CN-224218645-U - Hydropower station peak regulation scheduling equipment

CN224218645UCN 224218645 UCN224218645 UCN 224218645UCN-224218645-U

Abstract

The utility model relates to the technical field of hydropower stations and discloses hydropower station peak regulation scheduling equipment which comprises a hydropower station scheduling box, wherein a support base is arranged at the lower end of the hydropower station scheduling box, a first rod is arranged at the lower end of the support base, a second rod is movably arranged at the lower end of the first rod, a support base plate is arranged at the lower end of the second rod, a scheduling structure is arranged at the other end of the hydropower station scheduling box, and a control structure is arranged at the upper end of the hydropower station scheduling box. According to the hydropower station peak regulation scheduling device, the peak regulation scheduling device is improved, so that the scheduling and handling capacity of the peak regulation scheduling device is improved, the peak regulation device of the hydropower station can be rapidly scheduled according to needs in the actual use process of the peak regulation scheduling device, the peak regulation scheduling device is convenient to handle, and the scheduling effect of the hydropower station peak regulation scheduling device is improved.

Inventors

  • LI SHANGJUN
  • WEI DAOHONG
  • WANG TONG
  • LIU HANWEN
  • YU HAN

Assignees

  • 华北水利水电大学

Dates

Publication Date
20260508
Application Date
20250522

Claims (7)

  1. 1. The hydropower station peak regulation scheduling equipment comprises a hydropower station scheduling box (1) and is characterized in that a support base (2) is arranged at the lower end of the hydropower station scheduling box (1), a first rod (3) is arranged at the lower end of the support base (2), a second rod (4) is movably arranged at the lower end of the first rod (3), a support base plate (5) is arranged at the lower end of the second rod (4), a connecting pipe (6) is arranged at one end of the hydropower station scheduling box (1), a scheduling structure is arranged at the other end of the hydropower station scheduling box (1), and a control structure is arranged at the upper end of the hydropower station scheduling box (1).
  2. 2. The hydropower station peak regulation scheduling device according to claim 1, wherein the scheduling structure comprises a control groove (7), a connecting end (8) is arranged at one end of the control groove (7), a warning disc (9) is arranged at one end of the control groove (7), a signal lamp (10) is arranged at one end of the control groove (7), and a stirring handle (11) is arranged at one end of the control groove (7).
  3. 3. The hydropower station peak regulation scheduling device according to claim 2, wherein a pushing block (12) is arranged at the other end inside the control groove (7), a movable clamping block (13) is movably arranged at one end of the pushing block (12), and a rubber cushion (14) is arranged at one end of the movable clamping block (13).
  4. 4. The hydropower station peak regulation scheduling device according to claim 3, wherein a movable shaft (15) is arranged at the upper end of the hydropower station scheduling box (1), a protective door (16) is movably arranged at the lower end of the movable shaft (15), and a convenient handle (17) is arranged at one end of the protective door (16).
  5. 5. The hydropower station peak shaver dispatching equipment according to claim 4, wherein the control structure comprises a control panel (18), a display screen (19) is arranged at the upper end of the control panel (18), a control button (20) is arranged at the upper end of the control panel (18), and an indicator lamp (21) is arranged at the upper end of the control panel (18).
  6. 6. The hydropower station peak shaver dispatching device according to claim 5, wherein one end of the control panel (18) is provided with a USB interface (22), and one end of the control panel (18) is provided with a power hole (23).
  7. 7. The hydropower station peak shaver dispatching device according to claim 6, wherein a signal end (24) is arranged at the upper end of the control panel (18), and a heat dissipation plate (25) is arranged at the other end of the control panel (18).

Description

Hydropower station peak regulation scheduling equipment Technical Field The utility model relates to the technical field of hydropower stations, in particular to hydropower station peak regulation scheduling equipment. Background The hydroelectric power station consists of a hydraulic system, a mechanical system, an electric energy generating device and the like, is a hydraulic junction project for realizing the conversion from water energy to electric energy, and the sustainability of electric energy production requires that the water energy of the hydroelectric power station is utilized uninterruptedly, and the distribution of hydraulic resources in time and space is artificially regulated and changed through the construction of a reservoir system of the hydroelectric power station, so that the sustainable utilization of the hydraulic resources is realized. The utility model discloses a hydropower station peak regulation scheduling device in prior art publication No. CN218125232U, hold case diapire and box roof fixed connection, hold the left side of case roof and seted up the feed inlet, feed inlet inner wall swing joint has sealed lid, box roof fixedly connected with drawing liquid pump, the feed inlet intercommunication of drawing liquid pump has the feed liquor pipe, the feed liquor pipe left end runs through the holding case through leak-proof gum cover and extends to and hold the case inner chamber, box roof right side fixedly connected with semiconductor refrigeration group, the liquid outlet intercommunication of drawing liquid pump has the drain pipe, the drain pipe is linked together with semiconductor refrigeration group, semiconductor refrigeration group leakage fluid dram intercommunication has the fluid-discharge tube, the fluid-discharge tube bottom runs through the box roof and extends to the case inner chamber, scheduling device body outer wall encircles and installs the cooling tube, the bottom end of the liquid discharge pipe is communicated with the water inlet at the front part of the cooling pipe, the water outlet at the rear part of the cooling pipe is communicated with a communicating pipe, the top end of the communicating pipe sequentially penetrates through the box body and the accommodating box through a leakage-proof rubber sleeve, the drying component comprises a mounting plate, the bottom wall of the mounting plate is fixedly connected with the bottom wall of the box body, a plurality of accommodating ports are uniformly formed in the side wall of the mounting plate, drying agents are arranged in the accommodating ports, cooling liquid is injected into the accommodating box by opening a sealing cover, the liquid suction pump pumps the cooling liquid through the liquid inlet pipe, the liquid outlet pipe and the semiconductor refrigerating group, the liquid discharge pipe is injected into the cooling pipe for heat dissipation, and returns to the accommodating box for recycling through the communicating pipe, so that the efficiency in water cooling heat dissipation is higher, resources are saved, especially in high-temperature weather in summer, stable running of equipment can be kept, and the situation that the equipment is damaged due to high temperature is avoided, enter into the box through the through-hole, after absorbing the interior hydrone of moisture through the drier of holding the mouth on the mounting panel, circulate in the box for can prevent that moisture from entering into the circumstances that causes the equipment damage in the equipment, electronic component is contacting excessive easy trouble of moisture, influences scheduling equipment's normal use. However, in the prior art CN218125232U, due to poor scheduling and handling capabilities of a hydropower station peak-shaving scheduling device, in the actual use process of the hydropower station peak-shaving scheduling device, the peak-shaving device of the hydropower station cannot be rapidly scheduled according to needs, so that the peak-shaving scheduling device is inconvenient to handle, and the scheduling effect of the hydropower station peak-shaving scheduling device is affected. Disclosure of utility model (One) solving the technical problems The utility model aims to provide hydropower station peak regulation scheduling equipment, which aims to solve the problem that the hydropower station peak regulation scheduling equipment is poor in scheduling and handling capacity in the background technology. (II) technical scheme In order to achieve the purpose, the hydropower station peak regulation scheduling device comprises a hydropower station scheduling box, wherein a support base is arranged at the lower end of the hydropower station scheduling box, a first rod is arranged at the lower end of the support base, a second rod is movably arranged at the lower end of the first rod, a support base plate is arranged at the lower end of the second rod, a connecting pipe is arranged at one end of the hydropower s