Search

CN-224213334-U - Geotechnical engineering slope reinforcing apparatus

CN224213334UCN 224213334 UCN224213334 UCN 224213334UCN-224213334-U

Abstract

The utility model discloses a geotechnical engineering slope reinforcing device, in particular to the technical field of geotechnical engineering, which comprises a drainage component, a sealing component, an anti-slip component and a fixing component, wherein the sealing component is arranged on the side surface of the drainage component, the anti-slip component is arranged above the drainage component, the fixing component is arranged on the side surface of the anti-slip component, and the fixing component is used by simultaneously fixing an anchor rod and a reinforcing nail of the fixing component, so that not only can loose rock soil on the surface layer of a side slope be fixed, but also the local sliding and weathered stripping can be limited, and the sliding body load can be transferred to a stable rock stratum, thereby realizing multistage slope reinforcement, and through the cooperation of the drainage component and the sealing component, when accumulated water in a drainage groove plate overflows, workers can be connected with a drainage valve through a water pump to drain the accumulated water in the drainage groove plate in a manual way, thereby preventing a construction area from being flooded.

Inventors

  • ZHANG TIANQING
  • FENG FAN
  • ZUO KAIXUAN

Assignees

  • 中地志诚建设科技有限公司

Dates

Publication Date
20260508
Application Date
20250603

Claims (8)

  1. 1. The geotechnical engineering slope reinforcing device comprises a drainage component (1), a sealing component (2), an anti-slip component (3) and a fixing component (4), and is characterized in that the drainage component (1) is arranged at a slope water collecting position of a slope, the sealing component (2) is mounted on two sides of the drainage component (1) through bolts, the fixing component (4) is arranged at a slope of the slope, and the anti-slip component (3) is fixedly connected to the upper portion of the fixing component (4).
  2. 2. The geotechnical engineering slope reinforcement device according to claim 1, wherein the drainage assembly (1) comprises a drainage groove plate (5), a connecting block (6) and drainage holes (7), the connecting block (6) is arranged above the drainage groove plate (5), and the drainage holes (7) are cut in the side wall of the drainage groove plate (5).
  3. 3. The geotechnical engineering slope reinforcement device according to claim 1, wherein the sealing assembly (2) comprises a sealing rubber ring (8), a connecting pipe (9) and a drain valve (10), the connecting pipe (9) is arranged on the side face of the sealing rubber ring (8), and the drain valve (10) is arranged on the side, away from the sealing rubber ring (8), of the connecting pipe (9).
  4. 4. The geotechnical engineering slope reinforcement device according to claim 1, wherein the anti-slip assembly (3) comprises an anti-slip column (11), a reinforcing mesh assembly (12) and a re-spraying concrete layer (13), the reinforcing mesh assembly (12) is installed on the inner wall of the re-spraying concrete layer (13), and the anti-slip column (11) is fixedly installed on the side face of the reinforcing mesh assembly (12).
  5. 5. The geotechnical engineering slope reinforcement device according to claim 4, wherein the reinforcing mesh assembly (12) comprises horizontal ribs (14), vertical ribs (15) and binding wires (16), the inner diameter surface of the binding wires (16) is provided with the horizontal ribs (14), and the side surfaces of the horizontal ribs (14) are provided with the vertical ribs (15).
  6. 6. The geotechnical engineering slope reinforcement device according to claim 1, wherein the fixing component (4) comprises a reinforcement nail (17), an anchor rod (18) and a primary spraying concrete layer (19), the reinforcement nail (17) is installed on the inner wall surface of the primary spraying concrete layer (19), and the anchor rod (18) is connected below the reinforcement nail (17).
  7. 7. The geotechnical engineering slope reinforcement device according to claim 6, wherein the reinforcement nail (17) comprises a connecting rod (20), a fixing rod (21) and a cone (22), the fixing rod (21) is installed on the side face of the connecting rod (20), and the cone (22) is installed on the side, far away from the connecting rod (20), of the fixing rod (21).
  8. 8. The geotechnical engineering slope reinforcement device according to claim 6, wherein the anchor rod (18) comprises a connecting sleeve (23), a rod body (24) and a fixing plate (25), the rod body (24) is installed on the side surface of the fixing plate (25), and the connecting sleeve (23) is installed on the side, far away from the fixing plate (25), of the rod body (24).

Description

Geotechnical engineering slope reinforcing apparatus Technical Field The utility model relates to the technical field of geotechnical engineering, in particular to a geotechnical engineering slope reinforcing device. Background Along with the rapid development of foundation construction in China, a large number of projects such as roads, railways, buildings and the like relate to slope projects, and due to the complexity of a rock-soil body and the influence of natural factors and human factors, the slopes are easy to generate instability phenomena such as deformation, sliding and the like, so that the safety and normal use of the projects are threatened, and even serious harm is caused to surrounding environment, personnel, life and property, in order to ensure the stability of the slopes, the deformation resistance and the sliding resistance of the slope are improved, the rock-soil project slope reinforcing device is generated, and the existing single reinforcing nails or single anchor rods cannot simultaneously perform multi-level reinforcing on the inside and the surface layer of the rock slope, so that the reinforcing device has certain limitation; According to the prior art, the prior publication No. CN222834931U discloses a geotechnical engineering slope reinforcing device which is implemented on a slope body, a top concrete block is arranged at the top of the slope body, a bottom concrete block is arranged at the bottom of the slope body, splicing protection plates are arranged on the slope surface of the slope body, splicing convex bodies are arranged on the upper side part and the left side part of the splicing protection plates, splicing grooves which are correspondingly spliced with the splicing convex bodies are formed in the right side part and the lower side part of the splicing protection plates, fixing nails I are installed between the splicing protection plates to achieve up-down connection, square grooves are formed in the two sides of the top surface on the splicing protection plates, inclined pressure plate rods are installed in the square grooves, the end parts of the inclined pressure plate rods are fixedly arranged with the top concrete block and the bottom concrete block respectively, joint fixing nails are arranged between the adjacent inclined pressure plate rods, circular holes are formed in the middle of the splicing protection plates, cement carpets and vegetation soil layers are arranged on the circular holes, the reinforcing effect is stable, and loose conditions cannot occur under the stress effect of the influence of external force and the inclination of the whole slope surface of the slope body for a long time. The inventors found that the following problems exist in the prior art in the process of implementing the present utility model: When the existing single reinforcement nail is used for reinforcing the geotechnical engineering slope, only loose rocks on the surface of the geotechnical slope can be fixed, the load of a sliding body cannot be transmitted to a stable rock stratum, the functions of the single anchor rod reinforcement device are just opposite, and the traditional waterproof measures of the geotechnical engineering slope reinforcement device are that a waterproof foundation pit with a certain depth is dug at the bottom of the landslide, when heavy rain comes, accumulated water on the side slope can slide into the foundation pit along the side slope and then infiltrate into the ground from the foundation pit, but when accumulated water in the foundation pit cannot infiltrate into the ground in a certain time, more rainwater in the foundation pit can accumulate, so that the rainwater overflows from the waterproof foundation pit, and a local area in a construction area is flooded; therefore, an geotechnical engineering slope reinforcing device is provided for the problems. Disclosure of utility model In order to overcome the defects in the prior art, the utility model provides a geotechnical engineering slope reinforcing device to solve the problems in the background art. In order to achieve the purpose, the geotechnical engineering slope reinforcing device comprises a drainage component, a sealing component, an anti-slip component and a fixing component, wherein the drainage component is arranged at a slope water collecting position of a slope, the sealing component is arranged on two sides of the drainage component through bolts, the fixing component is arranged at a slope surface of the slope, and the anti-slip component is fixedly connected above the fixing component. Preferably, the drainage assembly comprises a drainage groove plate, a connecting block and a drainage hole, wherein the connecting block is arranged above the drainage groove plate, and the drainage hole is cut in the side wall of the drainage groove plate. Preferably, the sealing assembly comprises a sealing rubber ring, a connecting pipe and a drain valve, the side face of the sealing rub