, includes base (1), its characterized in that, the top of base (1) can be dismantled and be equipped with body of a tower (2), the left side top of body of a tower (2) can be dismantled and be equipped with cargo boom (3), the left side top block of cargo boom (3) is equipped with fixed frame (8), the top of fixed frame (8) is fixed and is equipped with first fixed column (4), the top of first fixed column (4) is fixed and is equipped with rings, the inside of rings is provided with safety rope (5).
- 2. The auxiliary tool for installing the large arm pull rod of the tower crane according to claim 1, wherein the bolt (9) is detachably arranged at the bottom end of the right side of the fixed frame (8), the bolt (9) penetrates through the right side of the fixed frame (8), the nut (10) is spirally arranged at the upper part of the bolt (9) in a rotating mode, and the bottom end of the nut (10) is attached to the top end of the right side of the fixed frame (8).
- 3. The auxiliary tool for installing the large-arm pull rod of the tower crane is characterized in that a second fixing column (6) is fixedly arranged at the top end of the middle of the crane arm (3), and a hanging ring is fixedly arranged at the top end of the second fixing column (6).
- 4. The auxiliary tool for installing the large-arm pull rod of the tower crane is characterized in that a third fixing column (7) is fixedly arranged at the top end of the right side of the lifting arm (3), and a lifting ring is fixedly arranged at the top end of the third fixing column (7).
- 5. The auxiliary tool for installing the large arm pull rod of the tower crane according to claim 1, wherein the middle part of the outer side of the safety cable (5) penetrates through the top hanging ring of the second fixing column (6) and is detachably connected with the top hanging ring of the third fixing column (7).
- 6. The auxiliary tool for installing the large-arm pull rod of the tower crane, which is disclosed in claim 1, is characterized in that a balance arm (11) is detachably arranged at the top end of the right side of the tower body (2).
Description
Tower crane big arm pull rod installation appurtenance Technical Field The utility model belongs to the technical field of tower crane installation, and particularly relates to an auxiliary tool for installing a large-arm pull rod of a tower crane. Background Tower crane is called tower crane for short, also called tower crane, originated from western europe. And the movable arm is arranged on the rotary crane at the upper part of the high-rise tower body. The working space is large, and the device is mainly used for vertical and horizontal conveying of materials and installation of building components in house building construction. When the tower crane is installed, particularly the big arm is installed, the trolley cannot be used when a pull rod (a pull rod pin shaft is installed), so that an installer needs to walk on the big arm of the tower crane, the pin shaft is installed at the position of the pull rod, the tower body passes to the installation position of the pull rod, the potential safety hazard is extremely high, and a plurality of installers drop from the big arm when the installment is carried out. Therefore, we propose a tower crane big arm pull rod installation appurtenance. Disclosure of utility model In order to solve the problems in the prior art, the utility model provides an auxiliary tool for installing a large-arm pull rod of a tower crane, which has the advantage of ensuring the passing safety of an installer when the installer passes on a large arm to the greatest extent when the tower crane is installed. In order to achieve the purpose, the technical scheme is that the auxiliary tool for installing the large arm pull rod of the tower crane comprises a base, a tower body is detachably arranged at the top end of the base, a lifting arm is detachably arranged at the left top end of the tower body, a fixing frame is clamped at the left top end of the lifting arm, a first fixing column is fixedly arranged at the top end of the fixing frame, a lifting ring is fixedly arranged at the top end of the first fixing column, and a safety cable is arranged in the lifting ring. Preferably, the right bottom end of the fixed frame can be detachably provided with a bolt, the bolt penetrates through the right side of the fixed frame, the upper portion of the bolt is spirally rotated to be provided with a nut, and the bottom end of the nut is attached to the right top end of the fixed frame. Preferably, a second fixing column is fixedly arranged at the top end of the middle of the lifting arm, and a lifting ring is fixedly arranged at the top end of the second fixing column. Preferably, a third fixing column is fixedly arranged at the top end of the right side of the lifting arm, and a lifting ring is fixedly arranged at the top end of the third fixing column. Preferably, the middle part of the outer side of the safety cable penetrates through the top hanging ring of the second fixing column and is detachably connected with the top hanging ring of the third fixing column. Preferably, a balance arm is detachably arranged at the top end of the right side of the tower body. Compared with the prior art, the utility model has the following beneficial effects: 1. According to the utility model, the fixed frame is arranged on the ground, so that the fixed frame can be fixed on the crane boom through bolts and nuts, the safety of installation personnel can be greatly ensured when the tower crane is installed, and the device is convenient to install, easy to manufacture and low in cost after the assembly of the large crane boom is completed, and has great use significance. Drawings FIG. 1 is a schematic diagram of the overall structure of the present utility model; FIG. 2 is a schematic view of a boom structure according to the present utility model; fig. 3 is a schematic view of a fixing frame structure of the present utility model. In the figure, 1, a base, 2, a tower body, 3, a crane arm, 4, a first fixed column, 5, a safety cable, 6, a second fixed column, 7, a third fixed column, 8, a fixed frame, 9, a bolt, 10, a nut, 11 and a balance arm. Detailed Description The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model. As shown in fig. 1 to 3, the utility model provides an auxiliary tool for installing a large arm pull rod of a tower crane, which comprises a base 1, wherein a tower body 2 is detachably arranged at the top end of the base 1, a lifting arm 3 is detachably arranged at the left top end of the tower body 2, a fixing frame 8 is clamped at the left top end of th