CN-224227656-U - Box girder post-pouring cross beam construction operation platform

CN224227656UCN 224227656 UCN224227656 UCN 224227656UCN-224227656-U

Abstract

The utility model relates to the technical field of civil engineering, and particularly discloses a box girder post-pouring cross beam construction operation platform. The lifting platform comprises a platform main body, wherein the platform main body comprises a main frame formed by welding a plurality of steel pipes, an installation interval is arranged in the main frame, a lifting table is arranged in the installation interval, an opening for the lifting table to pass through is formed in the bottom of the main frame, and a winch for lifting the lifting table is arranged at the top of the main frame. Manpower can be saved, simultaneously carry through the frame cage, single carrying volume is great, has promoted handling efficiency.

Inventors

  • Yao Jimeng
  • Lou Yongshuai
  • HOU CHAOFENG
  • ZHANG YANJUN
  • ZHANG WENYIN
  • YUAN CHANGWEI
  • ZHONG YABIN
  • DONG JIACHAO
  • MENG YAOTONG
  • LIAO HAO

Assignees

  • 中铁十局集团第四工程有限公司
  • 中铁十局集团有限公司

Dates

Publication Date
20260512
Application Date
20250422

Claims (6)

  1. 1. A box girder post-pouring cross beam construction operation platform is characterized by comprising a platform main body (100), wherein the platform main body (100) comprises a main frame (110) formed by welding a plurality of steel pipes, an installation section (270) is arranged in the main frame (110), a lifting table (120) is arranged in the installation section (270), an opening (260) for the lifting table (120) to pass through is formed in the bottom of the main frame (110), and a winch (130) for hanging the lifting table (120) is arranged at the top of the main frame (110).
  2. 2. The post-pouring cross beam construction work platform of claim 1, wherein the lifting platform (120) comprises a rectangular frame cage, and a door plate (420) hinged with the frame cage is arranged on one side of the frame cage.
  3. 3. The post-cast beam construction work platform of claim 2, wherein a guide assembly is arranged between the main frame (110) and the frame cage, the guide assembly comprises a connecting piece (220) arranged at the main frame (110) and a guide piece (410) arranged at the frame cage, the connecting piece (220) comprises a vertical rod (320) connected with the main frame (110), a first connecting block (310) arranged towards the frame cage is arranged at the side wall of the vertical rod (320), a sleeve (330) is arranged at one end, far away from the vertical rod (320), of the first connecting block (310), the guide piece (410) comprises a guide rod (620) arranged along the height direction of the main frame (110) and penetrating through the sleeve (330), and a second connecting block (630) connected with the frame cage is arranged at the lower end of the guide rod (620).
  4. 4. The post-cast beam construction work platform of claim 3, wherein a baffle (610) is arranged at one end of the guide rod (620) far away from the second connecting block (630).
  5. 5. The post-pouring cross beam construction work platform of claim 1, wherein rollers (230) are arranged at the bottom of the main frame (110).
  6. 6. The post-pouring cross beam construction work platform of claim 1, wherein a hoop (210) for connecting a rope of a winch (130) and the frame cage is arranged above the frame cage.

Description

Box girder post-pouring cross beam construction operation platform Technical Field The utility model relates to the technical field of civil engineering, in particular to a box girder post-pouring cross beam construction operation platform. Background Along with the increasing of the domestic construction technology level, in the construction process of a small pre-stress box girder of a highway, a middle cross beam of a railway T-shaped girder and an end cross beam, a wooden template is usually adopted for opposite pulling construction, workers need to work below the box girder, in the process construction, the steel bars and the templates are usually transferred by manpower to be matched with a simple hanging basket for working, or a climbing vehicle is adopted for carrying construction devices, the process uses the manpower to transfer the steel bars and the templates, wastes time and labor, the simple hanging basket has high safety risk, the device is not easy to transport, the climbing vehicle has large volume, the requirement on the condition of a construction site is high, and the construction limit is large. Disclosure of utility model The utility model provides a box girder post-pouring cross beam construction operation platform which can overcome certain or some defects in the prior art. The box girder post-pouring cross beam construction operation platform comprises a platform main body, wherein the platform main body comprises a main frame formed by welding a plurality of steel pipes, an installation interval is arranged in the main frame, a lifting table is arranged in the installation interval, an opening for the lifting table to pass through is formed in the bottom of the main frame, and a winch for lifting the lifting table is arranged at the top of the main frame. When a constructor uses an operation platform to carry construction devices such as steel bars, the constructor pushes the main frame to roll, 4 rollers at the bottom end of the main frame roll, so that the main frame moves to a designated place, the constructor can conveniently move the operation platform, after the main frame moves to the designated place, the constructor starts a winch, the winch drops down the lifting table, after the lifting table drops down below a box girder, the constructor below the box girder pulls open a door plate, a frame cage is opened, then the constructor carries the required construction device into the frame cage, after the carrying is completed, the constructor closes the door plate, then the door plate and the frame cage are fixed through bolts, the door plate is prevented from being opened when the winch lifts the frame cage upwards, the construction device falls down to hurt people, after the frame cage is lifted up to the box girder, the constructor opens the door plate, and takes out the construction device in the box girder. Preferably, the lifting platform comprises a rectangular frame cage, and a door plate hinged with the frame cage is arranged on one side of the frame cage. According to the utility model, the door plate is used for blocking construction devices shipped in the frame cage and preventing the construction devices from falling in the carrying process. Preferably, a guide assembly is arranged between the main frame and the frame cage, the guide assembly comprises a connecting piece arranged at the main frame and a guide piece arranged at the frame cage, the connecting piece comprises a vertical rod connected with the main frame, a first connecting block arranged towards the direction of the frame cage is arranged at the side wall of the vertical rod, a sleeve is arranged at one end, far away from the vertical rod, of the first connecting block, the guide piece comprises a guide rod arranged along the height direction of the main frame and penetrating through the sleeve, and a second connecting block connected with the frame cage is arranged at the lower end of the guide rod. According to the utility model, the guide rod can ascend or descend along the sleeve in the hoisting process of the frame cage by the hoisting machine, so that the stability of the frame cage in moving is better improved, and meanwhile, when the frame cage stops moving, the sleeve fixes the guide rod to prevent the frame cage from shaking, so that a constructor can conveniently transport a construction device into the frame cage or transport the construction device out of the frame cage. Preferably, a baffle is arranged at one end of the guide rod away from the second connecting block. According to the utility model, the guide rod descends along the sleeve in the descending process of the frame cage, and finally the baffle plate at the top of the guide rod is contacted with the sleeve, so that the baffle plate is blocked by the sleeve and is prevented from separating from the sleeve, and the baffle plate is connected with the guide rod in a welding mode. Preferably, the bottom of the main frame is provid