Search

CN-224228296-U - Fixing device for hanging life line in steel structure installation

CN224228296UCN 224228296 UCN224228296 UCN 224228296UCN-224228296-U

Abstract

The utility model provides a fixing device for hanging a life line in steel structure installation, which belongs to the field of high-altitude operation and comprises a first clamp, a second clamp, a lock catch, a limit buckle and a steel pipe column. According to the utility model, the first clamp, the second clamp, the lock catch, the limit buckle, the steel pipe stand column and the steel wire rope are designed, so that the steel pipe stand column and the steel wire rope can be quickly installed on I-shaped steel in a steel structure by means of the cooperation of the first clamp, the second clamp, the lock catch and the limit buckle when the steel wire rope is used, the steel wire rope is simple in structure, the safe and stable steel wire rope is provided for hanging a production line, and the stable hanging of the protection measures of installers is ensured.

Inventors

  • PAN JIAHUI
  • ZHANG WEI
  • YU QINSHENG
  • ZHENG HAONAN
  • CHEN JIANHUI
  • JI LISHUAI
  • YOU HANG
  • ZHANG ZHE
  • Bao Shaoshuai
  • Tian Shuailong

Assignees

  • 中国水利水电第六工程局有限公司

Dates

Publication Date
20260512
Application Date
20250429

Claims (7)

  1. 1. A fixing device for a steel structure installation lifeline hanger, comprising: The first clamp (2) comprises a side part (201) and a top part (202) fixedly connected to the top end of the side part (201), the side part (201) of the first clamp (2) corresponds to the first side surface of the I-steel (1) in the steel structure, and the top part (202) of the first clamp (2) is arranged at the top part of the I-steel (1) in the steel structure; The top surface of the side part (201) of the first clamp (2) is provided with a mounting opening (203), the second clamp (4) is arranged on the second side surface of the I-steel (1) in the steel structure, and the top end of the second clamp (4) is rotatably mounted on the inner side of the mounting opening (203) through a lock catch (5); The limiting buckle (6) is inserted into the inner side of the mounting opening (203), and the limiting buckle (6) is positioned on the back surface of the second clamp (4); The steel pipe stand (3), the bottom and the first anchor clamps (2) fixed connection of steel pipe stand (3), and install wire rope (7) on steel pipe stand (3).
  2. 2. The fixing device for hanging a steel structure installation life line according to claim 1, wherein the first clamp (2), the second clamp (4), the limit buckle (6) and the steel pipe stand columns (3) are all provided with a plurality of groups, the steel wire ropes (7) are connected with the plurality of groups of the steel pipe stand columns (3), and the steel wire ropes (7) are arranged in parallel with I-steel (1) in the steel structure.
  3. 3. The fixing device for hanging a steel structure installation life line according to claim 1, wherein a screw rod (205) is fixedly connected to the top surface of the top (202) of the first clamp (2), and the screw rod (205) is in threaded fit with the bottom end of the steel pipe upright post (3).
  4. 4. The fixing device for hanging a steel structure installation life line according to claim 3, wherein the screw rod (205) is sleeved with a ring body (206), the bottom of the ring body (206) is fixedly connected with a top sheet (207), the length of the top sheet (207) is larger than the thickness of the top portion (202) of the first clamp (2), and the top surface of the top portion (202) of the first clamp (2) is provided with a jack (204) corresponding to the top sheet (207).
  5. 5. The fixing device for hanging a steel structure installation lifeline according to claim 1, wherein the limiting buckle (6) is of a three-fork structure, and the middle fork leg of the limiting buckle (6) is longer than the two side fork legs of the limiting buckle (6).
  6. 6. The fixing device for hanging a steel structure installation lifeline according to claim 1, wherein the second clamp (4) is provided with a second transverse block towards the side surface of the I-steel (1) in the steel structure.
  7. 7. A fixing device for hanging a steel structure installation lifeline according to claim 1, wherein the side (201) of the first clamp (2) is provided with a first transverse block towards the side of the I-steel (1) in the steel structure.

Description

Fixing device for hanging life line in steel structure installation Technical Field The utility model relates to the field of high-altitude operation, in particular to a fixing device for hanging a life line in steel structure installation. Background The steel structure is a construction for carrying a structure of a building or a structure of a structure by using steel as a main building material and adopting various steel structures through a connection mode such as welding, rivets or bolts. The steel structure has the characteristics of light weight, high strength, high rigidity, convenient construction, good anti-seismic performance and the like, is widely applied to the fields of buildings, bridges and the like, and the steel structure construction mostly relates to high-altitude installation operation. According to the construction working condition, the installation personnel protection measures are difficult to set or higher cost investment is needed, safety facilities and labor protection articles cannot be used normally, and huge potential safety hazards exist. Disclosure of utility model In order to solve the problem that the construction working condition is difficult to set up the protection measures of installers in the high-altitude operation process of the steel structure, the utility model provides a fixing device for hanging a life line for installing the steel structure. In order to achieve the above purpose, the present utility model adopts the following technical scheme: A fixture for a steel structure installation lifeline hanger, comprising: The first clamp comprises a side part and a top part fixedly connected to the top end of the side part, the side part of the first clamp corresponds to the first side surface of the I-steel in the steel structure, and the top part of the first clamp is arranged at the top part of the I-steel in the steel structure; The top surface of the side part of the first clamp is provided with a mounting opening, the second clamp is arranged on the second side surface of the I-steel in the steel structure, and the top end of the second clamp is rotatably mounted on the inner side of the mounting opening through a lock catch; The limiting buckle is inserted into the inner side of the mounting port and is positioned on the back surface of the second clamp; the steel pipe stand, the bottom and the first anchor clamps fixed connection of steel pipe stand, and install wire rope on the steel pipe stand. As a further description of the above technical solution: The first clamp, the second clamp, the limit buckles and the steel pipe stand columns are all provided with a plurality of groups, the steel wire ropes are connected with the plurality of groups of steel pipe stand columns, and the steel wire ropes are arranged in parallel with I-steel in the steel structure. As a further description of the above technical solution: the top surface fixedly connected with screw rod of first anchor clamps, screw rod and the bottom screw thread fit of steel pipe stand. As a further description of the above technical solution: The screw rod is sleeved with a ring body, the bottom of the ring body is fixedly connected with a top sheet, the length of the top sheet is larger than the thickness of the top of the first clamp, and the top surface of the top of the first clamp is provided with a jack corresponding to the top sheet. As a further description of the above technical solution: the limit knot is the three fork structure, and the middle part fork foot of limit knot is longer than the both sides fork foot of limit knot. As a further description of the above technical solution: And a second transverse block is arranged on the side surface of the second clamp, facing the I-steel in the steel structure. As a further description of the above technical solution: The side of the first clamp faces the side face of the I-steel in the steel structure, and a first transverse block is arranged. The utility model has the beneficial effects that: According to the utility model, the first clamp, the second clamp, the lock catch, the limit buckle, the steel pipe stand column and the steel wire rope are designed, so that the steel pipe stand column and the steel wire rope can be quickly installed on I-shaped steel in a steel structure by means of the cooperation of the first clamp, the second clamp, the lock catch and the limit buckle when the steel wire rope is used, the steel wire rope is simple in structure, the safe and stable steel wire rope is provided for hanging a production line, and the stable hanging of the protection measures of installers is ensured. Drawings In order to more clearly show a fixing device for the steel structure installation lifeline hanging, the following figures are shown; FIG. 1 is a perspective view of the present utility model; FIG. 2 is an enlarged view of a portion of FIG. 1 at A; FIG. 3 is a front view of the present utility model; FIG. 4 is a cross-secti