CN-224227616-U - Auxiliary pouring tool for construction of curb concrete backrest

CN224227616UCN 224227616 UCN224227616 UCN 224227616UCN-224227616-U

Abstract

The utility model discloses an auxiliary pouring tool for construction of a curb concrete backrest, which comprises a movable trolley and a template adjusting assembly, wherein the movable trolley comprises a box body and movable assemblies arranged below the box body, a material guide groove is formed in the upper portion in one end of the box body, a hopper is arranged above the box body and is communicated and connected with one end of the material guide groove, a chute is obliquely arranged on one side of the box body and is communicated and connected with the other end of the material guide groove, one end of the guide assembly is vertically connected to the box body on the side of the chute, the lower end of the guide assembly is used for completing guide work with a curb in a matched mode, and the template adjusting assembly is adjustably connected to the outer end parts of the guide assemblies and is connected with the lower end of the template adjusting assembly. The concrete pouring device is simple in structure, novel and reasonable in design, and effectively solves the problems that the concrete of the curb backrest is poured into the formwork by adopting a shovel to be shoveled, the construction efficiency is low, and the workload is high.

Inventors

  • ZOU YUNDONG
  • LI MINJU
  • Dai Xinhao
  • LI BIN
  • ZHOU LINFEI
  • YU XINGCHUN
  • WANG JIAYAN
  • WANG SHIFANG
  • GENG JIAO
  • MA CHUNLI
  • WANG YINGHAI
  • TANG LEI
  • LU TAO

Assignees

  • 云南省建设投资控股集团有限公司

Dates

Publication Date
20260512
Application Date
20250228

Claims (10)

  1. 1. An auxiliary casting tool for curb concrete backrest construction, which is characterized by comprising: the movable trolley (1), the movable trolley (1) comprises a box body (11) and a movable assembly (12) arranged below the box body (11), and a material guide groove (13) is formed in the upper part in one end of the box body (11); The hopper (2) is arranged above the box body (11) and is communicated with one end of the material guide groove (13); The chute (3) is obliquely arranged on one side of the box body (11) and is communicated with the other end of the material guide groove (13); One end of the guide component (4) is vertically connected to the box body (11) positioned at the side of the chute (3), and the lower end of the guide component (4) is used for matching with the curb (8) to complete the guide work; the template adjusting assemblies (5) are adjustably connected to the outer ends of the guide assemblies (4); The templates (6), the templates (6) are connected with the lower ends of the template adjusting components (5).
  2. 2. The auxiliary pouring tool for curb concrete backrest construction according to claim 1, further comprising a material control assembly (7) arranged at the lower part of the hopper (2), wherein the material control assembly (7) is used for controlling the opening and closing of materials and the flow rate; the material control assembly (7) comprises: The control shaft (71), the control shaft (71) is rotatably connected to the box body (11) positioned at one side of the hopper (2), one end of the control shaft (71) is positioned above the box body (11), and the other end of the control shaft is positioned in the box body (11); An operation handle (72), wherein the operation handle (72) is vertically connected to a control shaft (71) positioned above the box body (11); One end of the material baffle (73) is fixedly connected to a control shaft (71) positioned in the box body (11), and the other end of the material baffle (73) is positioned at the joint of the hopper (2) and the chute (3); The material baffle guide rail (74), the material baffle guide rail (74) is fixedly connected in the box body (11) positioned at one side of the hopper (2); wherein, striker plate (73) and striker plate guide rail (74) sliding connection.
  3. 3. The auxiliary pouring tool for curb concrete backrest construction according to claim 1, wherein the box body (11) is of a rectangular parallelepiped structure with a hollow interior as a whole; The moving assembly (12) comprises fixed wheels (121) symmetrically connected to two sides of the lower part of one end of the box body (11) and universal wheels (122) symmetrically connected to two sides of the lower part of the other end of the box body (11); Wherein, the universal wheel (122) is provided with a braking device which is matched with the universal wheel.
  4. 4. An auxiliary casting tool for curb concrete backrest construction according to claim 1, characterized in that the travelling trolley (1) further comprises: The generator (14) is fixedly connected to the upper part in the box body (11) far away from the end of the material guide groove (13), an oil filling pipe of the generator (14) penetrates through the top plate of the box body and is positioned above the box body (11), and a locking cover is connected to the oil filling pipe in a threaded manner; The driving motor (15), the driving motor (15) is fixedly connected in the box body (11) below the generator (14), the driving motor (15) is electrically connected with the generator (14), and a driving sprocket is connected to an output shaft of the driving motor (15); The fixed shaft (16), the fixed shaft (16) is fixedly connected to the rotating shafts of the two fixed wheels (121), and the driven sprocket is fixedly connected to the fixed shaft (16); The transmission chain (17), the transmission chain (17) encloses and is set up on driving sprocket and driven sprocket; The push-pull handle (18), the push-pull handle (18) is connected to the upper part of the outer side of the box body (11) far away from the end of the generator (14); The box body (11) at the end of the generator (14) is provided with a control window and a plurality of heat dissipation holes, and a plurality of control buttons for controlling the generator (14) and the driving motor (15) are arranged at the control window.
  5. 5. An auxiliary casting tool for curb concrete backrest construction according to claim 1, characterized in that the guide assembly (4) comprises: A support rod (41), wherein one end of the support rod (41) is fixedly connected to the box body (11); the fixing frame (42), the fixing frame (42) is connected to the middle part of the lower end of the supporting rod (41); the guide wheel set (43), the guide wheel set (43) is connected in the fixing frame (42).
  6. 6. The auxiliary casting tool for curb concrete backrest construction according to claim 5, wherein the cross section of the support bar (41) is in the shape of an "i"; The fixing frame (42) comprises a 匚 -shaped fixing seat and a fixing frame connecting piece connected to the middle part of the outer end of the fixing seat; The guide wheel group (43) comprises transverse guide wheels symmetrically connected to the two inner sides of the opening end of the fixing seat and vertical guide wheels connected to the inner middle part of the fixing seat.
  7. 7. The auxiliary pouring tool for construction of the curb concrete backrest according to claim 1, wherein the guide assemblies (4) are symmetrically connected to two ends of the outer side of the box body (11), the guide assemblies (4) are respectively located below the outer side of the sliding groove (3), and the guide wheel sets (43) of the guide assemblies (4) are rotatably connected to the middle of the lower end of the supporting rod (41).
  8. 8. An auxiliary casting tool for curb concrete backrest construction according to claim 1, characterized in that the formwork adjustment assembly (5) comprises: The limiting plates (51) are respectively and fixedly connected to the inner parts of two ends of the two sides of the outer end part of the supporting rod (41); The sliding seat (52), the sliding seat (52) is connected on the supporting rod (41) between the two limiting plates (51) at two sides in a sliding way; One end of the connecting plate (53) is fixedly connected with the lower end of the sliding seat (52), and the other end of the connecting plate (53) is connected with the upper part of the lower template (6); The sliding seat (52) comprises a square installation frame, a pulley rotatably connected to the middle part above the installation frame, a roller connected to the middle part inside two vertical rods of the installation frame, and a limiting part for limiting the movement of the sliding seat (52).
  9. 9. An auxiliary pouring tool for curb concrete backrest construction according to claim 1, characterized in that the material guide groove (13) is integrally formed in a shape of an open at both ends and hollow in the interior or an L-shape; The whole hopper (2) is of a square columnar structure with two open ends, hollow inside and big top and small bottom.
  10. 10. The auxiliary pouring tool for construction of the curb concrete backrest according to claim 1, characterized in that the chute (3) comprises a bottom plate and baffle plates symmetrically connected above two sides of the bottom plate, wherein the baffle plates are integrally formed into a parallelogram plate-shaped body member, and the section of the chute (3) is shaped like a figure of 匚; The whole template (6) is a square platy body component, the opposite surface of the template (6) and the movable trolley (1) is a smooth surface, and the other surface of the template (6) is a connecting surface connected with the template adjusting assembly (5).

Description

Auxiliary pouring tool for construction of curb concrete backrest Technical Field The utility model relates to a pouring device, in particular to an auxiliary pouring tool for construction of a curb concrete backrest, and belongs to the technical field of curb pouring. Background In general, a curb is a boundary stone provided at the edge of a road surface, simply referred to as a curb. The stone is used as a strip stone arranged at the boundary between the edge of the pavement and other structural belts, and plays roles of guaranteeing pedestrians, vehicles and traffic safety and guaranteeing the edge of the pavement to be neat. After the construction of the curb at the designated position is completed, the backrest is required to be poured on the side face of the curb, and the most original and traditional backrest is smeared on the backrest by a concrete technician a little, so that the construction mode has higher technical requirements on the construction of the technician, is slow in construction speed, wastes time and labor, and cannot meet the current construction requirements. At present, along with the further development of the economic society in China, the urban development is adapted, in particular, the reconstruction, the extension and the new construction of municipal road engineering occur, but most of municipal road reconstruction, the extension and the new construction are mainly positioned in old urban areas, in order to ensure the normal production and living order of people, the construction line is long because the site, the construction period and the like are limited, the unit length consumption (about 0.02m < 3 >/m) of the concrete casting of the curb concrete backrest is not large, and the construction process of the curb concrete backrest inevitably encounters some technical problems, namely the following technical defects and shortages: (1) The concrete consumption per unit length of the curb concrete backrest is small, but the template installation and concrete pouring line is long, and the influence on the construction period control is large; (2) The turnover utilization rate of the template and the template mounting and fixing piece is not high, so that resource waste is caused; (3) The concrete consumption per unit length of the curb concrete backrest is small, but the concrete pouring line is long, and the construction efficiency is low; (4) In the road lifting transformation state, the construction safety is poor due to long construction line; (5) The construction quality control difficulty of secondary pouring of the curb concrete backrest is high due to long construction line; (6) A great deal of labor is required to be invested, and the labor cost is high. In the construction process of the traditional curb concrete backrest, a template adopts a steel template, a wood template and the like, the template installation is performed manually section by section, the concrete pouring is performed section by adopting manual cooperation mechanical equipment, and a large amount of manual cooperation is needed due to small concrete consumption per unit length. Therefore, the above-described various problems inevitably exist, and in summary, it is often inconvenient. Therefore, it is necessary to develop a pouring device for assisting the construction of the curb concrete backrest with high practicability and high working reliability, which is a key point for solving the technical problems. Disclosure of Invention Aiming at the defects and shortcomings existing in the background technology, the utility model improves and innovates the defects, and aims to provide the novel and reasonable structure, which effectively solves the problems of small concrete consumption per unit length of the curb concrete backrest, long template installation and concrete pouring line and large influence on construction period control; In order to solve the problems and achieve the above object, the utility model provides an auxiliary casting tool for construction of a curb concrete backrest, which is realized by adopting the following design structure and the following technical scheme: an auxiliary casting tool for curb concrete backrest construction, comprising: the movable trolley (1), the movable trolley (1) comprises a box body (11) and a movable assembly (12) arranged below the box body (11), and a material guide groove (13) is formed in the upper part in one end of the box body (11); The hopper (2) is arranged above the box body (11) and is communicated with one end of the material guide groove (13); The chute (3) is obliquely arranged on one side of the box body (11) and is communicated with the other end of the material guide groove (13); One end of the guide component (4) is vertically connected to the box body (11) positioned at the side of the chute (3), and the lower end of the guide component (4) is used for matching with the curb (8) to complete the guide work; the template adjusting a