CN-224214856-U - Support frame for pipeline installation convenient to assemble
Abstract
The utility model discloses a support frame for pipeline installation, which comprises a base, wherein the upper surface of the base is fixedly connected with a lifting bin, the interior of the upper surface of the lifting bin is rotationally connected with a first threaded rod, the outer surface of the first threaded rod is fixedly connected with gears, two gears are arranged, the gears are in transmission connection with another gear through a chain, the gears are positioned above the lifting bin, the upper surface of the lifting bin is fixedly connected with a fixing plate, and the side surface, close to the first threaded rod, of the fixing plate is provided with a connecting plate. Through above-mentioned structure, through setting up fixture, first threaded rod and bayonet lock isotructure, fixed plate and connecting plate can dismantle the second motor, take out first threaded rod after taking out the second motor, after the lifter position removes, can be fixed the lifter position, play fixed effect, two grip blocks can laminate with the pipeline surface, keep pipeline position stable not rock, play the effect of centre gripping.
Inventors
- CHEN QINHONG
- WU GAO
- Kuai Dandan
Assignees
- 安徽万安环境科技股份有限公司
Dates
- Publication Date
- 20260508
- Application Date
- 20250613
Claims (8)
- 1. The utility model provides a support frame for pipeline installation convenient to assemble, its characterized in that, including base (1), the upper surface fixedly connected with lift storehouse (2) of base (1), the inside rotation of upper surface of lift storehouse (2) is connected with first threaded rod (3), the surface threaded connection of first threaded rod (3) has lifting block (4), the inside surface sliding connection of lifting block (4) and lift storehouse (2), the left side fixed surface of lifting block (4) is connected with support frame body (5), the higher authority of support frame body (5) is provided with fixture (6), the surface fixedly connected with gear (10) of first threaded rod (3), gear (10) are provided with two, chain (11) have been cup jointed to the surface of gear (10), gear (10) are connected with another gear (10) transmission through chain (11), gear (10) are located the top of lift storehouse (2), the upper surface fixedly connected with fixed plate (8) of lifting block (2), the surface fixedly connected with connecting plate (8) near first threaded rod (3) are provided with connecting plate (9).
- 2. The support frame for pipeline installation convenient to assemble according to claim 1, wherein the fixing plate (8) is in threaded connection with the inner surface of the connecting plate (9) and is provided with a third threaded rod (15), the left side surface of the third threaded rod (15) is fixedly connected with a second motor (7), the output end of the second motor (7) is fixedly connected with a lug, and the upper surface of the first threaded rod (3) is provided with a clamping groove.
- 3. The support frame for pipeline installation with convenient assembly according to claim 2, wherein the protruding blocks are movably attached to the clamping grooves, the lower surface of the output end of the second motor (7) is movably attached to the upper surface of the first threaded rod (3), and the lifting bins (2) are arranged in a plurality of positions and distributed at four corners of the base (1).
- 4. A support frame for installing a pipeline with convenient assembly according to claim 3, characterized in that, the upper surface of base (1) has seted up groove hole (12), first threaded rod (3) rotate with the internal surface of groove hole (12) and are connected, recess (13) are seted up to the inside of lift storehouse (2), the inside of recess (13) is provided with bayonet lock (14).
- 5. The support frame for installing the pipeline, which is convenient to assemble, according to claim 1, is characterized in that the clamping mechanism (6) comprises a sliding bin (601), a second threaded rod (602), a first motor (603), a bracket (604), a sliding block (605) and a clamping block (606), and the sliding bin (601) is fixedly connected to the upper surface of the support frame body (5).
- 6. The support frame for installing the pipeline, which is convenient to assemble, according to claim 5, is characterized in that the second threaded rod (602) is in threaded connection with the inside of the sliding bin (601), and the support frame (604) is fixedly connected with the right side surface of the support frame body (5).
- 7. The support frame for installing the pipeline with convenient assembly according to claim 6, wherein the first motor (603) is fixedly connected to the upper surface of the support frame (604), and the output end of the first motor (603) is fixedly connected with one end, close to the first motor (603), of the second threaded rod (602).
- 8. The support frame for installing a pipeline with convenient assembly according to claim 7, wherein the sliding block (605) is in threaded connection with the upper surface of the second threaded rod (602), the sliding block (605) is in sliding connection with the inner surface of the sliding bin (601), and the clamping block (606) is fixedly connected with the upper surface of the sliding block (605).
Description
Support frame for pipeline installation convenient to assemble Technical Field The utility model relates to the technical field of support frames, in particular to a support frame for pipeline installation, which is convenient to assemble. Background The pipeline is used as an important fluid conveying facility, is widely applied to the fields of petroleum, natural gas, chemical industry, water conservancy, municipal engineering and the like, has the core functions of realizing efficient, safe and long-distance transmission of media, and is generally composed of a pipe body, a connecting piece, a supporting structure and auxiliary equipment, and a modern pipeline system is various in pipeline laying modes, and comprises underground burying, overhead laying, submarine laying and the like so as to adapt to different geographic and engineering requirements. In the current PVC pipeline installation support frame, there are numerous support frames to simply carry out the centre gripping with the PVC pipeline, but unable adjustment support height because every user's height is different, is in appointed angle for a long time, can strengthen tired. Disclosure of utility model The utility model provides a support frame for installing a pipeline, which is convenient to assemble, and can enable two clamping blocks to touch two sides of the outer surface of the pipeline, so that the pipeline is kept in a limited state, and a second motor can be disassembled through a connecting plate. In order to achieve the above-mentioned purpose, provide a support frame for pipeline installation convenient to assemble, the on-line screen storage device comprises a base, the last fixed surface of base is connected with the lift storehouse, the inside rotation of upper surface in lift storehouse is connected with first threaded rod, the surface threaded connection of first threaded rod has the lifter, the inside surface sliding connection of lifter and lift storehouse, the left side fixed surface of lifter is connected with the support frame body, be provided with fixture above the support frame body, the surface fixedly connected with gear of first threaded rod, the gear is provided with two, the surface of gear has cup jointed the chain, the gear passes through the chain and is connected with another gear drive, the gear is located the top in lift storehouse, the upper surface fixedly connected with fixed plate in lift storehouse, the side surface that the fixed plate is close to first threaded rod is provided with the connecting plate. According to an equipment convenient support frame for pipeline installation, the fixed plate with the inside surface threaded connection of connecting plate has the third threaded rod, the left side fixedly connected with second motor of third threaded rod, second motor output fixedly connected with lug, the draw-in groove has been seted up to the upper surface of first threaded rod, through setting up the lug, when second motor output rotated, can utilize the lug to drive first threaded rod and rotate simultaneously, play driven effect. According to an equipment is support frame for pipeline installation convenient, lug and draw-in groove activity laminating, second motor output lower surface and the upper activity laminating of first threaded rod, the lift storehouse is provided with a plurality ofly, and distributes in the four corners of base, through setting up the second motor, the second motor can produce power for first threaded rod can rotate, plays driven effect. According to an equipment convenient support frame for pipeline installation, the groove hole has been seted up to the upper surface of base, first threaded rod rotates with the internal surface in groove hole and is connected, the inside in lift storehouse is seted up flutedly, the inside of recess is provided with the bayonet lock, through setting up the bayonet lock, when the lifter slides to suitable height, the bayonet lock can insert the inside of recess, is fixed the lifter, avoids the lifter to rely on first threaded rod for a long time to lead to the screw thread wearing and tearing, plays fixed effect. According to the support frame for pipeline installation convenient to assemble, the fixture comprises a sliding bin, a second threaded rod, a first motor, a support, a sliding block and a clamping block, wherein the sliding bin is fixedly connected to the upper surface of the support frame body. According to an equipment is support frame for pipeline installation convenient, second threaded rod threaded connection is in the inside of sliding warehouse, support fixed connection is on the right side surface of support frame body, through setting up the second threaded rod, the second threaded rod can drive two sliding blocks and slide simultaneously, plays gliding effect. According to an equipment is support frame for pipeline installation convenient, first motor fixed connection is at the upper surface of support, first m