CN-224219847-U - Titanium plate exhibit placing device
Abstract
The utility model discloses a titanium plate exhibit placing device which comprises a bottom frame, a falling frame, a baffle, a first roller and a second roller, wherein the falling frame is obliquely arranged and is arranged above the bottom frame, the first end in the length direction of the falling frame is lower than the second end, the first end is hinged with the bottom frame, the second end is connected with the bottom frame through a locking structure, the locking structure is used for fixing the relative position of the falling frame and the bottom frame, the baffle is arranged at the first end of the falling frame and used for preventing a titanium plate from sliding off, the first roller is rotatably arranged on the falling frame around the axis of the first roller, the peripheral wall of the first roller extends out of the surface of the falling frame, the second roller is rotatably arranged on the baffle around the axis of the second roller, and the peripheral wall of the second roller extends out of the surface of the baffle. The titanium plate exhibit placing device can obliquely display the large-size titanium plate, improves the display effect on the large-size titanium plate exhibits, and facilitates clients to more intuitively watch the surface quality of the titanium plate.
Inventors
- ZHANG XIAOJUN
- JIANG MENGLING
- QIN JIAN
- Tu Aidong
- YU SHILUN
- WANG YANLU
- LEI QIANG
Assignees
- 湖南湘投金天钛金属股份有限公司
Dates
- Publication Date
- 20260512
- Application Date
- 20250604
Claims (10)
- 1. A titanium plate exhibit placement device, comprising: A chassis; The first end of the falling rack in the length direction is lower than the second end in the vertical direction, the first end is hinged with the underframe, the second end is connected with the underframe through a locking structure, and the locking structure is used for fixing the relative position of the falling rack and the underframe; The baffle is arranged at the first end in the length direction of the falling frame and is used for preventing the titanium plate positioned on the falling frame from sliding off; The first roller is rotatably arranged on the falling rack around the axis of the first roller, the length extension direction of the first roller is the length direction of the falling rack, and the peripheral wall of the first roller extends out of the surface of the falling rack; The second roller is rotatably arranged on the baffle plate around the axis of the second roller, the length extension direction of the second roller is the thickness direction of the falling frame, and the peripheral wall of the second roller extends out of the surface of the baffle plate.
- 2. The titanium plate exhibit placing device according to claim 1, wherein the locking structure comprises a first pipe body, a second pipe body and a bolt, and the second pipe body is movably arranged on the first pipe body in a penetrating manner; The first pipe body is provided with a plurality of first jacks which radially penetrate through the first pipe body, and the plurality of first jacks are arranged at intervals along the length direction of the first pipe body; When the second jack is aligned with any first jack, the bolt passes through the first jack and the second jack to fix the relative positions of the first pipe body and the second pipe body.
- 3. The titanium plate display device of claim 2, wherein the underframe is provided with a first hinge seat, the placement frame is provided with a second hinge seat, the first pipe body is hinged with the first hinge seat, and the second pipe body is hinged with the second hinge seat.
- 4. The titanium plate exhibit placing device according to claim 1, wherein a first mounting pin is arranged in the middle of the underframe, and a second mounting pin is arranged in the middle of the falling rack; The titanium plate exhibit placing device further comprises an adjusting structure, two ends of the adjusting structure are respectively connected with the first mounting pin and the second mounting pin, and the adjusting structure is used for driving the first end of the falling rack in the length direction to rotate around the hinge of the underframe.
- 5. The titanium plate display device of claim 4, wherein the adjusting structure comprises a first screw, a second screw and a threaded pipe, the first screw is sleeved on the first mounting pin and can rotate around the first mounting pin, and the second screw is sleeved on the second mounting pin and can rotate around the second mounting pin; The screw thread direction of the first screw rod is opposite to the screw thread direction of the second screw rod, the first screw rod and the second screw rod are connected through the screw thread pipe, and the screw thread pipe can drive the first screw rod and the second screw rod to move relatively by rotating axially, so that the falling frame is driven to rotate around the hinge joint with the underframe.
- 6. The titanium plate display device of claim 1, wherein the first end is provided with a first rod body, and the first rod body is provided with a through hole penetrating through the first rod body; the baffle comprises an insertion part and a blocking part, wherein the insertion part is inserted into the through hole, and the blocking part extends out of the surface of the first rod body.
- 7. The titanium plate display device of claim 1, wherein the first end is provided with a first rod body, the second end is provided with a second rod body, the drop rack is provided with a first center rod, the first center rod penetrates through the second rod body and is inserted into the first rod body, and the first roller is sleeved on the first center rod.
- 8. The titanium plate display device of claim 1, wherein the baffle is provided with a mounting groove, a second center rod is mounted in the mounting groove, and the second roller is sleeved on the second center rod.
- 9. The titanium plate exhibit placing device according to claim 1, wherein a plurality of first rollers are provided, and the plurality of first rollers are arranged at intervals along the width direction of the falling rack; and/or the second rollers are arranged in a plurality, and the second rollers are arranged at intervals along the width direction of the falling frame.
- 10. The titanium plate display device of claim 1, wherein a buffer layer is arranged on the peripheral wall of the first roller and/or the second roller.
Description
Titanium plate exhibit placing device Technical Field The utility model relates to the technical field of workshop equipment, in particular to a titanium plate exhibit placing device. Background With the rise of national defense and military industry, the specification and the width of the titanium plate are larger and larger, and in order to better show the strength of titanium production enterprises, the prepared titanium plate is usually provided for customers to visit. However, the display rack for the large-size titanium plate is lacking at present, the large-size titanium plate can only be horizontally placed on the ground, so that the display effect is poor, the appearance is poor, the surface of the titanium plate is easy to reflect light, and the customer is difficult to truly observe the surface quality of the titanium plate. Disclosure of utility model The present utility model aims to solve at least one of the technical problems existing in the prior art. Therefore, the titanium plate exhibit placing device provided by the utility model can obliquely display the large-size titanium plate, so that the display effect of the large-size titanium plate exhibit is improved, and a customer can more intuitively watch the surface quality of the titanium plate. According to the embodiment of the utility model, the titanium plate exhibit placing device comprises: A chassis; The first end of the falling rack in the length direction is lower than the second end in the vertical direction, the first end is hinged with the underframe, the second end is connected with the underframe through a locking structure, and the locking structure is used for fixing the relative position of the falling rack and the underframe; The baffle is arranged at the first end in the length direction of the falling frame and is used for preventing the titanium plate positioned on the falling frame from sliding off; The first roller is rotatably arranged on the falling rack around the axis of the first roller, the length extension direction of the first roller is the length direction of the falling rack, and the peripheral wall of the first roller extends out of the surface of the falling rack; The second roller is rotatably arranged on the baffle plate around the axis of the second roller, the length extension direction of the second roller is the thickness direction of the falling frame, and the peripheral wall of the second roller extends out of the surface of the baffle plate. The titanium plate exhibit placing device provided by the embodiment of the utility model has at least the following beneficial effects: The titanium plate is placed on the falling frame which is obliquely arranged, so that the titanium plate with a large size can be displayed obliquely, the display effect of the titanium plate with a large size is improved, the surface quality of the titanium plate can be conveniently watched by customers, the falling frame is provided with the first roller, the baffle is provided with the second roller, and the titanium plate can be conveniently moved relative to the falling frame so as to move the titanium plate to an optimal display position, and meanwhile, the titanium plate can be conveniently taken and placed. According to some embodiments of the utility model, the locking structure comprises a first pipe body, a second pipe body and a bolt, wherein the second pipe body is movably arranged on the first pipe body in a penetrating way; The first pipe body is provided with a plurality of first jacks which radially penetrate through the first pipe body, and the plurality of first jacks are arranged at intervals along the length direction of the first pipe body; When the second jack is aligned with any first jack, the bolt passes through the first jack and the second jack to fix the relative positions of the first pipe body and the second pipe body. According to some embodiments of the utility model, the chassis is provided with a first hinge support, the drop frame is provided with a second hinge support, the first pipe body is hinged with the first hinge support, and the second pipe body is hinged with the second hinge support. According to some embodiments of the utility model, a first mounting pin is arranged in the middle of the underframe, and a second mounting pin is arranged in the middle of the drop rack; The titanium plate exhibit placing device further comprises an adjusting structure, two ends of the adjusting structure are respectively connected with the first mounting pin and the second mounting pin, and the adjusting structure is used for driving the first end of the falling rack in the length direction to rotate around the hinge of the underframe. According to some embodiments of the utility model, the adjusting structure comprises a first screw, a second screw and a threaded pipe, wherein the first screw is sleeved on the first mounting pin and can rotate around the first mounting pin, and the second screw