CN-224227786-U - Construction device for rotary digging pore-forming ultra-long permanent steel pile casing filling pile

CN224227786UCN 224227786 UCN224227786 UCN 224227786UCN-224227786-U

Abstract

The utility model provides a construction device for rotary digging a pore-forming overlength permanent steel pile casing filling pile, which is used for constructing the rotary digging pore-forming overlength permanent steel pile casing filling pile and comprises a positioning frame for positioning the steel pile casing, wherein an upper arc steel plate and a lower arc steel plate are arranged on the positioning cylinder in the positioning frame, a horizontal jack is arranged at the position of the upper arc steel plate, an arc steel plate jacking block is arranged on the horizontal jack, an impact gravity hammer movable rail is arranged at the bottom of the steel pile casing, wherein the impact gravity hammer is connected with the impact gravity hammer movable rail through an impact gravity hammer movable rail connecting device, and a telescopic chassis is arranged at the bottom of the impact gravity hammer movable rail, so that the construction efficiency and quality can be improved.

Inventors

  • WANG ZHEN
  • JIANG LINGJUN
  • PAN TINGFENG
  • XUE LIN
  • ZHANG YUZHE
  • LIU RENJIE
  • ZHAO JIALE
  • ZHANG YINXING
  • Ni Yangkai
  • ZHENG SHIJUN

Assignees

  • 浙江交工地下工程有限公司
  • 浙江交工集团股份有限公司

Dates

Publication Date
20260512
Application Date
20241101

Claims (10)

  1. 1. A construction equipment of dig pore-forming overlength permanent steel pile casing bored concrete pile soon for install steel pile casing, its characterized in that includes: The positioning frame (20) is used for positioning the steel pile casing (14), wherein an upper arc-shaped steel plate (15) and a lower arc-shaped steel plate (13) are arranged on the positioning cylinder in the positioning frame (20), a horizontal jack (12) is arranged at the position of the upper arc-shaped steel plate (15), and an arc-shaped steel plate jacking block (11) is arranged on the horizontal jack (12); The impact gravity hammer movable rail (26) is arranged at the bottom of the steel casing (14), wherein the impact gravity hammer (28) is connected with the impact gravity hammer movable rail (26) through the impact gravity hammer movable rail connecting device (27), and a telescopic chassis (30) is arranged at the bottom of the impact gravity hammer movable rail (26).
  2. 2. The construction device for the rotary-digging pore-forming overlength permanent steel casing cast-in-place pile according to claim 1, wherein the upper structure of the frame body of the positioning frame (20) is a trapezoid structure erected by adopting I-steel, and the lower structure of the frame body is a supporting structure distributed in four directions by adopting four steel pipe piles (4).
  3. 3. The construction device for the rotary digging pore-forming overlength permanent steel casing filling pile according to claim 2, wherein the transverse and vertical supports of the upper structure of the frame body are I32a I-steel (1), the outer diagonal support is I28a I-steel (3), and the joints of the different I-steels are welded and fixed.
  4. 4. The construction device for the rotary-excavated hole-forming ultra-long permanent steel casing cast-in-place pile according to claim 1, wherein the construction platform (2) formed by I14a I-steel is welded on the top surface of the upper structure of the frame body, and the construction platform (2) serves as a steel casing positioning construction platform and extends to the outside relative to the upper structure of the frame body.
  5. 5. Construction equipment of dig hole overlength permanent steel pile casing bored concrete pile soon according to claim 1, characterized in that upper portion arc steel sheet (15) and lower arc steel sheet (13) are along the interval setting of height direction in the locating cylinder, and upper portion arc steel sheet (15) and lower arc steel sheet (13) face away from steel pile casing (14) one end welding have steel bracket (16), and steel bracket (16) are fixed on the locating rack.
  6. 6. Construction equipment for rotary drilling bored concrete pile with ultra-long permanent steel pile casing according to claim 1, characterized in that the horizontal jack (12) is welded above the steel corbel (16) of the upper arc steel plate (15) and the arc steel plate top block (11) is welded on the horizontal jack (12), wherein the arc steel plate top block (11) extends towards the position of the steel pile casing (14).
  7. 7. The construction device for the rotary-excavated hole-forming ultra-long permanent steel casing cast-in-place pile according to claim 1, wherein the impact gravity hammer movable rail (26) forms a rail space, the impact gravity hammer (28) is arranged in the rail space, and two ends of the impact gravity hammer (28) are movably erected on the impact gravity hammer movable rail (26) through the impact gravity hammer movable rail connecting device (27).
  8. 8. Construction equipment for rotary drilling bored concrete pile with ultra-long permanent steel pile casing according to claim 1, characterized in that the pile casing bottom (32) of the steel pile casing is set up on the impact gravity hammer movable rail (26), the pile casing reaming head (31) is located in the pile casing bottom (32), the telescopic chassis (30) is arranged in the space between the impact gravity hammer (28) and the pile casing reaming head (31).
  9. 9. The construction device for the rotary digging pore-forming overlength permanent steel casing cast-in-place pile is characterized in that two nylon ropes are arranged at the bottom of a steel casing (14) to form a cross fork (10), a nylon string (9) is tied at the crossing position of the cross fork (10), a floating disc (7) is connected to the nylon string (9), and a level meter (8) is arranged on the floating disc (7).
  10. 10. The construction device for the rotary-excavated hole-forming overlength permanent steel casing cast-in-place pile according to claim 1, wherein the outer side of the top of the steel casing (14) is welded and fixed with an inclinometer (6) through an I-steel lock catch (5).

Description

Construction device for rotary digging pore-forming ultra-long permanent steel pile casing filling pile Technical Field The utility model relates to the field of bridge engineering construction, in particular to a construction device for a rotary-digging pore-forming ultra-long permanent steel casing cast-in-place pile. Background The steel pile casing is a temporary structure in pile foundation construction, can effectively protect the pile foundation so as to avoid dangerous conditions such as hole collapse and the like in the construction process, and has important supporting effects on improving the shock resistance and keeping the whole safety and stability of the bridge pile foundation. In most bridge pile foundation construction processes, steel casings are not typically used as stress members, but are removed after the pile foundation is completed. Along with the continuous deep construction of bridge engineering in China, the bridge construction difficulty is higher and higher, and the permanent steel pile casing is a construction process with higher application technical degree in bridge pile foundation construction at present. The earthquake multiple-occurrence area is greatly influenced by earthquake force, the current reinforcement pile foundation is difficult to resist the influence of the strong earthquake force, and in order to ensure the integral stability of the bridge pile foundation, a steel pile casing is often adopted to resist the damage of factors such as the earthquake force to the bridge. The permanent steel pile casing has the advantages of simple manufacture, quick installation, convenient transportation and processing and the like, the foundation pit excavation engineering quantity is large in river channel construction, only pile foundation positions and construction operation areas need to be excavated when the permanent steel pile casing is adopted, foundation pit excavation can be effectively reduced, and construction difficulty is reduced. When the traditional bored pile construction technology is adopted, permanent steel pile casings are usually required to be driven first, and then pile foundation construction is carried out. When the pile foundation construction engineering with large burial depth is carried out, the construction difficulty of the required permanent steel pile casing is high, the cost is high, the site construction progress is seriously influenced, the steel pile casing position deviation easily occurs in the process of lowering the permanent steel pile casing, the phenomenon of pile slipping is carried out on the permanent steel pile casing in a sinking mode, the construction precision of the permanent steel pile casing is poor, the construction efficiency is low, and the progress is slow. In view of the above, a new construction device for rotary digging the bored super-long permanent steel pile casing filling pile is urgently needed to overcome the defects in the construction of the conventional permanent steel pile casing, improve the construction efficiency, improve the construction quality and ensure the safe and reliable construction quality. Disclosure of utility model The utility model aims to provide a construction device for rotary-digging a pore-forming ultra-long permanent steel casing cast-in-place pile, which is used for the construction of the rotary-digging pore-forming ultra-long permanent steel casing cast-in-place pile, and can improve the construction efficiency and the construction quality. In order to achieve the above object, the present technical scheme provides a construction device for rotary digging hole-forming overlength permanent steel casing cast-in-place pile for installing steel casing, comprising: The positioning frame is used for positioning the steel pile casing, wherein an upper arc-shaped steel plate and a lower arc-shaped steel plate are arranged on the positioning cylinder in the positioning frame, a horizontal jack is arranged at the position of the upper arc-shaped steel plate, and an arc-shaped steel plate jacking block is arranged on the horizontal jack; The impact gravity hammer movable rail is arranged at the bottom of the steel casing, wherein the impact gravity hammer is connected with the impact gravity hammer movable rail through the impact gravity hammer movable rail connecting device, and a telescopic chassis is arranged at the bottom of the impact gravity hammer movable rail. Compared with the prior art, the technical scheme has the following characteristics and beneficial effects: 1. The positioning frame for connecting the permanent steel pile casing and the steel reinforcement cage is adopted, the working procedure of the primary steel pile casing is canceled, the steel pile casing and the steel reinforcement cage are integrally lowered, the problem of difficult construction of the steel pile casing with large embedded depth is solved, the construction cost is reduced, and the construction efficien