Search

CN-224228198-U - Building plastering shovel

CN224228198UCN 224228198 UCN224228198 UCN 224228198UCN-224228198-U

Abstract

The utility model discloses a building plastering shovel, which relates to the technical field of building plastering shovels and particularly comprises a shovel body, wherein a spreading plate is rotationally connected to the side surface of the upper surface of the shovel body through a hinge, a slurry storage cavity is fixedly connected to the upper surface of the shovel body, a sliding rail is fixedly connected to the outer surface of the slurry storage cavity, a sliding block is slidingly connected to the inner side wall of the sliding rail, a first connecting rod is rotationally connected to the outer surface of the sliding block through a shaft rod, a handle is fixedly connected to the upper surface of the slurry storage cavity, an extrusion rod is rotationally connected to the inner side wall of the handle, a first limiting block is slidingly connected to the inner side wall of the first sliding groove, a second limiting block is slidingly connected to the inner side wall of the second sliding groove, an extrusion plate is rotationally connected to the inner side wall of the slurry storage cavity through a shaft rod, and a hand buckle is rotationally connected to the outer surface of the right end of the slurry storage cavity.

Inventors

  • LI HUI

Assignees

  • 李慧

Dates

Publication Date
20260512
Application Date
20250208

Claims (8)

  1. 1. A building ash-spreading shovel is characterized in that a spreading plate is rotatably connected to the side face of the upper surface of the shovel body through a hinge, a notch is formed in the outer surface of the spreading plate, the upper surface of the shovel body is fixedly connected with a slurry storage cavity, a sliding rail is fixedly connected to the outer surface of the slurry storage cavity, a sliding block is slidably connected to the inner side wall of the sliding rail, a first connecting rod is rotatably connected to the outer surface of the sliding block through a shaft rod, a handle is fixedly connected to the upper surface of the slurry storage cavity, an extrusion rod is rotatably connected to the inner side wall of the handle, a first sliding groove is formed in the inner side wall of the extrusion rod, a first limiting groove and a second limiting groove are formed in two sides of the outer surface of the lifting rod respectively, a second sliding groove is formed in the inner side wall of the handle, a second limiting groove is slidably connected to the inner side wall of the second limiting groove, a fourth spring is fixedly connected to the outer side of the lifting rod, an extrusion plate is slidably connected to the inner side wall of the slurry storage cavity, a hand buckle is rotatably connected to the inner side wall of the handle, an end cover is rotatably connected to the outer surface of the right end of the slurry storage cavity, an end cover is rotatably connected to the outer surface of the end cover through the shaft rod, and an arc-shaped connecting rod is fixedly connected to the arc-shaped connecting rod is rotatably connected to the lower end of the arc-shaped shovel.
  2. 2. The construction plastering shovel according to claim 1, wherein the paving plates are symmetrically arranged, and the plurality of notches are uniformly distributed in a rectangular array mode.
  3. 3. The construction plastering shovel according to claim 1, wherein the inner side wall of the sliding block is connected with an elastic knob in a threaded mode, the outer surface of the elastic knob is abutted to the outer surface of the sliding rail, and one end of the first connecting rod is rotatably connected with the outer surface of the hinge through a connecting column.
  4. 4. The construction plastering shovel according to claim 1, wherein a fifth spring is fixedly connected to the upper surface of the extrusion rod, and one end of the fifth spring is fixedly connected with the inner top wall of the handle.
  5. 5. The construction plastering shovel according to claim 1, wherein the outer surface of the first limiting block is abutted against the second spring, one end of the second spring is fixedly connected with the inner side wall of the first sliding groove, the outer surface of the first limiting block is fixedly connected with a latch, and the latch is clamped with the inner side wall of the first limiting groove.
  6. 6. The construction plastering shovel according to claim 1, wherein the outer surface of the second limiting block is fixedly connected with a third spring, one end of the third spring is fixedly connected with the inner side wall of the second sliding groove, the outer surface of the second limiting block is fixedly connected with limiting teeth, and the outer surface of the limiting teeth is clamped with the inner side wall of the second limiting groove.
  7. 7. The construction plastering shovel according to claim 1, wherein the upper end of the lifting column is fixedly connected with a limiting plate, the upper end of the fourth spring is abutted against the lower surface of the limiting plate, the lower end of the lifting column penetrates through the upper surface of the slurry storage cavity, and the lower end of the lifting column is fixedly connected with the upper surface of the extrusion plate.
  8. 8. The construction plastering shovel according to claim 1, wherein one end of the second connecting rod is rotatably connected with the lower end of the hand button through a shaft rod, a splayed spring is arranged on the outer surface of the shaft rod of the hand button, and two ends of the splayed spring are fixedly connected with the outer surface of the hand button and the inner side wall of the handle respectively.

Description

Building plastering shovel Technical Field The utility model relates to the technical field of building plastering shovels, in particular to a building plastering shovel. Background Plastering is a decoration process of applying mortar to the walls, floor, ceiling and surface of a building. Some areas of our country are also called "whitewashes" or "whitewashes". The plastering engineering refers to a system construction process of coating the surface of a base material with plastering mortar, and has the functions of protecting a base layer and improving the appearance and provides special functions for a building. The plastering engineering has two main functions of protecting wall from being corroded by wind, rain and snow, increasing the moistureproof, weather-proof and heat-insulating capacities of the wall, improving the durability and thermal performance of the wall, beautifying, improving indoor sanitary conditions, purifying air, beautifying the environment and improving living comfort. In plastering engineering, a plastering spade tool is required. In the construction plastering shovel disclosed in the Chinese patent application publication No. CN221422567U, although cement mortar is stored in a slurry storage cavity through installing the slurry storage cavity and arranging the slurry storage cavity on a shovel body, the cement mortar is pushed to the slurry storage cavity through a squeezing plate, a worker does not need to bend to take the slurry during operation, the operation flow is simplified, is improved in working efficiency, but in use, the construction plastering shovel is relatively complex in grouting process, relatively low in efficiency and relatively high in operation difficulty through injecting the cement mortar from the slurry storage cavity, and relatively inconvenient in use, and in addition, the mortar is difficult to be paved uniformly in the practical use process of the shovel body, the uniform paving effect on the mortar is relatively poor in the practical use process of the utility model, and in addition, the upper end of a pressing key is required to be pressed by fingers in the practical use of the utility model, the phenomenon of finger ache is often caused during multiple operations, and the load of an operator is seriously increased, so the construction plastering shovel is required to solve the defects. Disclosure of utility model (One) solving the technical problems Aiming at the defects of the prior art, the utility model provides a building plastering shovel, which solves the problems in the background technology. (II) technical scheme In order to achieve the above purpose, the utility model is realized by the following technical scheme: The utility model provides a building is smeared ash shovel, includes the shovel body, the side of the upper surface of the shovel body is connected with the stand board through the hinge rotation, the breach has been seted up to the surface of stand board, the upper surface fixedly connected with of the shovel body deposits the thick liquid chamber, the surface fixedly connected with slide rail of thick liquid chamber, the inside wall sliding connection of slide rail has the slider, the surface of slider is connected with first connecting rod through the axostylus axostyle rotation, the upper surface fixedly connected with handle of thick liquid chamber is deposited, the inside wall rotation of handle is connected with the extrusion rod, first spout has been seted up to the inside wall of extrusion rod, the inside wall sliding connection of first spout has first stopper, the inside wall grafting of handle has the lift post, first spacing groove and second spacing groove have been seted up respectively to the both sides of the surface of lift post, the inside wall sliding connection of second spout has the second stopper, the upper surface of handle is located the outside fixedly connected with fourth spring of lift post, the inside wall sliding connection of thick liquid chamber has the handle, the inside wall sliding connection has the handle, the side wall sliding connection of handle has the handle through the arc-shaped end cover, the outer surface fixedly connected with end cover of handle through the arc-shaped connection has the handle, the arc-shaped end cover. Optionally, the spreading plate is provided with two and symmetrically arranged, and the notches are provided with a plurality of and uniformly distributed in a rectangular array mode. Optionally, the inside wall threaded connection of slider has the elasticity knob, the surface of elasticity knob and the surface butt of slide rail, the one end of first connecting rod is rotated with the surface of hinge through the spliced pole and is connected. Optionally, the upper surface fixedly connected with fifth spring of extrusion pole, the one end of fifth spring is fixedly connected with the interior roof of handle. Optionally, the surface butt of first stopper has the