CN-224213221-U - River bank both sides dyke reinforcing construction device
Abstract
The utility model discloses a river bank two-side embankment reinforcement construction device, which relates to the technical field of reinforcement construction and comprises a plurality of sets of embankment support plates which are arranged in parallel, wherein a reinforcement connecting seat is arranged on one side of each embankment support plate, a fixed mounting groove is formed in the other side of each embankment support plate, a plurality of construction pile nail assemblies which are distributed linearly are arranged at the top end of each embankment support plate in a penetrating mode, a first reinforcement mechanism is arranged at one end of each embankment support plate, a second reinforcement mechanism is arranged at the other end of each embankment support plate, the first reinforcement mechanisms and the second reinforcement mechanisms are distributed in a mirror symmetry mode, and the first reinforcement mechanisms and the second reinforcement mechanisms are identical in structure. The utility model has scientific and novel structure, can form a complete river bank dike reinforcing system through the dike supporting plate, the construction pile nail components and reinforcing mechanisms at two ends, realizes the omnibearing protection and reinforcement of the river bank side dike, and greatly improves the scour resistance and the service life of the dike.
Inventors
- SUN MIN
- MENG XIANGCHUN
- WANG MINGCHUAN
Assignees
- 江苏天许建设有限公司
Dates
- Publication Date
- 20260508
- Application Date
- 20250521
Claims (10)
- 1. The utility model provides a construction equipment is consolidated to river bank both sides dyke, its characterized in that, including dyke backup pad (1) that a plurality of groups set up side by side, one side of dyke backup pad (1) is provided with consolidates connecting seat (2), fixed mounting groove (3) have been seted up to the opposite side of dyke backup pad (1), the top of dyke backup pad (1) runs through and is provided with a plurality of construction stake nail subassemblies (4) that are linear distribution, the one end of dyke backup pad (1) is provided with first strengthening mechanism (5), the other end of dyke backup pad (1) is provided with second strengthening mechanism (6), first strengthening mechanism (5) with second strengthening mechanism (6) are mirror symmetry and distribute, just first strengthening mechanism (5) with second strengthening mechanism (6) structure is the same.
- 2. The river bank both sides dyke reinforcing construction device according to claim 1, characterized in that, a plurality of stake mounting groove (101) that are linear distribution are seted up on the top of dyke backup pad (1), stake mounting groove (101) both sides and middle part all set up with construction stake subassembly (4) matched with stake through-hole (102), two sets of I-shaped connection draw-in groove (103) have been seted up at the top both ends of dyke backup pad (1), two sets of I-shaped connection draw-in groove (103) are symmetric distribution, just the top both ends of dyke backup pad (1) are located one side of I-shaped connection draw-in groove (103) has all been seted up and has been consolidated locating hole (104).
- 3. A river bank both sides dyke reinforcing construction device according to claim 1, characterized in that, construction stake nail subassembly (4) are including running through center nail pole (401) on dyke backup pad (1) top, first welding flat groove (402) have been seted up at the top of center nail pole (401), the bottom of center nail pole (401) is fixed to be provided with first spiral fixed part (403).
- 4. A river bank two-side embankment reinforcement construction device according to claim 3, characterized in that, construction stake nail subassembly (4) still include auxiliary nail pole (404) that set up in center nail pole (401) both sides, second welding flat groove (405) have been seted up at the top of auxiliary nail pole (404), the bottom of auxiliary nail pole (404) is fixed to be provided with second spiral fixed part (406), second welding flat groove (405) inboard fixedly provided with first welding flat groove (402) fixed connection's transverse connection pole (407).
- 5. The river bank two-side embankment reinforcement construction device according to claim 1, wherein the first reinforcement mechanism (5) comprises an embankment fixing block (501) arranged at one end of the embankment supporting plate (1), an adjusting groove (502) is formed in one side of the top of the embankment fixing block (501), a fastening adjusting component (504) is arranged at the top of the adjusting groove (502), a waterproof guide rail (503) is arranged inside the adjusting groove (502), and a plurality of embankment reinforcement rods (505) penetrate through the embankment fixing block (501) at the top of the waterproof guide rail (503).
- 6. The river bank two-side embankment reinforcement construction device according to claim 5, wherein embankment face compression plates (506) are symmetrically arranged on the other side of the top of the embankment fixing block (501), locking bolts (507) are arranged on two sides of the top of the embankment face compression plates (506) in a penetrating mode, bolt positioning holes (508) matched with the locking bolts (507) are formed in the top of the embankment fixing block (501), and a connecting bottom plate (509) is arranged at the bottom of the embankment fixing block (501).
- 7. A river bank both sides dyke reinforcing construction device according to claim 6, characterized in that the first reinforcing means (5) further comprises two sets of i-shaped stabilizing frames (510) provided at one side of the dyke fixing block (501), and the i-shaped stabilizing frames (510) are inserted into the dyke supporting plate (1), and a locking fixing bolt (511) inserted into the dyke supporting plate (1) is provided at one side of the i-shaped stabilizing frames (510).
- 8. The river bank two-side embankment reinforcement construction device according to claim 7, wherein the fastening adjusting component (504) comprises a construction mounting plate (5041) arranged at the top of the adjusting groove (502), wherein the I-shaped mounting holes are symmetrically formed in one side of the top of the construction mounting plate (5041), rectangular adjusting holes (5042) are symmetrically formed in the other side of the top of the construction mounting plate (5041), and a fixing plate (5043) is arranged at the top of the rectangular adjusting holes (5042).
- 9. The river bank two-side embankment reinforcement construction device according to claim 8, wherein a connecting screw rod (5044) is arranged in the middle of the fixing plate (5043) in a penetrating manner, an adjusting claw (5045) is arranged at the bottom end of the connecting screw rod (5044), a fixing nut (5046) is arranged on the outer side of the top of the connecting screw rod (5044), a gasket (5047) matched with the fixing plate (5043) is arranged at the bottom of the fixing nut (5046), and a ring gear (5048) matched with the rectangular adjusting hole (5042) is fixedly arranged at the bottom of the fixing plate (5043).
- 10. The river bank two-side dike reinforcement construction device according to claim 9, wherein clamping groove insections matched with the ring gear (5048) are arranged on two inner sides of the rectangular adjusting hole (5042); The inner sides of the fixed plate (5043) and the ring gear (5048) are respectively provided with internal threads matched with the connecting screw rod (5044); the cross section of the adjusting claw (5045) is set to be of a W-shaped structure, the cross section of the waterproof guide rail (503) is set to be of a groove-shaped structure, and the W-shaped structure and the groove-shaped structure are mutually clamped.
Description
River bank both sides dyke reinforcing construction device Technical Field The utility model relates to the technical field of reinforcement construction, in particular to a river bank two-side embankment reinforcement construction device. Background In recent years, as the urban process is accelerated, the flood control pressure borne by the river channel is continuously increased, and the river bank embankments in many areas are damaged and aged to different degrees, so that the embankment reinforcement engineering is carried out sequentially each time to ensure the safe operation of the embankment engineering, however, the traditional embankment reinforcement construction mode often has the problems of low construction efficiency, high safety risk and the like. The patent document with the application number 202022626505.2 discloses a river bank both sides dyke reinforcing construction device, which comprises a foundation, foundation inclined side fixedly connected with screen frame, screen frame one side center department fixedly connected with installation piece, the installation groove has been seted up at screen frame opposite side center department and the inside detachable connection of installation groove has the installation piece, circular arc jack has all been seted up at four angles on screen frame top, the inside fixedly connected with reinforcing net of screen frame, the inside side wall fixedly connected with torsional spring of screen frame, circular arc jack is inside to be dismantled and be connected with the spud, the inside groove of seting up of spud, the inside rotation of inside groove is connected with the screw rod and the screw rod top runs through spud top center department, the screw rod is connected with the screw sleeve spiro union, the inside left and right sides of spud bottom all sets up flutedly, it can block the loss of soil to a certain extent for the reinforcement effect to the lifting is better and installation and dismantlement are all comparatively convenient. However, in the specific application process of the device, the device has the defects that firstly, the number of the fixing piles is rare, the structure is simpler, two punctiform fixing devices are arranged at the upper part of the net frame, the systematic deep anchoring design is lacking, when the device is subjected to strong water flow flushing and soil erosion, the punctiform fixing devices are easy to loosen or even fall off in a soft soil layer of a river bank, and can not provide long-term stable supporting force, and secondly, the device is mainly reinforced by virtue of a single net frame structure, lacks a multidirectional supporting mechanism, has insufficient stability when facing complex terrains and strong water flow impact, has poor adaptability in practical application, and is difficult to meet the embankment reinforcing requirements under various complex river channel environments. For the problems in the related art, no effective solution has been proposed at present. Disclosure of utility model Aiming at the problems in the related art, the utility model provides a river bank two-side embankment reinforcement construction device, which aims to overcome the technical problems in the prior art. For this purpose, the utility model adopts the following specific technical scheme: The utility model provides a river bank both sides dyke reinforcing construction device, includes the dyke backup pad that a plurality of groups set up side by side, and one side of dyke backup pad is provided with the reinforcing connection seat, and fixed mounting groove has been seted up to the opposite side of dyke backup pad, and the top of dyke backup pad runs through and is provided with a plurality of construction stake nail subassemblies that are linear distribution, and the one end of dyke backup pad is provided with first strengthening mechanism, and the other end of dyke backup pad is provided with second strengthening mechanism, and first strengthening mechanism is mirror symmetry and distributes with second strengthening mechanism, and first strengthening mechanism is the same with second strengthening mechanism structure. Further, in order to realize the fixed connection with construction stake nail subassembly, first strengthening mechanism and second strengthening mechanism, ensure overall structure's stability, a plurality of stake nail mounting grooves that are linear distribution have been seted up on the top of dyke backup pad, stake nail through-hole with construction stake nail subassembly matched with has all been seted up with the middle part in the both sides of stake nail mounting groove, two sets of I-shaped connection draw-in grooves have been seted up at the top both ends of dyke backup pad, two sets of I-shaped connection draw-in grooves are the symmetric distribution, and the reinforcement locating hole has all been seted up to one side that the top both ends of dyke backup pad are loc