CN-224228293-U - Improved tunnel opening protective fence for building construction
Abstract
The utility model discloses an improved tunnel portal protection fence for building construction, which comprises a first fence body, a second fence body, a bolt buckle, a bolt assembly and a warning board, wherein two ends of the first fence body are respectively vertically connected with a first upright post, one end of the first fence body is connected with a first limiting plate, two ends of the second fence body are respectively vertically connected with a second upright post, one end of the second upright post is connected with a second limiting plate, the bolt buckle is respectively connected above the first upright post at the first limiting plate and above the second upright post at the second limiting plate, the bolt assembly is respectively connected above the first fence body at the end other than the first limiting plate and above the second fence body at the end other than the second limiting plate, and the warning board is detachably arranged on the fence body. The utility model has the advantages of good protection effect, convenient assembly and disassembly, convenient turnover use, low cost, effective prevention of falling of objects or false entry of personnel, improvement of the overall safety of the construction site, warning and reminding of passers-by, contribution to the management and maintenance of public areas and stronger popularization value.
Inventors
- LI GUISHAN
- GONG FUCAI
- PAN YU
- ZHANG YULIN
- Zu Jianfu
- LI LIN
- YE QIANGBO
- Zhou Chenguanghao
- WANG JUN
Assignees
- 云南建投第二建设有限公司
Dates
- Publication Date
- 20260512
- Application Date
- 20250324
Claims (10)
- 1. An improved opening protective fence for construction, comprising: The novel fence comprises a first fence body (1), wherein two ends of the first fence body (1) are respectively vertically connected with a first upright post (11), and a first limiting plate (12) is connected inside the first upright post (11) at one end; the two ends of the second fence body (2) are vertically connected with second upright posts (21) respectively, and the second upright post (21) at one end is internally connected with a second limiting plate (22); The bolt buckle (3), the bolt buckle (3) is connected above the first upright post (11) at the first limiting plate (12) and above the second upright post (21) at the second limiting plate (22) respectively; The bolt assembly (4) is respectively connected above the first fence body (1) at the end of the non-first limiting plate (12) and above the second fence body (2) at the end of the non-second limiting plate (22); The two groups of bolt buckles (3) and bolt assemblies (4) are matched with each other to connect the first fence body (1) and the second fence body (2) into a fence body, and warning signs (5) are detachably arranged on the fence body.
- 2. An improved opening protection fence for construction according to claim 1, characterized in that the first fence body (1) comprises: The first fence guard board (13), one end of the first fence guard board (13) is vertically connected with a first upright post (11), and the other end of the first fence guard board is vertically connected with a first connecting upright post (14); The first upright posts (11) are vertically connected to one end of the second fence guard plate (15), and the other end of the second fence guard plate (15) is hinged to the first upright posts (11) through a plurality of first hinges (16).
- 3. An improved opening protection fence for construction according to claim 2, characterized in that the first upright (11) and the first connecting upright (14) are both integrally square cylindrical members with open ends and hollow inside; The first fence guard plate (13) and the second fence guard plate (15) are square platy body members; the first hinge (16) is a fixed hinge or a detachable hinge.
- 4. An improved tunnel portal guard rail for construction according to claim 3, wherein a plurality of openings are formed through both the first rail guard plate (13) and the second rail guard plate (15); Wherein, still link up and set up the first connecting through-hole with the connecting plate adaptation of warning sign (5) in first stand (11) and first connecting stand (14) upper portion.
- 5. The improved tunnel portal protection fence for construction according to claim 1, characterized in that the second fence body (2) is identical to the first fence body (1) in shape, structure and size, and the second fence body (2) comprises a third fence guard (23), a second connecting upright (24), a fourth fence guard (25) and a second hinge (26).
- 6. The improved tunnel portal protection fence for building construction according to claim 1, wherein the first limiting plate (12) and the second limiting plate (22) are elongated plate-shaped components, the first limiting plate (12) is vertically connected to the inner side of a first upright (11) located at one end of a first fence guard plate (13), and the second limiting plate (22) is vertically connected to the inner side of a second upright (21) located at one end of a third fence guard plate (23).
- 7. An improved protection fence for an opening for construction according to claim 1, characterized in that the latch buckle (3) is connected above the first upright (11) at the opposite end of the first limiting plate (12), and the latch buckle (3) is connected above the second upright (21) at the opposite end of the second limiting plate (22); Wherein, the bolt buckle (3) is of a shape like a Chinese character ' ji ' or an omega ' integrally; The plug pin assembly (4) comprises: The bolt seat (41) is connected to the outer side above the second fence guard plate (15) close to the corresponding bolt buckle (3), and the bolt seat (41) is connected to the outer side above the fourth fence guard plate (25) close to the corresponding bolt buckle (3); The bolts (42) are respectively connected inside the two bolt seats (41) in a sliding and adjusting mode; Wherein, the outside of the middle part of bolt seat (41) has seted up rectangular slot, and the middle part below of bolt seat (41) has still seted up two bayonet sockets with bolt (42) adaptation.
- 8. An improved opening protection fence for construction according to claim 1, characterized in that the warning sign (5) comprises: the warning board (51) is provided with a safety warning language character; The mounting column (52) is connected to the middle part below the warning plate (51), and a plurality of mounting column connecting holes are formed in the lower part of the mounting column (52) in a penetrating manner; The warning board (5) is sleeved and mounted above at least one upright post, and the upright posts comprise two first upright posts (11), a first connecting upright post (14), two second upright posts (21) and a second connecting upright post (24).
- 9. An improved tunnel portal protection fence for construction according to claim 1 or 5, characterized in that the bottoms of the first fence body (1) and the second fence body (2) are also connected with a moving wheel (6), the moving wheel (6) is respectively connected below the first upright (11) and the first connecting upright (14) at the two ends of the first fence guard (13), and the moving wheel (6) is respectively connected below the second upright (21) and the second connecting upright (24) at the two ends of the third fence guard (23).
- 10. An improved protection fence for an opening for building construction according to claim 9, characterized in that the moving wheel (6) is a directional wheel or a universal wheel, and a brake device matched with the directional wheel or the universal wheel for completing work is further arranged on the directional wheel or the universal wheel.
Description
Improved tunnel opening protective fence for building construction Technical Field The utility model relates to a protection structure, in particular to an improved hole protection fence for building construction, which is mainly used for shielding and protecting some temporary unsealed reserved construction holes in the building construction and preventing the risk of careless falling of extraneous personnel or constructors, and belongs to the technical field of building construction safety protection. Background In general, in the process of building engineering construction, temporary unblocked holes, such as holes after pile foundation pore forming, reserved holes on floors, structural holes, and the like, often give a safety hazard to a construction site before the next construction is performed. According to the 4.2 regulations in the 'construction high-place operation safety technical Specification' JGJ, when the short side size of the non-vertical opening is more than or equal to 50cm, a protective railing or a horizontal protective measure is adopted, and when the short side size of the non-vertical opening is more than 150cm, a protective railing and a horizontal protective safety net are adopted. Therefore, the protection of the hole of the construction site is an essential link of engineering safety construction, and how to quickly install and detach the protection railing of the hole directly influences the progress and safety of engineering construction. At present, traditional entrance to a cave protection railing adopts the steel pipe fastener to set up and adopts the mode of plank, wire netting, although simple structure, but the effect is more single, because the material of steel pipe and operation workman's technical reason such as, the protection railing that the steel pipe fastener set up installs and removes speed and railing height, length, steel pipe interval etc. can not accomplish unification, and waste time and energy when adopting foretell steel pipe fastener to set up, occupation space is big, the protection effect is also relatively poor, to the construction of some town roads, a lot of protection is with the road warning sign that can only play single face protection or directly adopt the roadblock to carry out single face protection, and these protection components still can often be dismantled by other people and use its department of moving, cause the potential safety hazard, influence the safe civilized construction of whole engineering. Although the existing structure is designed with a device specially used for protecting a reserved hole in building construction, the protection device of the existing structure has the problems of complex structure, time and labor waste in the installation process, difficult transportation, large occupied area and inconvenient transportation, so that the protection effect is directly affected, potential difficulties and dangers are caused in the protection work, and potential safety hazards are brought; On the other hand, a plurality of protection devices are not provided with related safety protection warning signs or corresponding safety warning banners, the public and third parties cannot recognize the danger existing around the protection devices quickly, meanwhile, passers-by persons or vehicles cannot recognize the potential safety hazards quickly, so that constructors or other persons can not contact or fall into the protection devices carelessly, the accident occurrence risk is increased, even consequences are not supposed to be serious, the existing structure can be detached, but the existing structure is inconvenient to detach, assembly needs to be carried out one by one, and when some pavement protection is carried out, construction is carried out at the position where constructors are needed to frequently enter and exit, time and labor are wasted when the fence stability is reduced if the constructors are detached frequently, and the construction efficiency is affected. In some construction sites, some waste battens are often used for plugging reserved holes, so that safety accidents are avoided, and even special persons are used for taking turns to sit and care. On the other hand, the device is inconvenient to carry and move, and cannot be flexibly moved to a designated construction position according to the requirement of actual site construction, so that the device is quite inconvenient in all cases. Therefore, development of an opening protection fence with high practicability and high working reliability, which is convenient for assembly and disassembly, is a key point for solving the technical problems. Disclosure of Invention Aiming at the defects and shortcomings in the background art, the utility model improves and innovates the defects and aims at providing an opening protection structure with good protection effect and uniform style, according to the utility model, the fence with uniform patterns is processed by us