Search

CN-224228226-U - Outer wall hanging basket for construction

CN224228226UCN 224228226 UCN224228226 UCN 224228226UCN-224228226-U

Abstract

The utility model discloses an outer wall hanging basket for construction, which comprises a basket body, a guide rope, a transverse plate and a fixing assembly, wherein the fixing assembly comprises a bottom plate, the bottom end of the guide rope is fixedly connected with the bottom plate, an installation assembly is fixedly arranged on the lower surface of the transverse plate, a winding assembly for winding the guide rope is arranged on the upper surface of the transverse plate, the top end of the basket body is fixedly provided with the guide plate, and one side of the guide plate is provided with a first through hole. According to the utility model, the basket body, the guide rope, the fixing component, the transverse plate, the mounting component, the winding component and the guide plate are arranged, the bottom end of the guide rope is fixed with the ground through the fixing component, the top end of the guide rope is fixed at the top of a building through the mounting component, so that the guide rope is straightened, the guide plate can move up and down along the guide rope, and after the guide plate is fixedly connected with the basket body, the guide plate is driven to move when the basket body moves up and down, and at the moment, the guide rope plays a limiting role on the basket body, so that the shaking amplitude of the basket body is avoided to be too large, and the safety in construction is improved.

Inventors

  • SUN LEI
  • WANG CHUNYANG
  • SHI ZHAOLEI
  • Dong Suichao
  • LI JUNJIE
  • WANG TIANYUE

Assignees

  • 中交第一航务工程局有限公司
  • 中交一航局武汉建设投资有限公司

Dates

Publication Date
20260512
Application Date
20250610

Claims (7)

  1. 1. The outer wall hanging basket for construction is characterized by comprising a basket body (1), a guide rope (2), a transverse plate (4) and a fixing assembly (3), wherein the fixing assembly (3) comprises a bottom plate (31), the bottom end of the guide rope (2) is fixedly connected with the bottom plate (31), an installation assembly (5) is fixedly arranged on the lower surface of the transverse plate (4), a winding assembly (6) for winding the guide rope (2) is arranged on the upper surface of the transverse plate (4), a guide plate (7) is fixedly arranged at the top end of the basket body (1), a first through hole (71) is formed in one side of the guide plate (7), and the guide rope (2) penetrates through the first through hole (71) and is in sliding connection with the first through hole (71).
  2. 2. The construction outer wall hanging basket according to claim 1 is characterized in that a plurality of hanging lugs (10) are fixed on the top of the basket body (1).
  3. 3. The construction outer wall hanging basket according to claim 1, wherein a connecting bolt (8) is fixed at the top end of the basket body (1), a second through hole (72) for penetrating the connecting bolt (8) is formed in the guide plate (7), and an inner threaded cap (9) is connected to the connecting bolt (8) through the top surface of the second through hole (72) through threaded rotation.
  4. 4. The construction outer wall hanging basket according to claim 1, wherein a plurality of perforations are formed on the side edge of the bottom plate (31), and ground nails (32) are arranged in the perforations in a penetrating manner.
  5. 5. The construction outer wall hanging basket according to claim 1, wherein the installation assembly (5) comprises a first vertical plate (51) and a second vertical plate (52) which are fixed on the lower surface of the transverse plate (4), a screw rod (53) penetrates through the middle of the second vertical plate (52) and is connected with the middle through screw threads in a rotating mode, one end, close to the first vertical plate (51), of the screw rod (53) is connected with a clamping plate (54) through a bearing in a rotating mode, and the other end of the screw rod (53) is fixed with a first hand wheel (55).
  6. 6. The construction outer wall hanging basket according to claim 1, wherein the winding assembly (6) comprises two side plates (61) fixed on the upper surface of the transverse plate (4), a transverse shaft (62) is rotatably connected between the two side plates (61) through a bearing, a wire roller (63) is fixed on the surface of the transverse shaft (62), a round hole (41) is formed in the position, below the wire roller (63), of the transverse plate (4), the top end of the guide rope (2) penetrates through the round hole (41) and is wound on the surface of the wire roller (63), and a second hand wheel (64) is fixed at one end of the transverse shaft (62).
  7. 7. The construction outer wall hanging basket according to claim 6, wherein the side edge of the second hand wheel (64) penetrates through and is connected with a fastening bolt (65) through threaded rotation.

Description

Outer wall hanging basket for construction Technical Field The utility model relates to the technical field of building construction hanging baskets, in particular to an outer wall hanging basket for construction. Background The building construction outer wall hanging basket is high-altitude operation equipment and is mainly used for operations such as construction, decoration, maintenance, cleaning and the like of building outer walls. The hanging basket platform is fixed on the top or the vertical face of a building through the hanging mechanism, and the hanging basket platform is pulled to move up and down by a steel wire rope or a chain, so that a safe and flexible high-altitude operation space is provided for constructors. The hanging basket platform is made of steel structure or aluminum alloy, is light and has strong bearing capacity, and the safety lock and the anti-tilting device ensure emergency braking under emergency conditions and ensure personnel safety. When the hanging basket is used, the hanging basket is driven by the hoister and the steel wire rope to lift outside the building. However, the existing hanging basket still has the defects that when the hanging basket is driven to lift by the steel wire rope, if the hanging basket encounters cross wind, the hanging basket can shake very much, and certain potential safety hazard exists. And only restrict the hanging basket through wire rope, and when the workman stands on the hanging basket and whitewashes the wall, once the workman applys extrusion force to the wall, the hanging basket is by reverse promotion to keep away from the building outer wall, influences construction operation, consequently needs further improvement. Disclosure of utility model The utility model aims to solve the defects in the prior art and provides an outer wall hanging basket for construction. In order to achieve the aim, the outer wall hanging basket for construction comprises a basket body, a guide rope, a transverse plate and a fixing assembly, wherein the fixing assembly comprises a bottom plate, the bottom end of the guide rope is fixedly connected with the bottom plate, an installation assembly is fixedly arranged on the lower surface of the transverse plate, a winding assembly for winding the guide rope is arranged on the upper surface of the transverse plate, the top end of the basket body is fixedly provided with the guide plate, and one side of the guide plate is provided with a first through hole, and the guide rope penetrates through the first through hole and is in sliding connection with the first through hole. Further, a plurality of lifting lugs are fixed at the top of the basket body. Further, the top end of the basket body is fixedly provided with a connecting bolt, the guide plate is provided with a second through hole for penetrating the connecting bolt, and the connecting bolt penetrates through the top surface of the second through hole and is connected with an internal thread cap through thread rotation. Furthermore, a plurality of perforations are formed in the side edge of the bottom plate, and ground nails are arranged in the perforations in a penetrating mode. Further, the installation component is including being fixed in first riser and the second riser of diaphragm lower surface, the second riser middle part runs through and is connected with the screw rod through the screw thread rotation, the screw rod is close to first riser one end and is connected with splint through the bearing rotation, the screw rod other end is fixed with first hand wheel. Further, the winding assembly comprises two side plates fixed on the upper surface of the transverse plate, a transverse shaft is rotatably connected between the two side plates through a bearing, a wire roller is fixed on the surface of the transverse shaft, a round hole is formed in the position, below the wire roller, of the transverse plate, the top end of the guide rope penetrates through the round hole and is wound on the surface of the wire roller, and a second hand wheel is fixed at one end of the transverse shaft. Further, the second hand wheel side runs through and is connected with fastening bolt through the screw thread rotation. The utility model has the beneficial effects that: 1. When the outer wall hanging basket for construction is used, the basket body, the guide rope, the fixing assembly, the transverse plate, the mounting assembly, the winding assembly and the guide plate are arranged, the bottom end of the guide rope is fixed with the ground through the fixing assembly, the top end of the guide rope is fixed at the top of a building through the mounting assembly, so that the guide rope is straightened, the guide plate can move up and down along the guide rope, and after the guide plate is fixedly connected with the basket body, the guide plate is driven to move when the basket body moves up and down, and at the moment, the guide rope plays a limiting role on the basket