Search

CN-224213213-U - Water conservancy and hydropower dyke heightening structure

CN224213213UCN 224213213 UCN224213213 UCN 224213213UCN-224213213-U

Abstract

The utility model discloses a water conservancy and hydropower embankment heightening structure which comprises a plurality of upright posts, wherein the upright posts are uniformly arranged on the side of a dyke, the bottoms of the upright posts are fixedly connected with a bottom plate, the bottom plate is fixed on the dyke through bolts, clamping grooves are formed in two sides of the upright posts, a first baffle plate is arranged between the upright posts, a plurality of second baffles are sequentially arranged at the tops of the first baffle plates, when the water conservancy and hydropower embankment heightening structure is used, the upright posts are sequentially arranged on the side edge of the embankment through bottom-fixedly connected bottom plates, the first baffle plates and the second baffle plates are clamped with the clamping grooves formed in the side walls of the upright posts through clamping strips arranged at two ends, then the bottom plates are fixedly connected with the dyke through bolts, a rotating rod is rotated through a handle, the threaded parts of the rotating rod enter threaded holes formed in the upright posts, the rotating rod drives a connecting sleeve to move downwards, and the connecting sleeve is clamped with the top of the uppermost second baffle plate through a connecting arm, so that the first baffle plate and the second baffle plate are rapidly fixed, and the device is rapidly installed.

Inventors

  • LIAN WEI
  • YE CHAO
  • Liu Runtai
  • CAO XIAYU

Assignees

  • 长江勘测规划设计研究有限责任公司

Dates

Publication Date
20260508
Application Date
20250411

Claims (6)

  1. 1. A water conservancy and hydropower dyke heightening structure comprises a plurality of upright posts (1) and is characterized in that the upright posts (1) are uniformly arranged on dykes and dams, a bottom plate (9) is fixedly connected to the bottoms of the upright posts (1), clamping grooves (10) are formed in the two sides of the upright posts (1) through bolts, first baffle plates (2) are arranged between the upright posts (1), a plurality of second baffle plates (3) are sequentially arranged at the tops of the first baffle plates (2) and the second baffle plates (3), clamping strips (11) are arranged on the two sides of the first baffle plates (2) and the second baffle plates (3), the clamping strips (11) are clamped in the clamping grooves (10) formed in the upright posts (1), rotating rods (13) are arranged at the tops of the upright posts (1), threaded portions of the rotating rods (13) are in threaded connection with threaded holes formed in the tops of the upright posts (1), handles (14) are fixedly connected to the tops of the rotating rods (13), connecting sleeves (16) are symmetrically fixedly connected with connecting arms (15), ends of the connecting arms (15) are fixedly connected with clamping sleeves (17), and the uppermost clamping sleeves (17) are clamped at the tops of the second baffle plates (3).
  2. 2. The water conservancy and hydropower embankment heightening structure according to claim 1, wherein the tops of the first baffle (2) and the second baffle (3) are provided with slots (19), the bottoms of the second baffle (3) are fixedly connected with cutting bars (18), and the cutting bars (18) are inserted into adjacent slots (19).
  3. 3. The water conservancy and hydropower embankment heightening structure according to claim 1 is characterized in that a rubber pad (8) is fixedly connected to the bottom of the first baffle (2).
  4. 4. The water conservancy and hydropower embankment heightening structure according to claim 1, wherein an L-shaped plate (12) is fixedly arranged on one side, close to the water surface, of the first baffle plate (2) through bolts, and the bottom of the L-shaped plate (12) is attached to the top surface of the embankment.
  5. 5. The water conservancy and hydropower embankment heightening structure according to claim 1 is characterized in that lifting grooves (4) are symmetrically formed in the outer sides of the first baffle (2) and the second baffle (3).
  6. 6. The water conservancy and hydropower embankment heightening structure according to claim 1, wherein a supporting rod (5) is arranged on one side, far away from the water surface, of the upright post (1), a first connecting seat (6) is hinged to the top of the supporting rod (5) through a pin shaft, the first connecting seat (6) is fixedly connected with the side wall of the upright post (1) through a bolt, a second connecting seat (7) is hinged to the bottom end of the supporting rod (5) through a pin shaft, and the second connecting seat (7) is fixedly installed on a dyke through a bolt.

Description

Water conservancy and hydropower dyke heightening structure Technical Field The utility model relates to the technical field of water conservancy and hydropower engineering, in particular to a water conservancy and hydropower embankment heightening structure. Background Water is the basic element on which humans live, and electricity is the main energy source for social development. The hydraulic and hydroelectric engineering is a particularly important engineering for regulating and utilizing the water energy resources by engineering or non-engineering measures on the basis of the natural characteristic research of water. The water conservancy and hydropower has great effects on the development of society and the production and life of human beings, the embankment is more common in the water conservancy and hydropower engineering, the embankment can be built to prevent the overflow of river water, lake water and sea tides and the disaster caused by flooding, the resident and industrial and agricultural production are protected, and the embankment heightening structure is needed to be utilized to prevent the water level from rising so as to possibly influence the production and life of human beings in the period of more rainwater. However, when the current water conservancy and hydropower embankment heightening structure is installed, a large number of bolts are required for installation, so that the installation efficiency is low, and the water conservancy and hydropower embankment heightening structure is provided for the problems. Disclosure of utility model The utility model aims to provide a water conservancy and hydropower embankment heightening structure so as to solve the problems in the background art. In order to achieve the above purpose, the present utility model provides the following technical solutions: The utility model provides a water conservancy and hydropower dyke heightening structure, includes many stands, the even setting of stand is on dyke side, stand bottom fixedly connected with bottom plate, the bottom plate passes through the bolt fastening on dykes and dams, the draw-in groove has been seted up to the stand both sides, be provided with first baffle between the stand, first baffle top has set gradually a plurality of second baffles, first baffle and second baffle both sides are provided with the card strip, the card strip card is established in the draw-in groove that the stand was seted up, the stand top is provided with the dwang, screw hole threaded connection that screw portion and stand top were seted up of dwang, dwang top fixedly connected with handle, the cover is equipped with the adapter sleeve on the dwang, the fixedly connected with linking arm of adapter sleeve symmetry, linking arm tip fixedly connected with cutting ferrule, the cutting ferrule card is established at the second baffle top of top. As a further scheme of the utility model, slots are formed in the tops of the first baffle and the second baffle, and cutting bars are fixedly connected to the bottoms of the second baffle and inserted into adjacent slots. As a still further scheme of the utility model, the bottom of the first baffle is fixedly connected with a rubber pad. As a still further scheme of the utility model, one side of the first baffle plate, which is close to the water surface, is fixedly provided with an L-shaped plate through bolts, and the bottom of the L-shaped plate is attached to the top surface of the embankment. As a still further scheme of the utility model, lifting grooves are symmetrically formed on the outer sides of the first baffle and the second baffle. As a still further scheme of the utility model, a support rod is arranged on one side of the upright post far away from the water surface, the top of the support rod is hinged with a first connecting seat through a pin shaft, the first connecting seat is fixedly connected with the side wall of the upright post through a bolt, the bottom end of the support rod is hinged with a second connecting seat through a pin shaft, and the second connecting seat is fixedly arranged on a dyke through a bolt. Compared with the prior art, the utility model has the beneficial effects that: 1. When the device is used, the upright posts are sequentially arranged at the edge of the embankment through the bottom plates fixedly connected with the bottom ends, the first baffle plate and the second baffle plate are clamped with the clamping grooves formed in the side walls of the upright posts through the clamping strips arranged at the two ends, then the bottom plates are fixedly connected with the embankment through the bolts, the rotating rod is rotated through the handle, the threaded parts of the rotating rod enter the threaded holes formed in the upright posts, the rotating rod moves downwards along with the connecting sleeves, the connecting sleeves are clamped with the tops of the uppermost second baffle plates through the connecting arms, and