Abstract

The utility model discloses a pile driver for building engineering construction, which belongs to the technical field of pile drivers and comprises a base, a first hydraulic rod, a pile driving assembly and a control module, wherein the bottom end of the first hydraulic rod is rotationally connected to the base, the output end of the first hydraulic rod is rotationally connected to the pile driving assembly, the bottom end of the pile driving assembly is rotationally connected to the base, and the base is provided with a spraying assembly and a spray head. According to the utility model, the angle of the piling component is controlled through the first hydraulic rod, when the piling component is in a horizontal state, the piling component is controlled to work through the control module, and meanwhile, water is supplied through the spraying component, so that the spraying nozzle sprays water, the piling component is cleaned, and then the equipment can be moved to the next position for piling.

Inventors

  • ZHANG YUNLONG

Assignees

  • 张运龙

Dates

Publication Date
20260512
Application Date
20250205

Claims (6)

  1. 1. The pile driver for the construction of the building engineering comprises a base (1) and is characterized by further comprising a first hydraulic rod (2), a pile driving assembly (3) and a control module (8); the bottom end of the first hydraulic rod (2) is rotationally connected to the base (1), and the output end of the first hydraulic rod is rotationally connected to the piling component (3); the bottom end of the piling component (3) is rotationally connected to the base (1); The base (1) is provided with a spraying assembly (4) and a spray head (5), the spraying assembly (4) is communicated with the spray head (5), and the spray head (5) is positioned above the base (1) and faces one side of the piling assembly (3); The control module (8) is fixedly arranged on the base (1) and is electrically connected with the first hydraulic rod (2), the piling assembly (3) and the spraying assembly (4).
  2. 2. The pile driver for building engineering construction according to claim 1, wherein the base (1) comprises a base table (11), a side groove (14) is formed in one side of the base table (11), and two groups of mounting blocks (13) are fixedly arranged on the periphery of the side groove (14); the bottom ends of the first hydraulic rod (2) and the piling component (3) are both rotationally connected to the mounting block (13), and the connection point of the first hydraulic rod (2) and the mounting block (13) is higher than the connection point of the piling component (3) and the mounting block (13); the base (1) further comprises a bracket (12) fixedly arranged on the base table (11), and a cross rod (15) positioned at one side of the side groove (14) is fixedly arranged on the bracket (12); The spray head (5) is fixedly arranged on the cross rod (15); The spray assembly (4) is fixedly mounted on the base table (11).
  3. 3. A pile driver for construction work according to claim 2, characterised in that the pile driving assembly (3) comprises a mobile frame (31) rotatably connected to the mounting block (13); Be equipped with fly leaf (32) and second hydraulic stem (33) in fly frame (31), second hydraulic stem (33) fixed mounting is in the top of fly frame (31), the output with fly leaf (32) are fixed, fly leaf (32) fixed mounting has motor (34), fly leaf (32) rotate and are connected with vertical drilling rod (35), the output shaft of motor (34) with drilling rod (35) are fixed.
  4. 4. The pile driver for construction engineering according to claim 1, wherein the spray assembly (4) comprises a water tank (41), a water pump (42) is arranged in the water tank (41), a water pipe (43) is arranged at the output end of the water pump (42), and the water pipe (43) is fixed with the spray head (5).
  5. 5. The pile driver for building engineering construction according to claim 2, wherein the bottom surface of the base table (11) is also provided with a mounting groove (16) and a chute (17), and a water receiving disc (6) is movably arranged in the chute (17); An electric telescopic rod (7) is transversely and fixedly arranged in the mounting groove (16), the output end of the electric telescopic rod (7) faces the edge groove (14), and the output end of the electric telescopic rod (7) is fixed with the water receiving disc (6); the electric telescopic rod (7) is electrically connected with the control module (8).
  6. 6. The pile driver for building engineering construction according to claim 5, wherein the water receiving disc (6) comprises a movable disc (61), a water outlet pipe (62) is arranged on the bottom surface of the movable disc (61), and a control valve (63) is arranged on the water outlet pipe (62); the movable disk (61) has a size larger than the size of the side groove (14).

Description

Pile driver for building engineering construction Technical Field The utility model relates to the technical field of pile drivers, in particular to a pile driver for building engineering construction. Background The existing pile drivers are of various types, for example, pile drivers using a hammer mode are used for directly driving piles into the ground, and screw pile drivers are used for drilling holes in the ground by using a screw type drill rod, and then the piles are put into the ground through the drill holes. Because its drilling rod is spiral among the prior art, after piling, often can take out a large amount of earth on its drilling rod, if there is earth too much, can cause negative effect to the drilling of next time, lead to punching effect not good, consequently need operating personnel clean the drilling rod after punching at every turn, current clean mode is usually through operating personnel manual get rid of earth, consequently reduced drilling efficiency. We have therefore proposed a pile driver for construction work in order to solve the problems set out above. The above information disclosed in this background section is only for enhancement of understanding of the background section of the utility model and therefore it may not form the prior art that is already known to those of ordinary skill in the art. Disclosure of utility model The utility model aims to provide a pile driver for construction engineering construction, which aims to solve the problem that the screw pile driver in the prior art proposed by the background art needs an operator to manually clean a drill rod frequently. In order to achieve the above purpose, the utility model provides a pile driver for construction of building engineering, which comprises a base, a first hydraulic rod, a pile driving assembly and a control module, wherein the first hydraulic rod is connected with the pile driving assembly; The bottom end of the first hydraulic rod is rotationally connected to the base, and the output end of the first hydraulic rod is rotationally connected to the piling component; The bottom end of the piling component is rotationally connected to the base; the base is provided with a spraying assembly and a spray head, the spraying assembly is communicated with the spray head, and the spray head is positioned above the base and faces one side of the piling assembly; The control module is fixedly arranged on the base and is electrically connected with the first hydraulic rod, the piling assembly and the spraying assembly. Preferably, the base comprises a base table, wherein one side of the base table is provided with a side groove, and two groups of mounting blocks are fixedly arranged at the periphery of the side groove; The bottom ends of the first hydraulic rod and the piling component are both rotationally connected to the mounting block, and the connection point of the first hydraulic rod and the mounting block is higher than the connection point of the piling component and the mounting block; The base also comprises a bracket fixedly arranged on the bottom table, and the bracket is fixedly provided with a cross bar positioned at one side of the side groove; the spray head is fixedly arranged on the cross rod; the spray assembly is fixedly mounted on the base table. Preferably, the piling component comprises a movable frame which is rotatably connected to the mounting block; the movable frame is internally provided with a movable plate and a second hydraulic rod, the second hydraulic rod is fixedly arranged at the top end of the movable frame, the output end of the second hydraulic rod is fixedly connected with the movable plate, the movable plate is fixedly provided with a motor, the movable plate is rotationally connected with a vertical drill rod, and the output shaft of the motor is fixedly connected with the drill rod. Preferably, the spray assembly comprises a water tank, a water pump is arranged in the water tank, a water pipe is arranged at the output end of the water pump, and the water pipe is fixed with the spray head. Preferably, the bottom surface of the bottom table is also provided with a mounting groove and a sliding groove, and a water receiving disc is movably arranged in the sliding groove; An electric telescopic rod is transversely and fixedly arranged in the mounting groove, the output end of the electric telescopic rod faces the edge groove, and the output end of the electric telescopic rod is fixed with the water receiving disc; the electric telescopic rod is electrically connected with the control module. Preferably, the water receiving disc comprises a movable disc, a water outlet pipe is arranged on the bottom surface of the movable disc, and a control valve is arranged on the water outlet pipe; The size of the movable disc is larger than that of the side groove. Compared with the prior art, the utility model has the beneficial effects that: (1) According to the utility model, the an