CN-224228264-U - Climbing frame concrete pouring baffle
Abstract
The utility model discloses a climbing frame concrete pouring baffle which comprises a plurality of baffle bodies, wherein the baffle bodies are connected to form a baffle plate, the baffle plate is arranged on a frame beam of the climbing frame, sealing strips are arranged on two sides of a joint after the baffle bodies are connected, a clamping groove is formed in the upper end of each baffle body, a clamping block is arranged at the lower end of each baffle body, a C-shaped groove plate is formed in the top of the most top baffle body on the baffle plate, the C-shaped groove plate is formed in the top of one end, close to the climbing frame, of the baffle plate, the C-shaped groove is used for hanging the baffle plate on the frame beam of the climbing frame, two double-layer baffle plate mounting plates are symmetrically arranged at the bottom of one end, close to the climbing frame, of the baffle plate mounting plates, two through holes are formed in the double-layer baffle plate mounting plates, the same central axis is arranged between the through holes, and the baffle plates are arranged inside the two through holes in a penetrating manner. The problem that the concrete pouring baffle is not adjustable and easy to spill is solved.
Inventors
- LI TONGHUI
- SHI DONGLANG
- ZHANG LEI
- WANG YI
- YUAN JUNGANG
- SONG TING
Assignees
- 陕西建工新城建设投资有限公司
Dates
- Publication Date
- 20260512
- Application Date
- 20250418
Claims (8)
- 1. The utility model provides a climb a concrete pouring baffle for splash climbs the concrete of frame when sheltering from the pouring concrete, and climb the frame and be the structure that has the frame that reinforcing bar vertically and horizontally staggered formed, the upper end of frame has a crossbeam, its characterized in that includes: The device comprises a plurality of baffle main bodies (1), wherein each baffle main body (1) is detachably connected, a plurality of baffle main bodies (1) are connected to form a shielding plate (2), the shielding plate (2) is used for shielding concrete filler splashed by a climbing frame in the casting process, the shielding plate (2) is arranged on a frame cross beam of the climbing frame, and sealing strips (3) are arranged on two sides of a joint after each baffle main body (1) is connected; the upper end of the baffle main body (1) is provided with a clamping groove (4), the lower end of the baffle main body (1) is provided with a clamping block (5), and the clamping block (5) is detachably connected with the clamping groove (4); The top end of the baffle body (1) on the shielding plate (2) is provided with a C-shaped groove plate (7) at the top part close to one end of the climbing frame, the C-shaped groove plate (7) is provided with a C-shaped groove (8), and the C-shaped groove (8) is used for hanging the shielding plate (2) against a frame cross beam of the climbing frame; Two double-layer stop lever mounting plates (9) are symmetrically arranged at the bottom of one end, close to the climbing frame, of the stop plate main body (1), two through holes (10) are formed in one double-layer stop lever mounting plate (9), and the same central axis is arranged between the through holes (10) between the two symmetrically arranged double-layer stop lever mounting plates (9); The stop lever (11) is installed inside the two through holes (10) in a penetrating mode, and the length of the stop lever (11) is larger than that of one climbing frame.
- 2. A climbing frame concrete pouring baffle according to claim 1, characterized in that the width of the baffle body (1) is adapted to the climbing frame.
- 3. The climbing frame concrete pouring baffle according to claim 2, wherein the cross section of the clamping groove (4) is of a T shape, the clamping block (5) is matched with the clamping groove (4), and the clamping groove (4) is in sliding connection with the clamping block (5).
- 4. A climbing frame concrete pouring baffle according to claim 3, characterized in that the stop lever (11) is a solid steel pipe, the cross section of the stop lever (11) is matched with the cross section of the through hole (10), and the stop lever (11) passes through the through hole (10).
- 5. The climbing frame concrete pouring baffle according to claim 4, wherein the opening of the C-shaped groove (8) of the C-shaped groove plate (7) faces to the climbing frame beam, and the shielding plate (2) is hung on the climbing frame beam through the C-shaped groove plate (7) so as to be convenient to install and detach.
- 6. The climbing frame concrete pouring baffle according to claim 5, wherein a reinforcing rib (6) is arranged on the shielding plate (2), and the reinforcing rib (6) is used for improving the strength of the shielding plate (2); The reinforcing rib (6) is arranged at one end of the shielding plate (2) principle climbing frame, and the reinforcing rib (6) is in threaded connection with the shielding plate (2).
- 7. The climbing frame concrete pouring baffle according to claim 6, wherein limiting blocks are arranged at two ends of the stop rod (11), the diameter of each limiting block is larger than that of the through hole (10), and the stop rod (11) is prevented from falling off from the through hole (10).
- 8. A climbing frame concrete pouring screen according to claim 7, characterized in that the sealing strip (3) is glued to the joint of the shielding plate (2).
Description
Climbing frame concrete pouring baffle Technical Field The utility model relates to the technical field of building construction, in particular to a climbing frame concrete pouring baffle. Background When high-rise building is under construction, the baffle that usually uses is mostly fixed temporarily by iron sheet, is not closely enough with the whipstock connection of climbing the frame, produces the condition that leaks thick liquid pollution lower floor easily, leads to concrete slurry to spill and causes construction waste, but if use seal baffle structure, be difficult to carry out the regulation of height again, can't adjust according to the frame height of climbing the frame in real time. Therefore, a new climbing frame concrete pouring baffle becomes a problem which needs to be solved by the person skilled in the art. Disclosure of utility model The application provides a climbing frame concrete pouring baffle plate, which is used for splashing concrete of a climbing frame when pouring concrete, the climbing frame is in a structure formed by crisscross steel bars and provided with a frame, and the upper end of the frame is provided with a cross beam, and the climbing frame comprises: The baffle bodies are detachably connected, a plurality of baffle bodies are connected to form a shielding plate, the shielding plate is used for shielding concrete filler splashed by the climbing frame in the casting process, the shielding plate is arranged on a frame beam of the climbing frame, and sealing strips are arranged on two sides of a joint after the baffle bodies are connected; The upper end of the baffle main body is provided with a clamping groove, the lower end of the baffle main body is provided with a clamping block, and the clamping block is detachably connected with the clamping groove; the top of the baffle body at the topmost end of the shielding plate is provided with a C-shaped groove plate near the top of one end of the climbing frame, the C-shaped groove plate is provided with a C-shaped groove, and the C-shaped groove is used for hanging the shielding plate against a frame beam of the climbing frame; The bottom of one end, close to the climbing frame, of the shielding plate main body is symmetrically provided with two double-layer stop lever mounting plates, two through holes are formed in one double-layer stop lever mounting plate, and the same central axis is arranged between the through holes between the two symmetrically arranged double-layer stop lever mounting plates; The stop lever is installed in a penetrating way inside two penetrating holes, and the length of the stop lever is greater than the length of one climbing frame. Optionally, the width of the baffle main body is matched with the climbing frame. Optionally, the cross section of joint groove is T type, the joint piece with joint groove looks adaptation, the joint groove with joint piece sliding connection. Optionally, the pin is solid steel pipe, the cross section of pin with the cross section looks adaptation of through-hole, the pin passes the through-hole. Optionally, the C type groove opening of C type frid is to climbing frame crossbeam, the shielding plate passes through C type frid is hung and is leaned on climbing frame crossbeam, the installation and the dismantlement of shielding plate of being convenient for. Optionally, a reinforcing rib is arranged on the shielding plate, and the reinforcing rib is used for improving the strength of the shielding plate; the reinforcing rib is arranged at one end of the climbing frame based on the shielding plate principle, and the reinforcing rib is in threaded connection with the shielding plate. Optionally, limiting blocks are arranged at two ends of the stop lever, and the diameter of each limiting block is larger than that of each through hole, so that the stop lever is prevented from falling off from each through hole. Optionally, the sealing strip is bonded with the seam of the shielding plate. The beneficial effects of the application are as follows: 1, the baffle main bodies are detachably connected with the clamping blocks through the clamping grooves, and the shielding plates are hung on the frame cross beams of the climbing frame through the C-shaped groove plates, so that the whole pouring baffle is easy and convenient to operate in the process of installation and disassembly, the construction efficiency is greatly improved, and the time and labor cost required by installation and disassembly are reduced. For example, disassembly and reinstallation can be accomplished quickly when the baffle position needs to be adjusted at different stages of construction. 2, After the baffle main bodies are connected, sealing strips are arranged on two sides of the joint, and the sealing strips are bonded with the joint of the baffle, so that concrete filler splashed in the concrete pouring process can be effectively prevented from leaking from the joint of the baffle, the shielding