CN-224213471-U - Temporary drainage pipeline for building engineering
Abstract
The utility model provides a temporary drainage pipeline for constructional engineering, which relates to the technical field of constructional engineering and comprises a pipeline main body, wherein the front end of the pipeline main body is connected with a quick splicing assembly, the quick splicing assembly comprises an inner pipe, the front side surface of the inner pipe is connected with a sealing ring, the surfaces of the pipeline main body, which are close to the inner pipe, are connected with positioning blocks, the surfaces of the upper end and the lower end of the rear side of the pipeline main body are connected with positioning clamping grooves, the surfaces of the two sides, which are close to the positioning clamping grooves, of the pipeline main body are provided with slotted holes, and the interiors of the slotted holes are connected with two groups of springs. According to the utility model, when the pipeline main bodies are connected, the positioning blocks of one group of pipeline main bodies can be aligned with the positioning clamping grooves of the other group of pipeline main bodies and pushed, the quick connection can be realized by automatically pushing the clamping blocks through the springs, the sealing ring can also play a sealing role, the leakage of a water source is avoided, and the convenience in the assembly of the pipeline main bodies is improved.
Inventors
- QIN MING
- SONG YUANYUAN
Assignees
- 泰安市城市管理综合服务中心
Dates
- Publication Date
- 20260508
- Application Date
- 20250731
Claims (7)
- 1. The temporary drainage pipeline for the building engineering comprises a pipeline main body (1) and is characterized in that the front end of the pipeline main body (1) is connected with a rapid splicing assembly (2); Quick concatenation subassembly (2) are including inner tube (201), the front side surface of inner tube (201) is connected with sealing washer (203), pipeline main part (1) is close to the upper and lower end surface of inner tube (201) and all is connected with locating piece (202), the surface of the lower extreme all is connected with positioning slot (204) on the rear side of pipeline main part (1), slotted hole (210) have all been seted up on the both sides surface that pipeline main part (1) is close to positioning slot (204), the internal connection of slotted hole (210) has two sets of springs (205), two sets of the inside of spring (205) has all pegged graft push rod (206), the front end of push rod (206) is connected with push pedal (207), the front end of push pedal (207) is connected with fixture block (208), the rear end fixedly connected with handle (209).
- 2. The temporary drainage pipeline for constructional engineering as defined in claim 1, wherein grooves are formed in surfaces of the inner pipe (201) matched with the two groups of clamping blocks (208), and inclined openings are formed in surfaces of the clamping blocks (208).
- 3. The temporary drainage pipeline for construction engineering according to claim 2, wherein the clamping block (208) and the clamping groove form a clamping connection, and the push plate (207) and the spring (205) form an elastic structure.
- 4. A temporary drainage pipe for construction according to claim 3, wherein the outer surface of said push plate (207) is fitted to the inner wall of said slot (210).
- 5. The temporary drainage pipeline for constructional engineering as defined in claim 4, wherein the bottom of the pipeline main body (1) is connected with an adjusting component (3), the adjusting component (3) comprises a supporting frame (301), and threaded holes (302) are respectively connected to four corners of the bottom of the supporting frame (301).
- 6. The temporary drainage pipeline for constructional engineering as defined in claim 5, wherein a threaded rod (303) is connected to the inside of the threaded hole (302), and a supporting foot (304) is fixedly connected to the bottom of the threaded rod (303).
- 7. The temporary drainage pipeline for construction engineering according to claim 6, wherein a wrench (305) is connected to one side surface of the supporting leg (304).
Description
Temporary drainage pipeline for building engineering Technical Field The utility model relates to the technical field of constructional engineering, in particular to a temporary drainage pipeline for constructional engineering. Background The temporary drainage pipeline is mainly used for emergency drainage of building construction sites, temporary buildings (such as exhibition halls and office areas) and rainy seasons, and needs to adapt to complex terrains (such as sloping fields and grooves), short-term use requirements and quick deployment requirements. The temporary drainage pipeline is initially used for solving the problem of local ponding of a construction site, and along with the expansion of the scale of a building, the application scene of the temporary drainage pipeline is extended to directional drainage of areas such as foundation pits, basement ramps, soft soil foundations and the like, and a temporary drainage channel is quickly constructed when an underground pipe network is blocked or sudden heavy rain occurs. However, the existing bolting and fixing mode needs to align pipe orifices, install gaskets and screw nuts in sequence, so that the installation efficiency is low, and the emergency drainage requirement during sudden heavy rain or blockage of an underground pipe network is difficult to meet. Disclosure of utility model The utility model aims to solve the problems that the prior bolt connection fixing mode needs to sequentially align pipe orifices, install gaskets and screw nuts, has lower installation efficiency and is difficult to meet the emergency drainage requirement when sudden heavy rain or underground pipe network is blocked. In order to achieve the purpose, the temporary drainage pipeline for the building engineering comprises a pipeline main body, wherein the front end of the pipeline main body is connected with a rapid splicing assembly, the rapid splicing assembly comprises an inner pipe, the front side surface of the inner pipe is connected with a sealing ring, the surfaces, close to the inner pipe, of the pipeline main body are connected with positioning blocks, the surfaces, close to the upper end and the lower end, of the rear side of the pipeline main body are connected with positioning clamping grooves, the surfaces, close to the positioning clamping grooves, of the two sides of the pipeline main body are provided with slotted holes, two groups of springs are connected inside the slotted holes, push rods are inserted inside the two groups of springs, the front end of each push rod is connected with a push plate, the front end of each push plate is connected with a clamping block, and the rear end of each push rod is fixedly connected with a handle. Further, grooves are formed in the surfaces, matched with the two groups of clamping blocks, of the inner tube, and inclined openings are formed in the surfaces of the clamping blocks. Further, the clamping block is connected with the clamping groove in a clamping way, and the pushing plate and the spring form an elastic structure. Further, the clamping block is connected with the clamping groove in a clamping way, and the pushing plate and the spring form an elastic structure. Further, the outer surface of the push plate is attached to the inner wall of the slot hole. Further, the bottom of pipeline main part is connected with adjusting part, adjusting part includes the support frame, the bottom four corners department of support frame all is connected with the screw hole. Further, the inside of screw hole is connected with the threaded rod, the bottom fixedly connected with supporting legs of threaded rod. Further, a spanner is connected to one side surface of the supporting leg. Compared with the prior art, the utility model has the advantages and positive effects that, 1. According to the utility model, when the pipeline main bodies are connected, the positioning blocks of one group of pipeline main bodies can be aligned with the positioning clamping grooves of the other group of pipeline main bodies and pushed, the quick connection can be realized by automatically pushing the clamping blocks through the springs, the sealing ring can also play a sealing role, the leakage of a water source is avoided, and the convenience in the assembly of the pipeline main bodies is improved. 2. According to the utility model, when the pipeline main body is connected to an area with uneven ground, the spanner at the corresponding position can be rotated, the threaded rod is driven to rotate in a threaded connection mode, the purpose of adjusting the height of the supporting leg is achieved through threaded rotation, and the stability in use is improved. Drawings FIG. 1 is a schematic perspective view of a temporary drainage pipeline for construction engineering according to the present utility model; FIG. 2 is a schematic diagram of an explosion structure of a temporary drainage pipeline for construction engineering according to the pr