Search

CN-224213904-U - Floor guardrail

CN224213904UCN 224213904 UCN224213904 UCN 224213904UCN-224213904-U

Abstract

The utility model discloses a floor guardrail, and relates to the technical field of industrial protection facilities. The flexible outer tube is fixed with the flexible outer tube through the fixing screw, and caps are fixed at two ends of the flexible outer tube. The utility model has the advantages of convenient installation, strong impact resistance, long service life and the like, and is suitable for dividing and protecting industrial storage areas.

Inventors

  • LIN XIANCHUN

Assignees

  • 柏恩博智能设备(福建)有限公司

Dates

Publication Date
20260508
Application Date
20250521

Claims (4)

  1. 1. The utility model provides a guardrail falls to ground, its characterized in that, including block (1), flexible outer tube (2), fixed screw (3), metal base (4) and chemical bolt (5), chemical bolt (5) lower part and planting the muscle and glue anchor, chemical bolt (5) upper portion is fixed with metal base (4), and the bracing piece upper end of metal base (4) is fixed with flexible outer tube (2) through fixed screw (3), and flexible outer tube (2) both ends are fixed with block (1).
  2. 2. The floor guardrail according to claim 1, characterized in that the flexible outer tube (2) is a modified HDPE outer tube with a wall thickness of not less than 3mm.
  3. 3. The floor guardrail of claim 1, wherein the support rod is an elastic support rod.
  4. 4. A floor rail according to claim 1, characterized in that the flexible outer tube (2) is provided with a plurality of.

Description

Floor guardrail Technical Field The utility model relates to the technical field of industrial protection facilities, in particular to a floor guardrail. Background The traditional floor guardrails are mostly of rigid structures (such as metal railings or concrete columns) and have the following defects: 1. The buffer capacity is poor, and the buffer is easy to deform or incline when impacted, and needs frequent maintenance; 2. the installation is complicated, a foundation is required to be embedded or welded, and the flexibility is low; 3. The application range is narrow, and the device is only suitable for static protection and cannot adapt to small-sized vehicles or tool collision scenes. In summary, the utility model designs the floor guardrail with the combination of the flexible outer tube and the elastic supporting rod. Disclosure of utility model Aiming at the defects in the prior art, the utility model aims to provide the floor guardrail which has the advantages of convenience in installation, strong impact resistance, long service life and the like and is suitable for dividing and protecting industrial storage areas. In order to achieve the purpose, the floor guardrail is achieved through the following technical scheme that the floor guardrail comprises a cover cap, a flexible outer tube, fixing screws, a metal base and chemical bolts, wherein the lower parts of the chemical bolts are anchored with the bar planting glue, the upper parts of the chemical bolts are fixed with the metal base, the upper ends of supporting rods of the metal base are fixed with the flexible outer tube through the fixing screws, and the cover caps are fixed at the two ends of the flexible outer tube. Preferably, the flexible outer tube is a modified HDPE outer tube, and the wall thickness is more than or equal to 3mm. Preferably, the support rod is an elastic support rod. The utility model has the beneficial effects of simple structure and convenient installation, and realizes controllable deflection and energy absorption when in collision through the cooperation of the elastic support rod and the modified HDPE outer pipe. The method has the advantages of convenience in installation, strong impact resistance, long service life and the like, and is suitable for dividing and protecting industrial storage areas. Drawings The utility model is described in detail below with reference to the drawings and the detailed description; FIG. 1 is a schematic diagram of the structure of the present utility model; FIG. 2 is an exploded view of FIG. 1; FIG. 3 is a schematic view of another embodiment of the present utility model. Detailed Description The utility model is further described in connection with the following detailed description, in order to make the technical means, the creation characteristics, the achievement of the purpose and the effect of the utility model easy to understand. Referring to fig. 1-3, the specific embodiment adopts the following technical scheme that the floor guardrail comprises a cap 1, a flexible outer tube 2, a fixing screw 3, a metal base 4 and a chemical bolt 5, wherein the lower part of the chemical bolt 5 is anchored with a bar planting adhesive, the upper part of the chemical bolt 5 is fixed with the metal base 4, the upper end of a supporting rod of the metal base 4 is fixed with the flexible outer tube 2 through the fixing screw 3, and the caps 1 are fixed at two ends of the flexible outer tube 2. It is noted that the flexible outer tube 2 is a modified HDPE outer tube, and the wall thickness is more than or equal to 3mm. It is noted that the support rod is an elastic support rod. Furthermore, the flexible outer tube 2 is provided with a plurality of. The mounting steps of the concrete implementation mode are that the diameter of a drilled hole is 18-22, the depth is 100-125mm, dust in the hole is cleaned, three-fourths volume of bar planting glue is required to be poured into each mounting hole, the bolt is inserted in a rotating mode to enable the bar planting glue and the bolt to be anchored better, overflowed bar planting glue is required to be cleaned in time, the situation that subsequent solidification cannot be processed is avoided, the gel-curing time of the bar planting glue is 12 hours, a base is inserted into the bolt before the bar planting glue is not solidified, shrinkage phenomenon occurs when the bar planting glue is solidified, the base is utilized to prevent the offset from being too large, a bolt gasket and a nut are sequentially put down and screwed down after the bar planting glue is solidified, then a flexible outer tube is inserted into a support rod, fixing screws are screwed, and two sides are covered with caps. This concrete implementation mode simple structure, simple to operate, the swing through flexible outer tube when suffering the striking comes buffering impact force, is used for workshop warehouse inside generally, to some regions that do not need the frequent