CN-224228292-U - Maintainable safety net picking system
Abstract
The utility model relates to a maintainable safe net picking system which comprises a lower layer steel pipe fixing sleeve member, an upper layer guy rope fixing sleeve member, a lower layer steel pipe fixing sleeve member, a rope and a safety net picking device, wherein the lower layer steel pipe fixing sleeve member is fixed on a lower layer floor slab, the upper layer guy rope fixing sleeve member is fixed on the upper layer floor slab, one end of the safety net picking device is detachably connected with at least part of components in the lower layer steel pipe fixing sleeve member, one end of the rope is connected with the upper layer guy rope fixing sleeve member, the other end of the rope is connected with the other end of the safety net picking device, the safety net picking device is inclined between the upper layer floor slab and the lower layer floor slab in a protective state, and the safety net picking device is retracted and maintained in a state. The utility model is divided into two cases of picking out a protection state and a recovery maintenance state, and the two states can be switched by adjusting the lower layer steel pipe fixing sleeve. The later-stage dismantling of the safety net picking does not need to use a tower crane for auxiliary operation, and can be realized only by disassembling the fastening piece of the steel pipe fixing sleeve member by workers.
Inventors
- LI XINRUI
- QIAO HANQING
- JIN KANG
- SUN JINGBO
- YU MIAO
- LU YUNXIAO
- LI GUANGLEI
- SHU JING
Assignees
- 中建三局集团北京有限公司
- 中建三局集团有限公司
Dates
- Publication Date
- 20260512
- Application Date
- 20241220
Claims (9)
- 1. A maintainable safe net picking system, characterized by comprising the following steps: The lower layer steel pipe fixing sleeve (1) is fixed on a lower layer floor slab; the upper layer inhaul cable fixing sleeve piece (2) is fixed on the upper layer floor slab; One end of the safety net (3) is detachable on the lower layer steel pipe fixing sleeve (1), and at least part of components in the lower layer steel pipe fixing sleeve (1) are detachably connected; One end of the rope (4) is connected to the upper layer inhaul cable fixing sleeve (2), and the other end of the rope is connected with the other end of the safety picking net (3); The safety net picking device comprises a safety net picking device, a safety net picking device and a safety net picking device, wherein the safety net picking device (3) picks out that a protection state (Z1) is obliquely arranged between an upper floor slab and a lower floor slab, and a recovery maintenance state (Z2) is achieved, and the safety net picking device (3) is recovered to the lower floor slab.
- 2. A maintainable safety net picking system according to claim 1, characterized in that the lower steel pipe fixing kit (1) comprises: The bottom buried plate (11) is fixed on the lower floor slab; The bottom layer vertical plate (13) is vertically fixed at the top of the bottom layer buried plate (11); And one end of the bottom layer transverse plate (12) is horizontally connected to the bottom layer vertical plate (13), and the other end of the bottom layer transverse plate is provided with a keel preformed hole (121).
- 3. The maintainable safety net picking system according to claim 2, wherein the bottom floor vertical plate (13) is provided with two fixing holes I (131), the two fixing holes I (131) are positioned on the same straight line, one end of the bottom floor transverse plate (12) is provided with a fixing hole II (122) opposite to the two fixing holes I (131), and the two fixing holes II are detachably connected through a fastener.
- 4. A maintainable safety net picking system according to claim 2, wherein the bottom burying plate (11) is provided with a plurality of anchor plate fixing holes (111).
- 5. A maintainable safety net picking system according to claim 2, characterized in that the upper layer guy fixing kit (2) comprises: An upper buried plate (21) which is provided with an upper buried plate fixing hole (211) and is fixed on an upper floor slab through a connecting piece; An upper vertical plate (22) is vertically fixed on the top of the upper buried plate (21), and is provided with a first perforation (221) connected with the other end of the rope (4).
- 6. A maintainable safety net picking system according to claim 5, wherein the upper riser (22) further comprises a reserved perforation two.
- 7. A maintainable safety picking system according to claim 5, characterized in that the safety picking (3) comprises: Four keels (31) forming a net frame; The first net body (32) and the second net body (33) are fixed in the net frame in a layered manner, and two double-layer net structures with different meshes arranged in a staggered manner are formed.
- 8. The maintainable safety net picking system according to claim 7, wherein two rope hanging points (G1) corresponding to the first through holes (221) of the two upper-layer guy fixing sleeve members (2) are arranged on the keels (31) corresponding to one end far away from the lower-layer floor, two keel connecting points (G2) connected with the two keel preformed holes (121) are arranged on the keels (31) corresponding to one end near the lower-layer floor, and the distance between the two rope hanging points (G1) is larger than the distance between the two keel connecting points (G2).
- 9. A maintainable safety net system according to any one of claims 1-8, wherein the ropes (4) are used as stay cables, both ends of which are fixed by means of a harness collar (42) and a rope clip (41), and rope ends are reserved.
Description
Maintainable safety net picking system Technical Field The utility model relates to the technical field of building safety auxiliary equipment, in particular to a maintainable safety net picking system. Background With the acceleration of the urban process, the scale of the building engineering is continuously enlarged, and the height of the building is gradually increased. Aloft work becomes an integral part of building construction, however, the risk of falling aloft also increases. In order to ensure the life safety of constructors, the safety net is widely applied to construction sites as an important high-altitude anti-falling device. The traditional safety net picking often has the problem of difficult later maintenance in practical application. Because of the limitation of the structural design and the complexity of the installation mode, the safety net picking is difficult to inspect, maintain and replace in the later period in the construction process. Through deep investigation of construction sites and analysis of past accident cases, the traditional safety net is broken to a certain extent due to falling impact of high-altitude objects in long-time placement, and the safety net is not provided with protection capability any more due to the breakage. And the existing construction safety net is fixed by the structural embracing column, so that the traditional construction safety net is difficult to replace and maintain in the later period if damaged. In addition, in the super high-rise public building, the construction period is often more than three years, even exceeds the service life period of the traditional safety net, and the traditional net has the defects of difficult disassembly, poor durability and the like, so that the applicability of the super high-rise public building is poor. Therefore, how to provide a maintainable safe net picking system which not only can provide more reliable safety guarantee for constructors, but also can prolong the service life of the net picking through convenient later maintenance and reduce the construction cost is a problem to be solved by technicians in the field. Disclosure of utility model Therefore, the utility model aims to provide a safe picking net which solves the defect that the existing safe picking net adopts a column holding fixing mode. The technical scheme of the utility model is a maintainable safe net picking system, which comprises: The lower layer steel pipe fixing sleeve is fixed on the lower layer floor slab; The upper layer inhaul cable fixing sleeve is fixed on the upper layer floor slab; One end of the safety net is detachable on the lower layer steel pipe fixing sleeve, and at least part of the parts in the lower layer steel pipe fixing sleeve are detachably connected; One end of the rope is connected to the upper layer inhaul cable fixing sleeve part, and the other end of the rope is connected with the other end of the safety picking net; the safety net picking and protecting state is obliquely positioned between the upper floor slab and the lower floor slab, and the safety net picking and protecting state is retracted and maintained to the lower floor slab. According to the technical scheme of the utility model, the lower layer steel pipe fixing sleeve comprises: the bottom buried plate is fixed on the lower floor slab; The bottom layer vertical plate is vertically fixed at the top of the bottom layer buried plate; And one end of the bottom layer transverse plate is horizontally connected to the bottom layer vertical plate, and the other end of the bottom layer transverse plate is provided with a keel reserved hole. According to the technical scheme of the utility model, the bottom layer vertical plate is provided with the first fixing holes, the first fixing holes are positioned on the same straight line, one end of the bottom layer transverse plate is provided with the second fixing holes opposite to the first fixing holes, and the bottom layer transverse plate and the first fixing holes are detachably connected through the fastening piece. According to the technical scheme of the utility model, a plurality of anchor plate fixing holes are formed in the bottom buried plate. According to the technical scheme of the utility model, the upper layer inhaul cable fixing sleeve comprises: the upper layer buried plate is provided with an upper layer buried plate fixing hole and is fixed on an upper layer floor slab through a connecting piece; The upper layer vertical plate is vertically fixed at the top of the upper layer buried plate and is provided with a first perforation connected with the other end of the rope. According to the technical scheme of the utility model, the upper vertical plate further comprises a reserved second perforation. According to the technical scheme of the utility model, the safety picking net comprises: Four keels to form a net frame; The first net body and the second net body are fixed in the net frame in