CN-224214416-U - Air inflation device for air film building assembly
Abstract
The utility model relates to the technical field of air charging devices, and discloses an air charging device for air film building assembly, which is characterized in that a centrifugal fan, a venturi tube, a vertical tube and other structures are arranged to accelerate the flow speed of air and introduce additional air, an air inlet of the air film building is connected with a diffusion section in a sealing way through devices such as a connecting tube and the like, then the centrifugal fan and a frequency converter are started, an air inlet pipe is used for sucking external air into an air outlet pipe through an air inlet pipe, the air outlet pipe transmits wind power to the venturi tube, and then the air outlet pipe is compressed by a storage section to enable the air to flow rapidly when reaching the throat tube section, and meanwhile, the air introduced into the vertical tube is introduced into the air outlet pipe, so that the air quantity and the air speed of the air blown into the air film building are increased, and the effect of quickly blowing more air is achieved.
Inventors
- ZHAO MENG
- HOU ZE
- SU LEI
- WANG HAILUN
- LI YIMING
- Jing Lujing
- ZHANG HUIJIE
- LIU RUILI
Assignees
- 河南汉杰伊膜结构工程有限公司
Dates
- Publication Date
- 20260508
- Application Date
- 20250519
Claims (4)
- 1. The utility model provides an air inflation device for air film building equipment, includes box (1), its characterized in that, the inside symmetry fixed mounting of box (1) has protection frame (2), every the inside fixed mounting of protection frame (2) has centrifugal fan (3), centrifugal fan (3) are two, and one is main fan, and two are reserve fan, the one side of box (1) is located protection frame (2) one side and is linear array evenly offered louvre (11), rectangular channel has been seted up at the top of box (1), rectangular channel internally movable installs energy storage power supply (4), the bottom of energy storage power supply (4) is located the top of protection frame (2), the both sides inside of box (1) are located the oblique top fixed mounting of protection frame (2) have converter (5), electric connection each other between converter (5) and centrifugal fan (3), the output of centrifugal fan (3) is fixed connection has venturi (6).
- 2. The air charging device for air film building assembly of claim 1, wherein the centrifugal fan (3) comprises a fan body (31), an air inlet pipe (32) is arranged on one side of the fan body (31), the air inlet pipe (32) is communicated with the outside of the box body (1), an air outlet pipe (33) is arranged at the top of the centrifugal fan (3), and the two fans are connected with each other through the air outlet pipe (33).
- 3. The air inflation device for air film building assembly of claim 2, wherein the two sides of the bottom of the energy storage power supply (4) are symmetrically provided with supporting legs (41), the bottoms of the supporting legs (41) are positioned above the protection frame (2), and handles (42) are symmetrically and fixedly arranged at the top of the energy storage power supply (4).
- 4. The air charging device for air film building assembly according to claim 3, wherein the venturi tube (6) is communicated with the air outlet tube (33), the venturi tube (6) comprises a storage section (61), a throat section (62), a diffusion section (63) and a vertical tube (64), the storage section (61) is connected with the air outlet tube (33), the diffusion section (63) is arranged at the side wall of the box body (1), the throat section (62) is arranged between the storage section (61) and the diffusion section (63), the storage section (61), the throat section (62) and the diffusion section (63) are communicated, the top of the throat section (62) is provided with the vertical tube (64), and the end part of the vertical tube (64) extends out of the box body (1).
Description
Air inflation device for air film building assembly Technical Field The utility model relates to the technical field of inflation devices, in particular to an inflation device for air film building assembly. Background The air film building is a building structure system which uses special building film materials as a shell, is provided with an intelligent electromechanical device to provide positive pressure of air in the air film building, supports a building main body, and when the air film building is supported, air inflation and pressurization equipment is needed to blast the building, so that the air film is expanded, and other external forces such as wind force can be resisted by properly adjusting the air pressure in the air film. In the prior art, the air film building combined air charging device with the publication number of CN216894998U comprises a box body and a bracket arranged on the lower surface of the box body, wherein two groups of protection frames are arranged on the inner wall of the bottom of the box body, a main fan fixed on the inner wall of the box body is arranged in the front protection frame, and a standby fan fixed on the inner wall of the box body is arranged in the rear protection frame. This air film building combination aerating device, through the main fan that sets up, realized the function of device, can be with in the outside air suction air film building, improved the practicality of device, through the reserve fan of setting, realized the protection effect of device, after main fan trouble, can replace the work of main fan by reserve fan, can maintain the pressure of air film building, can avoid the condition emergence that air film building collapses, further improved the practicality of device. In the device, the air outlet pipe between the air outlet pipe of the fan body and the box body is not provided with a guide pipe and other devices, the bottom of the box body is provided with an air return grid, in the actual use process, air blown out by the fan is firstly accumulated in the box body and cannot be directly introduced into the air film building, and accumulated air can be possibly discharged from the air return grid, so that the air film building cannot be pressurized. Disclosure of utility model Aiming at the defects of the prior art, the utility model provides an air charging device for air film building assembly, which has the advantages of fluid acceleration and compact structure adaptation, and solves the problems of the prior art. The utility model provides the technical scheme that the air inflation device for air film building assembly comprises a box body, wherein a protection frame is symmetrically and fixedly arranged in the box body, a centrifugal fan is fixedly arranged in each protection frame, one of the two centrifugal fans is a main fan, the other one of the two centrifugal fans is a standby fan, one side of the box body, which is positioned on one side of the protection frame, is provided with heat dissipation holes in a linear array, the top of the box body is provided with a rectangular groove, an energy storage power supply is movably arranged in the rectangular groove, the bottom of the energy storage power supply is positioned above the protection frame, frequency converters are fixedly arranged above the inclined sides of the protection frame in the box body, the frequency converters are electrically connected with the centrifugal fan, and the output end of the centrifugal fan is fixedly connected with a venturi tube. Through above-mentioned structure setting, can play through setting up the cooperation between centrifugal fan and the venturi and accelerate the circulation of air and introduce more air through the riser, realize to the inside drum of air film building more air, through setting up two centrifugal fans, one of them is as main fan, and another is as reserve fan. Preferably, the centrifugal fan comprises a fan body, an air inlet pipe is arranged on one side of the fan body and communicated with the outside of the box body, an air outlet pipe is arranged at the top of the centrifugal fan, and the two fans are connected with each other between the air outlet pipes. Through the structure setting, centrifugal fan is whole by fixed mounting in the inside of protecting frame, and protecting frame can play the guard action to centrifugal fan, and the position is more convenient by fixed when making centrifugal fan install simultaneously. Preferably, the bottom bilateral symmetry of energy storage power supply is equipped with the landing leg, the landing leg bottom is located the top of protection frame, the top symmetry fixed mounting of energy storage power supply has the handle. Through the structure, when the energy storage power supply works to generate heat, the heat can be rapidly dissipated, the heat can be discharged out of the box body through the heat dissipation holes, the heat dissipation effect is achieved, and th