Search

CN-224213415-U - Desilting device for construction engineering construction

CN224213415UCN 224213415 UCN224213415 UCN 224213415UCN-224213415-U

Abstract

The utility model relates to the technical field of engineering construction, in particular to a dredging device for construction engineering construction, which comprises a fixing frame, wherein one side of the fixing frame is fixedly connected with a motor, the output end of the motor is fixedly connected with a rotating rod, the outer surface of the rotating rod is fixedly connected with a wire coil, the inside of the wire coil is provided with a connecting wire, and the left side and the right side of the bottom of the fixing frame are fixedly connected with connecting plates. The utility model has the advantages that the two ends of the pedal can be connected by the two fixing frames which are driven by the motor to rotate the wire coil, when the left wire coil is paid out, the right wire coil is wound, the pedal moves rightwards, and otherwise, moves leftwards, so that the position of the pedal on the silt is conveniently adjusted, the pedal is conveniently placed and recovered, the purpose of convenient use is achieved, the telescopic length of the adjusting rod in the fixing barrel can be limited by the fixing screw, the height of the adjusting rod can be adjusted according to the surface height of the silt, the connecting wire is maximally close to the horizontal, and the connecting wire is prevented from contacting the ground.

Inventors

  • YAN CHUNHONG

Assignees

  • 陕西恒业建设集团有限公司

Dates

Publication Date
20260508
Application Date
20250606

Claims (6)

  1. 1. The dredging device for construction engineering construction is characterized by comprising a fixing frame (1), wherein one side of the fixing frame (1) is fixedly connected with a motor (2), the output end of the motor (2) is fixedly connected with a rotating rod (3), the outer surface of the rotating rod (3) is fixedly connected with a wire coil (4), the inside of the wire coil (4) is provided with a connecting wire (5), the left side and the right side of the bottom of the fixing frame (1) are fixedly connected with connecting plates (6), and anchor rods (7) are inserted into the connecting plates (6); The one end fixedly connected with splint (8) of connecting wire (5), the inside joint of splint (8) has cardboard (9), peg graft in the inside of splint (8) and cardboard (9) has bolt (10), one side fixedly connected with of cardboard (9) adjusts pole (11), threaded hole (12) are seted up to the inside of adjusting pole (11), fixed section of thick bamboo (13) have been cup jointed to the bottom of adjusting pole (11), one side threaded connection of fixed section of thick bamboo (13) has fixed screw (14), the bottom fixedly connected with footboard (15) of fixed section of thick bamboo (13), fillet (16) have all been seted up to the left and right sides of footboard (15).
  2. 2. The dredging device for construction engineering construction according to claim 1, wherein the number of the fixing frames (1) is two, the two fixing frames (1) are respectively positioned at the left side and the right side of the pedal (15), and the two fixing frames (1) are fixedly connected with the pedal (15) through connecting wires (5).
  3. 3. The dredging device for construction engineering construction according to claim 1, wherein the number of the wire reels (4) is two, the two wire reels (4) are symmetrically arranged on the outer surface of the rotating rod (3), the connecting wires (5) are made of steel wires, the number of the connecting plates (6) is four, and the four connecting plates (6) are symmetrically welded on the left side and the right side of the bottom of the fixing frame (1).
  4. 4. The dredging device for construction engineering construction according to claim 1, wherein the inside dimension of the clamping plate (8) is matched with the thickness of the clamping plate (9), and round holes matched with the bolts (10) are formed in the clamping plate (8) and the clamping plate (9).
  5. 5. The dredging device for construction engineering construction according to claim 1, wherein the adjusting rods (11) are rectangular rods, the number of the threaded holes (12) is a plurality, the adjusting rods (11) are linearly arrayed at the center of the adjusting rods (11), and the size of the threaded holes (12) is matched with the size of the fixing screws (14).
  6. 6. The dredging device for construction engineering construction according to claim 1, wherein the number of the fixing cylinders (13) is four, the four fixing cylinders (13) are welded at four corners of the top of the pedal (15) respectively, a stainless steel layer is arranged on the top surface of the pedal (15), and a wooden layer is arranged at the bottom of the pedal (15).

Description

Desilting device for construction engineering construction Technical Field The utility model relates to the technical field of engineering construction, in particular to a dredging device for construction engineering construction. Background The sludge is soft soil with natural water content greater than the fluidity limit and porosity ratio greater than 1.5, and is an modern sediment formed under the action of microorganisms in the slow water flow environment such as bay, lake marsh or river bay. The foundation is easy to cause the subsidence of the building if silt exists in the foundation, so that desilting is needed before engineering construction is carried out in a relatively wet place. The construction engineering process often encounters silt, and the mode of silt dilution can be adopted for river silt generally, but when the river is wider, the worker just needs to stand and to the centre to flush with water, usually places a plank on the river, and the worker stands on the plank to flush with water, and although this kind of mode can carry out silt clearance, but the placing and the recovery of plank are all very difficult to the plank is inconvenient for remove the position on the silt. Disclosure of Invention The object of the present utility model is to solve at least one of the technical drawbacks. The utility model aims to overcome the defects of the prior art, solve the problems in the background art and provide a dredging device for construction engineering construction. The desilting device for construction engineering construction comprises a fixing frame, wherein one side of the fixing frame is fixedly connected with a motor, the output end of the motor is fixedly connected with a rotating rod, the outer surface of the rotating rod is fixedly connected with a wire coil, a connecting wire is arranged in the wire coil, connecting plates are fixedly connected to the left side and the right side of the bottom of the fixing frame, and anchor rods are inserted into the connecting plates; The one end fixedly connected with splint of connecting wire, the inside joint of splint has the cardboard, the inside grafting of splint and cardboard has the bolt, one side fixedly connected with of cardboard adjusts the pole, threaded hole has been seted up to the inside of adjusting the pole, fixed section of thick bamboo has been cup jointed to the bottom of adjusting the pole, one side threaded connection of fixed section of thick bamboo has the fixed screw, the bottom fixedly connected with footboard of fixed section of thick bamboo, the fillet has all been seted up to the left and right sides of footboard. Preferably, the number of the fixing frames is two, the two fixing frames are respectively positioned at the left side and the right side of the pedal, and the two fixing frames are fixedly connected with the pedal through connecting wires. Through adopting above-mentioned technical scheme, two fixed frames that drive drum pivoted by the motor can be connected the both ends of footboard, and right side line dish receipts line when left side line dish unwrapping wire, then the footboard moves right, and vice versa the footboard then moves left, conveniently adjusts the position of footboard on silt. Preferably, the number of the wire coils is two, the two wire coils are symmetrically arranged on the outer surface of the rotating rod, the connecting wires are made of steel wires, the number of the connecting plates is four, and the four connecting plates are symmetrically welded on the left side and the right side of the bottom of the fixing frame. Through adopting above-mentioned technical scheme, mount accessible connecting plate and stock stable installation in ground. Preferably, the internal dimension of splint and the thickness looks adaptation of cardboard, the round hole with bolt looks adaptation has all been seted up to splint and cardboard's inside. Through adopting above-mentioned technical scheme, splint and cardboard can the quick joint, only can link to each other two fast through the bolt. Preferably, the adjusting rod is a rectangular rod, the number of the threaded holes is a plurality of, the adjusting rods are linearly arrayed at the center of the adjusting rod, and the size of the threaded holes is matched with the size of the fixing screws. By adopting the technical scheme, the adjusting rod can adjust the telescopic length of the adjusting rod in the fixed cylinder through the fixed screw. Preferably, the number of the fixing cylinders is four, the four fixing cylinders are welded at four corners of the top of the pedal respectively, the top surface of the pedal is provided with a stainless steel layer, and the bottom of the pedal is a wooden layer. Through adopting above-mentioned technical scheme, the top surface of stainless steel layer material is more abrasionproof, can increase the life of footboard, and ligneous footboard can light float in silt surface. Compared with the