CN-224212505-U - Multifunctional anaerobic tank water distribution and sludge discharge device
Abstract
The utility model discloses a multifunctional anaerobic tank water distribution and sludge discharge device which comprises a connecting component, a water distribution main pipe, a plurality of water distribution branch pipes, a sludge discharge main pipe and a plurality of sludge discharge branch pipes. The connecting component is internally provided with a water distribution chamber and a sludge collection chamber which are isolated from each other; one end of the main water distribution pipe is communicated with the distribution chamber, the other end of the main water distribution pipe is connected with an external water inlet pipeline, one end of each branch water distribution pipe is fixed on the connecting component and is communicated with the distribution chamber, one end of the main sludge discharge pipe is communicated with the sludge collecting chamber, the other end of the main sludge discharge pipe is respectively connected with the external sludge discharge pipeline and the external water inlet pipeline, and one end of each branch sludge discharge pipe is fixed on the connecting component and is communicated with the sludge collecting chamber. The utility model integrates the functions of sludge discharge and water distribution, can realize the flushing operation of the sludge discharge main pipe, the sludge collecting chamber and the sludge discharge branch pipe through the external water inlet pipeline, slows down the scaling of a sludge discharge system, prolongs the maintenance period and reduces the overhaul cost.
Inventors
- ZHANG HANQIANG
- WANG RAN
- DAI SHIJIN
- ZHANG HUANWEI
- HUANG HUI
- WU LAIGUI
- XU WENJUN
- JIANG GUODING
- CAO ZHIQIANG
- XIONG BIN
Assignees
- 深圳能源资源综合开发有限公司
- 深圳市宝安区市容环境综合管理服务中心
Dates
- Publication Date
- 20260508
- Application Date
- 20250516
Claims (8)
- 1. The utility model provides a multi-functional anaerobic tank water distribution mud discharging device for set up in the anaerobic tank, its characterized in that includes: The connecting component is internally provided with a water distribution chamber and a sludge collection chamber which are isolated from each other; One end of the water distribution main pipe is connected with the connecting assembly and communicated with the water distribution chamber, and the other end of the water distribution main pipe is penetrated and fixed on the side wall of the anaerobic tank and is used for being connected with an external water inlet pipeline; one end of each water distribution branch pipe is fixed on the connecting component and communicated with the water distribution chamber; one end of the sludge discharging main pipe is connected with the connecting assembly and communicated with the sludge collecting chamber, and the other end of the sludge discharging main pipe penetrates through the side wall of the anaerobic tank and is used for being connected with an external sludge discharging pipeline and the external water inlet pipeline through different valves respectively; and one end of each sludge discharge branch pipe is fixed on the connecting assembly and communicated with the sludge collection chamber.
- 2. The multifunctional anaerobic tank water distribution and sludge discharge device according to claim 1, wherein the connecting component is cylindrical, and the water distribution chamber and the sludge collection chamber are integrally designed and separated by a separation plate.
- 3. The multifunctional anaerobic tank water distribution and sludge discharge device according to claim 2, wherein the plurality of water distribution branch pipes are radially distributed on the periphery of the connecting assembly, and the plurality of sludge discharge branch pipes are radially distributed on the periphery of the connecting assembly.
- 4. A multifunctional anaerobic tank water distribution and sludge discharge device as claimed in claim 3, wherein the plurality of water distribution branch pipes and the plurality of sludge discharge branch pipes are staggered in the axial direction of the connecting assembly.
- 5. A multifunctional anaerobic tank water distribution and sludge discharge device according to claim 3, wherein the length of the sludge discharge branch pipe is longer than the length of the water distribution branch pipe.
- 6. A multifunctional anaerobic tank water distribution and sludge discharge device as claimed in claim 3, wherein the plane of the plurality of water distribution branch pipes is located above the plane of the plurality of sludge discharge branch pipes.
- 7. The multifunctional anaerobic tank water distribution and sludge discharge device according to claim 1, wherein one end of the water distribution main pipe far away from the connecting assembly is further used for being connected with an external sludge discharge pipeline and the external water inlet pipeline respectively through different valves.
- 8. The multifunctional anaerobic tank water distribution and sludge discharge device according to claim 1, wherein the water distribution main pipe and the sludge discharge main pipe are arranged in parallel and at intervals up and down.
Description
Multifunctional anaerobic tank water distribution and sludge discharge device Technical Field The utility model relates to the technical field of leachate sewage treatment equipment, in particular to a water distribution and sludge discharge device of a multifunctional anaerobic tank. Background At present, in the leachate sewage treatment process, an anaerobic tank is most commonly used for decomposing organic substances and converting organic wastes into biogas. In the actual operation process of the anaerobic tank, the problems of sludge deposition and scaling seriously affect the treatment efficiency and the operation stability. Wherein, because of the too high concentration of calcium and magnesium ions in the sludge deposition and scaling process, scaling is easy to generate, and the scaling cannot be avoided, thereby causing water outlet blockage and directly affecting the treatment efficiency of the anaerobic tank. Thus, the problem of sludge deposition is a major problem in the operation of anaerobic tanks. Since sewage contains a large amount of suspended substances and colloidal substances, these substances gradually precipitate and accumulate at the bottom of the anaerobic tank during the anaerobic reaction. If the deposited sludge cannot be discharged comprehensively and effectively, the sludge is accumulated in the tank continuously. On one hand, excessive sludge accumulation occupies the effective volume of the anaerobic tank, reduces the sewage treatment capacity and the equipment treatment capacity, and on the other hand, long-term sludge deposition can cause sludge aging and hardening to influence the activity and the metabolic function of anaerobic microorganisms, thereby reducing the anaerobic reaction efficiency and the treatment effect. Secondly, the concentration of calcium and magnesium ions in the leachate sewage is too high, scaling is easy to generate, and the inner diameter of the pipeline is reduced. If the water outlet pipeline is blocked seriously or even completely due to scaling, the water flow section is reduced, and the water flow resistance is increased, so that the water outlet is not smooth, and the normal operation of the sewage treatment system is affected. In the sludge discharge pipe, the scale formation may hinder smooth discharge of sludge, cause sludge accumulation, and may also cause equipment malfunction, increasing maintenance costs and downtime. In view of the foregoing, it is desirable to provide a multifunctional anaerobic tank water distribution and sludge discharge device to overcome the above-mentioned drawbacks. Disclosure of utility model The utility model aims to provide a multifunctional anaerobic tank water distribution and sludge discharge device, which aims to solve the problem that a sludge discharge pipeline of an anaerobic tank is easy to scale, and a sludge discharge system can be backwashed through an external water inlet pipeline, so that the scale of the pipeline is slowed down, the maintenance period is prolonged, and the overhaul cost is reduced. In order to achieve the above purpose, the present utility model provides a multifunctional anaerobic tank water distribution and sludge discharge device, which is configured to be disposed in an anaerobic tank, and comprises: The connecting component is internally provided with a water distribution chamber and a sludge collection chamber which are isolated from each other; One end of the water distribution main pipe is connected with the connecting assembly and communicated with the water distribution chamber, and the other end of the water distribution main pipe is penetrated and fixed on the side wall of the anaerobic tank and is used for being connected with an external water inlet pipeline; one end of each water distribution branch pipe is fixed on the connecting component and communicated with the water distribution chamber; one end of the sludge discharging main pipe is connected with the connecting assembly and communicated with the sludge collecting chamber, and the other end of the sludge discharging main pipe penetrates through the side wall of the anaerobic tank and is used for being connected with an external sludge discharging pipeline and the external water inlet pipeline through different valves respectively; and one end of each sludge discharge branch pipe is fixed on the connecting assembly and communicated with the sludge collection chamber. In a preferred embodiment, the connecting component is cylindrical, and the water distribution chamber and the sludge collection chamber are integrally designed and separated by a separation plate. In a preferred embodiment, the plurality of water distribution branch pipes are radially distributed on the periphery of the connecting assembly, and the plurality of mud discharge branch pipes are radially distributed on the periphery of the connecting assembly. In a preferred embodiment, the plurality of water distribution branch pipes and the